Dragon parachute test aborted

Because of the failure of the equipment unrelated to the parachutes, the helicopter pilot for a drop test of SpaceX’s crew Dragon parachutes on March 24, 2020 was forced to release the dummy capsule early, causing its loss.

“During a planned parachute drop test today, the test article suspended underneath the helicopter became unstable,” SpaceX said Tuesday in an emailed statement. “Out of an abundance of caution and to keep the helicopter crew safe, the pilot pulled the emergency release,” the statement added. “As the helicopter was not yet at target conditions, the test article was not armed, and as such, the parachute system did not initiate the parachute deployment sequence. While the test article was lost, this was not a failure of the parachute system, and most importantly, no one was injured. NASA and SpaceX are working together to determine the testing plan going forward in advance of Crew Dragon’s second demonstration mission.”

This issue, combined with the loss of a Falcon 9 first stage (on its fifth flight) during re-entry, because one engine failed to function properly, is making some news sources suggest that NASA will delay the planned May launch of Dragon’s first manned mission to ISS.

If NASA demands a delay of that May manned mission because of these two issues, it will demonstrate how truly insane our society has become. While the issue prevented the drop test, it involved the equipment that suspended the dummy capsule below the helicopter, not the parachute system. Furthermore, this test was one of the very last tests of the parachute system, following a test campaign during the past few months that has worked repeatedly on numerous tests.

As for the first stage loss, do I have to repeat again that it occurred on the stage’s fifth reuse, and after it had successfully launched its payload into orbit? SpaceX will be using a new first stage for the manned mission, and they have experienced no failures on a new first stage like this for literally years.

In a sane society, NASA would look at the overall context, and put aside these issues as irrelevant to their launch schedule. They, and SpaceX, will want to figure out what happened, but they should insist on proceeding on schedule for the May launch.

We are no longer sane however. I will not be surprised if they announce a further launch delay.

NASA to use private enterprise for space communications

Capitalism in space: NASA is now in the process of shifting from building its own communications satellites to communicate with ISS as well as many other Earth-orbiting NASA satellites to buying those services from the private sector, much as the agency has done with is cargo and crew ferrying service to the station.

This involves ground stations as well as upgrading its fleet of geosynchronous NASA-built TDRS satellites.

In addition, NASA is seeking industry assistance in replacing the Space Network, which provides communications for more than 40 missions including the International Space Station through government-owned Tracking and Data Relay Satellites (TDRS) and associated ground stations. “While the TDRS System is a fine investment that the government has made, for the future we are looking at commercial alternatives,” said Ted Sobchak, NASA Space Network project manager.

NASA plans a multistep campaign to encourage development of commercial space-based relay networks before the current TDRS spacecraft reach the end of their lives. “Based on past spacecraft performance, the newest generation of TDRS will remain operational well into the 2030s,” Younes said.

The original TDRS constellation of satellites, launched from 1983 to 1995, were actually built for a reasonable cost. At the time NASA did not try to put every bell and whistle on them, but focused instead on their basic mission and getting it launched for a reasonable cost. The management at NASA today almost certainly could not do this. Getting new satellites from competitive private companies will therefore save NASA money, and get the job done faster.

Astra Space suffers failure during launch dress rehearsal

Capitalsm in space: Astra Space, attempting again to complete its first orbital launch, suffered what they call “an anomaly” during a launch dress rehearsal countdown yesterday.

The “anomaly,” of which we presently have no description other than it has cancelled their launch attempt later this week and that no one was hurt, apparently was serious enough that they noted that the launch site is “still hazardous and should be avoided.”

The company has said that it expected it would take three launches before they succeeded in getting into orbit, so this failure probably does not worry them overally. At the same time, I suspect that expectation was for actual launches, not explosions during the countdown.

Bigelow lays off everyone

Bigelow Aerospace, builder of commercial space stations, has laid off its entire workforce, stating this was due to the lockdown by Nevada’s state government due to the Wuhan flu.

According to sources familiar with the company’s activities, Bigelow Aerospace’s 68 employees were informed that they were being laid off, effective immediately. An additional 20 employees were laid off the previous week.

Those sources said that the company, based in North Las Vegas, Nevada, was halting operations because of what one person described as a “perfect storm of problems” that included the coronavirus pandemic. On March 20, Nevada Gov. Steve Sisolak signed an emergency directive ordering all “nonessential” businesses to close.

A company spokesperson confirmed March 23 that the company laid off all its employees because of the governor’s order, and that it faced “fines, penalties and threats of having our business license revoked” if it remained open. The spokesperson added that the company planned to hire workers back once the emergency directive was lifted, although other sources interpreted the layoffs as a permanent measure.

Considering how Bigelow has allowed other commercial space station companies, such as Axiom, to move ahead of it, this decision is not surprising. The panic over COVID-19 only pushed it along.

Whether Bigelow as a company returns once the coronavirus panic subsides however remains an open question.

Astra to try its first orbital launch again this week

Capitalsm in space: After aborting its first orbital launch attempt at T-53 seconds, Astra has announced that it will to try its first orbital launch again this week.

They have not revealed the payload. They also admit that they will not be surprised if they fail to reach orbit, as they already assume it will take about three launches to iron out their rocket and systems.

Regardless, if they succeed, they will become the second company, after Rocket Lab, to successfully enter the smallsat market.

No word on whether they will live-stream the launch.

OneWeb faces bankruptcy, even as it is about to launch more satellites

According to reports today, OneWeb, one of two companies presently building a constellation of satellites for providing worldwide internet access, is facing a serious cash crunch and might have to file for bankruptcy.

The main investor, Softbank, apparently is short of cash due to bad investments, worsened further by the stock market crash due to the Wuhan virus panic this week. Furthermore, the panic has caused Arianespace, which is launching many of OneWeb’s satellites, to suspend all launches from its French Guiana spaceport.

OneWeb has already launched 74 satellites, with a Soyuz launch of 34 more from Russia tomorrow. While fewer than the 360 that its main competitor SpaceX has launched of its Starlink constellation, OneWeb doesn’t need as many based on constellation’s design to become operational. After tomorrow’s launch, OneWeb will have launched about 18% needed, compared to SpaceX’s 24%.

If OneWeb goes out of business, it will do great harm to both Russia’s launch industry as well as Europe’s Arianespace, both of which have contracts for launching most of OneWeb’s satellites. In fact, for Russia, OneWeb is pretty much the only commercial customer they have. If they lose that it will be a serious financial blow.

Similarly, Arianespace’s next generation rocket, Ariane 6, has had problems garnering contracts. Losing the OneWeb launches will also hurt their bottom line.

More Boca Chica residents move out, accepting SpaceX offers

More Boca Chica residents have accepted SpaceX purchase offers, and are finding other places to live.

While not all are thrilled with the circumstances, the article suggests that there is far more good will then unhappiness. It appears the excitement of what SpaceX is doing, and its willingness to give these residents special viewing privileges in the future, has done wonders to ease the pain for many of them for having to sell their homes.

It has also produced youtube channels providing 24 hour live streams of SpaceX operations.

SpaceX recovers both fairing halves from Starlink launch

Capitalism in space: The two reused fairing halves that SpaceX used in yesterday’s Falcon 9 Starlink launch were both successfully recovered.

Starlink V1 L5 is now the second time ever that SpaceX – or anyone, for that matter – has successfully reused an orbital-class launch vehicle payload fairing, while the mission also marked the first time that SpaceX managed to recover a reused Falcon fairing. The burn from booster issues certainly isn’t fully salved, as twin fairing catchers Ms. Tree and Ms. Chief both missed their fairing catch attempts, but both twice-flown fairing halves were still successfully scooped out of the Atlantic Ocean before they were torn apart.

The first reused fairing however was not recovered, making this recovery the first of used fairings. The company now has the ability to study them in order to better design future reusable fairings.

The article provides a lot of information about the difficulties of catching the fairings before they hit the water. It also notes that the reused fairings have all been fished out of the ocean, suggesting that in the end catching them in the ship’s nets will be unnecessary.

NASA confirms May target date for first manned Dragon flight

Capitalism in space: In announcing today it is beginning media accreditation for SpaceX’s first manned Dragon flight to ISS, the agency confirmed earlier reports from SpaceX that they are now aiming for a mid-to-late May launch.

Much can change before then. COVID-19 could get worse, shutting down all launches. The engine failure on yesterday’s successful Falcon 9 launch could require delays.

However, right now, things look good for May, which will be the first time since 2011 that Americans will launch from American soil on an American-built rocket, an almost ten year gap that has been downright disgraceful. Thank you Congress and presidents Bush and Obama! It was how you planned it, and is also another reason we got Trump.

Apollo 15 command module pilot Al Worden passes at 88

Their numbers slowly shrink: Al Worden, who orbited the Moon as commander of the Apollo 15 command module, has passed away at the age of 88.

For three days in 1971, Worden circled the moon as Dave Scott and Jim Irwin worked on the lunar surface — including driving a rover for the first time. Being a command module pilot has been called the loneliest job in humanity. In the spacecraft alone, not able to talk to anyone when the capsule was on the back side of the moon. But Worden told NPR in a 2016 interview, “I was pretty comfortable with being by myself.”

After Scott and Irwin returned from the lunar surface and the crew was on its way back home, Worden conducted a spacewalk, the first ever in deep-space. He ventured outside the capsule to retrieve film from the scientific cameras.

The link is to an NPR obituary, so of course it makes a big deal about the effort by the astronauts to make some extra money by selling postage stamp covers that they bought with them post-flight.

Worden remembers it this way, “Jim and I were told that this was something that happened on every flight. No big deal. Well, it turned out to be a huge deal.” Even though previous crews had profited off lunar souvenirs, it became a public relations nightmare for NASA. The three astronauts never flew again. Worden said he regretted what happened: “I think the flight speaks for itself. I think the science that we did on the flight speaks for itself.”

I always thought it was quite offensive that the American government, the press, NASA, and the public took offense then about this. These guys were not paid that much, slightly above an ordinary middle class salary, for doing something totally unique and incredibly dangerous. If they had a chance to make some extra cash on the side, all power to them.

This was just after the 1960s, however, and private enterprise and commercial profit was steadily going out of fashion. We as a culture had bought into the Soviet model of top-down government programs that were centrally controlled. For any of the individuals involved to make some independent cash for themselves was considered crass and corrupt.

Regardless, God speed, Al Worden.

SpaceX launches another sixty Starlink satellites

Capitalism in space: SpaceX today successfully launched another sixty Starlink satellites into orbit, using a reused first stage for the fifth time, the first time they have done this. They also for the first time reused the fairing, for the second time. All told, the cost for this launch was reduced by approximately 70% by these reuses.

However, during launch one 1st stage Merlin engine shut down prematurely, the first time since 2012. You can see the consequence of this during the re-entry burn. After the burn, the rocket seems far more unstable then normal. Soon after the video cut out, and they must have missed the drone ship upon landing, making it a failure. They intend to do a full investigation before their next launch.

The leaders in the 2020 launch race:

5 China
5 SpaceX
3 Russia
2 Arianespace (Europe)

The U.S. now leads China 8 to 5 in the national rankings.

One additional detail: At the beginning of their live stream, they touted Starship/Super Heavy, and put out a call for engineers to apply to work for SpaceX.

The launch is embedded below the fold.
» Read more

Falcon 9 aborts automatically at T minus 0

A SpaceX launch attempt today to put sixty more Starlink satellites into orbit aborted at T minus Zero when the rocket’s computer software shut things down just after the engines began firing.

I have embedded the video below the fold. According to the broadcast, they had “a condition regarding engine power,” suggesting that one or more of the Merlin engines did not power up as expected and the computers reacted to shut the launch down because of this.

Not surprisingly, they have not yet announced a new launch date.
» Read more

First launch of ULA’s Vulcan on schedule for 2021

Capitalism in space: According to ULA’s CEO, Tory Bruno, the company is on track to transition as planned from its Atlas 5 and Delta rockets to its new Vulcan rocket.

Just five Delta IV Heavy launches remain on the manifest, all NRO launches procured under the block buy Phase 1 methodology. Bruno expects the final Delta launch to occur in 2023 or 2024.

The workhorse of the ULA fleet, Atlas V, is expected to retire on a similar timeframe. Bruno says the launcher could be “done as early as 2022, or as late as 2024.” Atlas V will have to continue operations until its replacement, Vulcan, can be human-rated to launch the Boeing Starliner spacecraft.

…The first flight of Vulcan Centaur is on track for early 2021, with the first flight vehicle under construction, and more vehicles in flow, in ULA’s factory in Decatur, Alabama. Vulcan’s debut launch will carry the Astrobotic Peregrine lander to the moon for NASA’s Commercial Lunar Payload Services (CLPS) program. A second launch is currently planned for later that year, which will satisfy the Air Force certification requirement for Vulcan to launch military missions.

Bruno’s report is also good news for Blue Origin’s New Glenn rocket, since both will use Blue Origin’s BE-4 engine in their first stage. If ULA is on schedule, than Blue Origin also likely to be on schedule, meaning that come 2021 or so the U.S. will have at least three companies (including SpaceX) capable of putting large payloads into orbit. Moreover, Northrop Grumman is developing its OmegA rocket, which will compete for the same business.

The article also talks about the military’s launch procurement program, which supposedly will pick two of these launch companies to provide all military launches through the 2020s. That program however is certain to fail, as it will blacklist all other viable companies from bidding on military launches. I expect those companies will successfully sue and force the Space Force to accept bids from more than two companies.

And that is as it should be. Why the military wishes to limit bidding makes no sense, and is probably illegal anyway. As long as a company has a qualified rocket, its bids should be welcome.

Manned Dragon mission targeted for May

Capitalism in space: According to one SpaceX official, they are now aiming for a May target date for their first manned Dragon mission to ISS, even as they will maintain a launch pace of one to two launches per month.

SpaceX president and chief operating officer Gwynne Shotwell [said] that she expects at least one to two launches per month in the near future, whether they be for customers or for SpaceX’s own internet-satellite constellation, Starlink. “And we are looking at a May timeframe to launch crew for the first time,” Shotwell continued. That launch, called Demo-2, will send NASA astronauts Bob Behnken and Doug Hurley to and from the International Space Station (ISS) aboard SpaceX’s Crew Dragon capsule.

At that pace SpaceX will complete between 12 to 24 launches for the year. They had predicted they would complete 21, so this is in line with that prediction.

The last cargo Dragon to berth with ISS using robot arm

Astronauts yesterday used the robot arm on ISS to berth SpaceX’s cargo Dragon freighter, the last time a Dragon capsule will be berthed to the station in this manner.

The successful supply deliver marked the 20th time a SpaceX Dragon cargo capsule has arrived at the space station since May 2012. The mission, known as CRS-20 or SpaceX-20, also the final flight of SpaceX’s first-generation Dragon spacecraft, which the company is retiring in favor of a new Dragon capsule designed to dock directly with the space station without needing to be captured by the robotic arm.

I could put this another way that is more embarrassing to NASA. After twenty flights, the agency has finally admitted that SpaceX can design a spacecraft that can do automatic dockings, and is now willing to allow it.

That of course is a gross simplification. Nonetheless, the successful unmanned demo flight last year of SpaceX’s crew Dragon, docking directly with ISS, has proven SpaceX can do it. And since that crew Dragon is essentially the same design for SpaceX’s future cargo Dragons, it makes sense to shift from robot-arm-berthing to direct docking for all future Dragon flights.

SpaceX raises $500 million for Starship, twice the amount planned

Capitalism in space: In a just completed fund-raising round, SpaceX raised twice the investment capital proposed, $500 million instead of $250 million.

These funds are in addition to the $1.33 billion raised previously. And according to the SpaceX official in charge of their Starlink satellite constellation, most of this money is not for Starlink:

While SpaceX expects it will cost about $10 billion or more to build the Starlink network, [vice president Jonathan] Hofeller said the company’s fundraising so far has largely not been directed to the Starlink division, as “we’ve been able to fund the development of Starlink primarily from our internal businesses.” He declared the company is in a “different position” in how it raises funds compared to other companies that are building satellite networks. “That’s why, in general, we’ve been very quiet about what we’re doing because we don’t need to go out and raise money for this particular venture,” Hofeller said.

This means the $1.83 billion raised is almost certainly all for developing Starship/Super Heavy.

Can SpaceX build this new heavy lift completely reusable rocket for that price? Considering that it cost them $500 million to develop Falcon Heavy, and that much of the engineering work from that will be applicable for the new rocket, I am willing to bet that they can.

My prediction is further reinforced by the company’s recent activities testing Starship’s tanks at Boca Chica, Texas. Only two weeks after a test to failure (resulting in some spectacular fireworks), the company has apparently successfully completed new tank tests on the next prototype.

In other words, they blew up a prototype, were able to clean up the mess, redesign what failed, and test it successfully, in only two weeks. To say such a pace would be impossible for NASA and its big space contractors like Boeing is probably the biggest understatement I’ve ever made.

This success should not make anyone think that the challenge of building Starship/Super Heavy will be easy or fast. This effort will be cutting edge engineering that in many ways will be beyond that edge. SpaceX is guaranteed to have further test failures along the way. Their pace, management approach, and track record however shows that the company knows how to deal with such issues, and will thus be able to proceed to completion.

SpaceX successfully launches cargo Dragon to ISS

Capitalism in space: SpaceX tonight successfully launched a cargo Dragon freighter to ISS.

This is the third flight for this Dragon capsule. It was also the last flight of the company’s first generation Dragon capsules. The company also successfully landed the first stage, which was on its second flight. This was the fiftieth time they have successfully done this. I have embedded the launch video below the fold.

The leaders in the 2020 launch race:

4 China
4 SpaceX
2 Arianespace (Europe)
2 Russia

The U.S. now leads China 7 to 4 in the national rankings.
» Read more

Axiom and SpaceX sign deal for flying commercial tourists to ISS

Capitalism in space: Axiom, the commercial company that already has an agreement with NASA to build its own commercial modules for ISS, has signed an agreement with SpaceX to use its crew Dragon capsule to ferry one professional and three tourists to ISS, as soon as the second half of 2021.

The private crew members will spend at least eight days on the orbiting research platform, allowing them to enjoy “microgravity and views of Earth that can only be fully appreciated in the large, venerable station,” Axiom said in a statement.

Axiom said Thursday it has signed a contract with SpaceX to transport a commander “professionally trained” by Axiom and three private astronauts to the space station on a Crew Dragon spacecraft. The mission could take off as soon as the second half of 2021, Axiom said.

This is SpaceX’s second commercial customer for its Dragon capsule. Two weeks ago it signed a deal with Space Adventures to fly four tourists on a crew Dragon for up to five days.

DARPA finally picks Northrop Grumman for satellite servicing

Capitalism in space: Following the successful docking of Northrop Grumman’s Mission Extension Vehicle-1 (MEV) to a decommissioned commercial communications satellite on February 27, 2020, DARPA has finally selected that company as its partner in its government-funded satellite servicing program.

For reasons that have been puzzling, DARPA previously rejected the MEV and chose in 2017 as its partner what was then a mostly Canadian company, causing legal protests. That company however backed out of the program in January, and with the success of MEV, DARPA could no longer justify its strange aversion to Northrop Grumman.

Northrop Grumman had planned to market MEV to commercial companies. The infusion of support from DARPA will accelerate that process.

Florida to reconfigure Cape Canaveral roads to accommodate New Glenn

Capitalism in space: Because the first stages of Blue Origin’s New Glenn rocket will be so large and heavy, Florida is instituting a project to widen roads and move light and utility poles in order to accommodate the transport from the factory to the launchpad.

The road widening will make room for the stage, which must follow a route not usually used. The more direct route however requires the stage to cross a bridge that cannot take its weight. If New Glenn does begin to fly regularly, however, I would expect money will eventually be found to rebuild that bridge.

Blue Origin update on New Shepard and New Glenn

Capitalism in space: Blue Origin officials today provided an update on both its suborbital New Shepard spacecraft as well as its New Glenn orbital rocket.

First, the company’s CEO, Bob Smith, was quoted as saying that New Shepard would fly three more flights unmanned prior to its first manned flight, and that manned flight will occur before the end of this year.

Smith has made similar promises in the past, so if you are skeptical it is entirely understandable. They have already flown their second New Shepard craft six times successfully. It is unclear if they are they going with a new craft for these manned flights, or using this older test vehicle.

Second, the company released two short public relations videos touting the completion of the first fairing for their orbital New Glenn rocket. In addition, they still expect production of that rocket’s BE-4 engine to begin this year, with a first maiden flight next year.

That predicted launch date still fits the revamped schedule they announced back in October 2018, which suggests they have not experienced any major issues. The next year however will tell the tale.

Astra scrubs first orbital launch

Capitalism in space: Astra, competing for DARPA launch challenge, is about to attempt the first orbital launch of its Rocket 3.0. Live stream of launch embedded below.

The rocket is carrying three cubesats. DARPA’s goal is for the development of a rocket system that can very quickly go to launch. In this case Astra only found out what its payloads were about a month before launch, and had to proceed to launch in mere weeks. They will win $2 million. They can get another $10 million if they launch again by the end of March.

The launch went into an unplanned hold 53 seconds before launch. Their launch window extends to 6:30 pm (Eastern), so there is still a chance they can lift-off today.

They have now scrubbed the launch. No word yet on when they will reschedule. Their failure to launch today however means they will not win the $2 million launch challenge. It was unclear from the broadcast if they would win the $10 million if they manage two launches by the end of March. (According to this website, that award is also lost.) It was even unclear whether they would even try to launch their three cubesat payloads.

In fact, as I watched the post-scrub interviews, I began to get suspicious about this whole event. Astra has been very secretive about its work. They have never successfully launched before. Could this merely have been a demonstration that they could get a rocket set up on an empty concrete pad, with payload, in only a matter of weeks, knowing that the launch was simply impossible? I have no idea, but I do wonder.

My suspicions do not mean Astra won’t launch eventually. I just now have doubts they ever were ready today.

SLS likely launch mid- to late-2021

According to comments by one NASA official last week, the first flight of SLS will likely not occur until the middle or late 2021, a further delay than the most recent prediction of April 2021.

NASA Associate Administrator Steve Jurczyk said on Friday that the first launch of the Space Launch System (SLS) with an uncrewed Orion spacecraft, Artemis I, will take place in mid-late 2021. He also said NASA will award contracts “within weeks” for the Human Landing System (HLS) as NASA strives to meet the Trump Administration’s goal of landing astronauts on the Moon by 2024 — the Artemis program. Embracing Artemis is the first step towards a trillion dollar cislunar space economy according to space industry executive Tory Bruno who spoke at the same conference in Laurel, MD. He urged everyone to stop “squabbling” and support the program.

There is a lot more in the article, including a lot of advocacy by Jurczyk and others for Lunar Gateway. I also found certain aspects of the Trump administration’s effort to make their 2024 target date for manned lunar landing, specifically related to the quick development of that Human Landing System (HLS), somewhat concerning:

We can’t thrash on the requirements. So on HLS, we said 90 days, we’re going to nail down the requirements. And if we can’t agree, NASA’s just going to tell you, use ours. We’re going to negotiate technical standards. Either use ours or show equivalency to yours, but after 90 days if we can’t get agreement, you’re going to use ours. … 90 days and we’re done with Human Landing System requirements.

I am all for doing it fast but one needs to also do it smart. I wonder about this approach.

Jurczyk noted that the administration and NASA are doing a lot of work outlining their plans for the whole Artemis exploration program following that lunar landing, and hope to reveal it by the end of March. Since this program still remains unfunded by Congress, that announcement will be part of the political campaign to obtain those funds.

Explosion during static fire test of SpaceX’s Starship-SN1 prototype

Capitalism in space: It appears that about two seconds into a static fire engine test tonight of SpaceX’s Starship-SN1 prototype, something went wrong, there was an explosion, the prototype suddenly lifted into the air and then crashed to the ground in a bigger explosion.

The video below shows the event three times. We shall have to await word from SpaceX as to what happened. So far it appears that no one was hurt.

Falcon Heavy wins launch contract for NASA’s Psyche asteroid mission

Capitalism in space: NASA today awarded the launch contract for its Psyche asteroid mission, set to launch in July 2022, to SpaceX’s Falcon Heavy rocket.

The total bid price was $117 million, which according to the release includes “the launch service and other mission related costs.” Though this is higher than the normal price SpaceX charges for a Falcon Heavy launch ($100 million), it is far lower than the typical price of a ULA launch. Furthermore, Falcon Heavy has more power, so it can get the spacecraft to the asteroid faster.

Photos prior to MEV-1 docking to Intelsat 901 satellite

Northrop Grumman has released photos taken by its Mission Extension Vehicle-1 (MEV-1) as it approached the decommissioned geosynchronous communications satellite Intelsat 901, just prior to docking.

As this was the first ever rendezvous and docking with a geosynchronous satellite, these are the first photos ever of such a spacecraft in that orbit. It was also the first docking with a spacecraft not designed for docking. MEV-1 managed it by using the satellite’s engine nozzle as a docking port.

Intelsat 901 has been in orbit for 18 years, and was only decommissioned because it had run out of fuel. From the pictures it looked solid and undamaged, ready to go again.

SpaceX proposing big launch rate increase in Florida

Capitalism in space: According to documents filed with the FCC, SpaceX is planning a big increase in the number of launches from its two launchpads in Florida in the next few years.

SpaceX projects performing 38 launches from Florida in 2020, 30 from SLC-40 and eight from LC-39A. By 2023, the company projects as many as 70 launches, 50 from SLC-40 and 20 from LC-39A, an annual rate that holds steady through 2025. The vast majority would be Falcon 9 launches, although it expects as many as 10 Falcon Heavy launches a year, all from LC-39A.

These numbers include both Dragon cargo and crew launches, Starlink satellite launches, and a variety of other commercial customers, including launches into polar orbits, something that in the past was reserved for Vandenberg on the west coast, not Florida. The launch estimates are also likely high, as they come from an environmental assessment. SpaceX probably wants to get clearance for this many launches, just in case things go far better than expected. They will likely do less, though I would not be surprised if the numbers are still record-setting.

In addition, the documents outline SpaceX’s plans to build a mobile launch tower to accommodate national security payloads that must be installed on their rocket vertically. Falcon Heavy could provide this service, but right now its payloads get installed horizontally.

The coming small satellite revolution

Today I received a press release from the Universities Space Research Association (USRA), announcing a half-day symposium in Washington, D.C. on March 26, 2020 entitled ““The SmallSat Revolution: Doing More with Less.” The announcement was an invitation for the working press to register and attend, noting that the speakers will include, among others, Thomas Zurbuchen, NASA’s associate administrator science, Jeffrey Mamber, president of NanoRacks, and Patricia Cooper of SpaceX.

As interesting as this might sound at first glance, I will not attend. For one thing, it is on the other side of the continent, and I can’t afford to fly cross country for such a short meeting. For another, I don’t see the point. I attended a lot of these DC symposiums when I lived in Maryland, and though they were often very educational and the free food (paid for almost always by the taxpayer) was always enjoyable, I routinely found them somewhat lacking in newsworthy content.

Thirdly, and most important, yesterday I attended a much more newsworthy one day conference here in Tucson on exactly the same subject, dubbed the Arizona Academic CubeSat Symposium. Unlike the Washington event above — which will likely be a mostly superficial look at the burgeoning cubesat industry — yesterday’s symposium was focused on letting students and scientists describe actual and very ambitious cubesat projects presently under construction or design.

In less than seven hours I saw the following:
» Read more

VIPER lunar rover delayed, NASA seeks new bids for delivering it to Moon

NASA earlier this week revealed that it is delaying the launch of its VIPER lunar rover until 2023, even as it announced that it is seeking new bids from commercial companies for delivering it to Moon.

In the past two months NASA has apparently been trying to reorganize its unmanned lunar exploration, resulting it a variety of puzzling and sometimes sudden shifts in policy and direction. First they announced they are going to issue a request for proposals, then they delayed it, then they issued it only to withdrew it one week later, with no explanation.

This week’s announcement is another attempt to release this request, accompanied by the delay in VIPER. Though NASA says the delay is to allow “for upgrades so that the rover can conduct longer and more exciting science on the Moon”, I think instead it is to simplify it so that the commercial companies will be able to launch and land it. VIPER’s heritage designs come from an earlier NASA rover project dubbed Resource Prospector that was cancelled because it was going to be too expensive and complex. I think the private companies building landers for such a rover told NASA that they couldn’t handle those heritage designs, forcing NASA to rethink.

If my suspicions are true, this is actually a very good sign. NASA is allowing the private sector to guide it in ways to save money and work more efficiently. That guidance might cause some initial delays as NASA shifts course, but in the long run it will make for a better run operation, costing less while accomplishing more.

Starship moved to launch site

Capitalism in space: SpaceX’s Starship-SN1 prototype has been transported to its launch site at Boca Chica in preparation for a series of tests prior to its first launch hop, hopefully to a height of 12 miles.

Whether SN01 is still destined for flight, it’s safe to say that Starship SN01 tank testing could begin in a matter of days — SpaceX currently has early-morning roadblocks indicative of such testing scheduled from February 29th to March 2nd. SpaceX is likely to kick off by filling SN01 with water to check its tanks for leaks, followed by liquid nitrogen – chemically neutral but still incredibly cold. After that, SN01 would likely graduate to Raptor engine installation and a wet dress rehearsal (WDR) with liquid oxygen and methane before moving on to a static fire attempt, if all goes well.

I have embedded below the fold a fifteen minute video showing the transport operation. The pace is slow, so I suggest playing it at 2x normal speed, using the settings.

My immediate thought in watching this video is that SpaceX’s mobile transport vehicle certainly cost far less than the two mobile launchers NASA built for SLS (for a cost of about a billion dollars). In fact, SpaceX’s entire Starship development program will likely cost less than what NASA spent on just its mobile launchers.

» Read more

1 78 79 80 81 82 213