Bridenstine to hold press event at SpaceX on Oct 10

NASA yesterday announced that its administrator Jim Bridenstine will hold a press event with Elon Musk at SpaceX headquarters this coming Thursday, October 10.

Also at this event will be the two astronauts who have been assigned to fly on the first demo mission of SpaceX’s manned Dragon capsule.

I am speculating, but I suspect that they will be announcing the launch schedule for both this manned mission as well the launch abort test that must precede it.

Capsule and booster for SpaceX launch abort test arrives in Florida

Capitalism in space: The Dragon capsule and Falcon 9 first booster for SpaceX’s launch abort test have both arrived in Florida and are being readied for flight.

SpaceX’s launch license suggests this test will occur no earlier than November 1, so it looks like the company is getting close. However, don’t hold your breath about the manned launch. It appears that NASA is still hassling SpaceX “with certification and safety reviews,” which in plain language is mostly paperwork and filling out forms that NASA’s safety panel can then rubber stamp.

Italy buys tickets on Virgin Galactic’s suborbital VSS Unity

Capitalism in space: Italy yesterday announced that it has purchased seats on Virgin Galactic’s suborbital VSS Unity for a research flight sometime in 2020.

The deal marks the first time a government has bought a ride on a private, suborbital space mission to conduct any kind of human-led experiments. The first research flight could take place as early as next year, the company said. “We’re delighted to work with the Italian Air Force to further space-based research and technology development through this historic mission,” Virgin’s chief executive, George Whitesides, said in a news release.

The contract announcement, plus the 2020 mission date, both lend some weight to Virgin Galactic’s recent claims that it will begin commercial operations next year. However, forgive me if I remain skeptical. Virgin Galactic and Richard Branson have been making promises like this for more than a decade, with none ever coming true.

Right now I will only believe it when they actually do it.

Blue Origin hints at the New Shepard ticket price

Capitalism in space: For the first time a Blue Origin official has provided a very rough estimate of what the company will charge per ticket for someone to take a flight in its suborbital New Shepard spacecraft.

But today, Blue Origin CEO Bob Smith hinted at a ballpark figure. “It’s going to not be cheap,” Smith said at TechCrunch’s Disrupt SF conference.

Although he stressed that the price for passengers hasn’t yet been published, he indicated that Blue Origin now has a price range in mind. “Any new technology is never cheap, whether you’re talking about the first IBM computers or what we actually see today,” Smith said. “But it’ll be actually in the hundreds of thousands of dollars for people to go, initially.”

Smith added that over time, “we’re going to get this down to the point where middle-class people” can afford a ticket to space. [emphasis mine]

This price sounds somewhat comparable to the prices being offered by Virgin Galactic. For the first people who had been willing to put down a deposit years ago they will pay $250K. Future buyers will pay more, at least at first.

Of course, neither company appears ready to put passengers on board, though both seem finally close and aiming for commercial flights no later than 2021. (Having said that, please don’t quote me, as I don’t really believe it, based on the endless delays coming from both companies.)

Relativity raises $140 million in third funding round

Capitalism in space: The new smallsat rocket company Relativity announced yesterday that it has raised $140 million in its third funding round, providing it enough funding to complete and launch its Terran 1 rocket.

The new round brings the total raised by the Los Angeles-based company to $185 million. The new funding, Relativity executives said, will be sufficient to complete development of its Terran 1 rocket and begin commercial operations in 2021. It will support expansion of its headquarters and establishment of a factory for rocket production at the Stennis Space Center in Mississippi, where it currently tests its engines.

“That round will carry us past first flight of Terran 1,” said Jordan Noone, co-founder and chief technology officer of Relativity, in an interview. “This round is all the capital required to get to first flight, build out more of the Mississippi test site, Launch Complex 16 in Florida and expand our L.A. headquarters and manufacturing.”

That first launch, once scheduled for late 2020, is now planned for February 2021. “That original prediction for when first flight would be was made about four years ago, so moving it two months to the right here is not bad,” he said. Part of the reason for the slip is a decision to develop a larger payload fairing with twice the volume of the original one, based on feedback from prospective customers.

This all sounds very encouraging. The test will be their engineering concept to manufacture their rocket entirely by 3D printing, something no one has ever done before. If they experience any problems with this those launch dates will immediately be threatened.

Musk on Starship, engineering, and management

Several listeners have sent me the link to a fifteen minute interview with Elon Musk that took place the day of his big Starship speech on September 30.

I have embedded it below. Watch it. It reveals several very important overarching things about SpaceX and Musk.

1. Musk calls himself SpaceX’s chief engineer, and during this interview he demonstrates why. He understands this stuff at more fundamental level that I think most similar big rocket company heads. This gives him the ability to distinguish good engineering from bad, and thus shape the company’s design direction more forcefully. It also makes him more similar to the early owners of American airplane companies (Douglas, Boeing, McDonnell, Northrop, etc), all of whom were engineers first and managers second. Too often today CEOs know little about the engineering behind their company, and therefore can be easily sidetracked by bad ideas.

2. At several points in discussing his management approach, Musk clearly wants to give an example of how bad management leads to bad engineering, but it is clear he censors himself. I suspect he is thinking of SLS, but does not want to say so to avoid a controversy he doesn’t need.

3. Much of the interview revolves around the aerospike nozzle, and why SpaceX hasn’t used it. It appears Musk’s reason is that while it might make the exhaust of a rocket more efficient, it causes a loss of efficiency in combustion, and the trade-off isn’t worth it.

4. Finally, Musk’s openness to new ideas, even if they prove him wrong, is quite obvious. As he says,

If someone could show that we’re wrong, that would be great. If someone can show you a way to make your design better, this is a gift. I would be like, thank you! Wow, this is awesome. The worst thing would be that we want to do a dumb design and stick with our dumb design. That would be insane.

This is one of those moments where I think he is thinking of SLS, but doesn’t come right out and say so.

Rocket Lab sets next launch date

Capitalism in space: Rocket Lab yesterday announced its next launch window, beginning on October 15, while adding that it has switched out the payload planned for that commercial launch.

The launch, scheduled for a two-week window starting October 15, will take a single spacecraft created by Astro to low Earth orbit. Corvus — the genus to which crows and ravens belong — is the name of the series of imaging satellites the company has already put up there; hence the name of the mission.

But this mission wasn’t scheduled to launch for some time yet. October’s launch, the fifth this year from Rocket Lab, was set to be another customer’s, but that customer seems to have needed a bit of extra time to prepare — and simply requested a later launch date.

Rocket Lab correctly touts this late and fast switch as an example of its ability to provide on-demand service to its customers. Making a switch like this is rare in rocketry.

At the same time, Rocket Lab had hoped to launch as many as sixteen times in 2019, with launches occurring monthly beginning in the spring. They have not come close to that pace, and right now it does not look like the company will top ten launches in 2019. and will likely do much less.

Whether this is indicative of problems at Rocket Lab, or with its various customers, is not clear, though I suspect the latter. The rocket has been reliable and operational now for more than a year.

Musk’s speech: Starship is coming on fast!

Musk standing at base of Starship Mk1

Elon Musk has begun his speech. The image to the right shows him as a tiny figure at the base of the just completed Starship Mk1 prototype. I will be adding details here as the speech proceeds.

First, he wants to inspire and thinks making humanity a multi-world species is the way to do it.
Then, to make us multi-world species requires a completely reusable rocket, what he called “the holy grail of space.”
Next, he goes back to the beginning of SpaceX, the first launch of Falcon 1 on this date years ago. “Getting to orbit is hard. We were very naive.”

From here he discussed Grasshopper, and noted that Starship Mk1 will do the a bigger version of that “in one to two months.” To repeat, they will be doing that quickly, and will be aiming for orbital flights in six months.

He is interspersing the speech with videos, of Falcon 1 launching, of Grasshopper, of Falcon Heavy, I think to illustrate how far SpaceX has come in such a short time. For example, he notes that Falcon Heavy’s first launch was only last February.

He is now outlining Starship as planned. Starship is now expected to be at 120 tons in mass, more than first planned. It will be able put 150 tons in orbit with full reuseability.

Next, getting it back to Earth in reusable form: It will return in many ways like the shuttle, but with its own uniqueness. “It will fall like a skydiver, then become vertical, and land.”

Next, the Raptor engines: Starship will have six, three able to adjust their nozzle and three fixed and optimized for efficiency. The Mk1 prototype has the three adjustable, since these will be used for landing. The other three engines will be for getting into orbit.

The heat shield and hull: They are going to use hexagonal ceramic tiles in the thermally critical areas. Everything else will use stainless steel, which he says is actually stronger when hot them some traditional rocket materials. It also has a high melting point. “You don’t need any shielding on the leeward side.” It is also much cheaper than carbon fiber, and much easier to use, shape, weld, install.

Super Heavy booster: Now estimating it will have 37 Raptor engines, but this number will be changeable, even when it is operational. The fins will be legs (just like the 1950s sci-fi movies!).

Final complete stack, both Starship and and Super Heavy, will be 2 1/2 times taller than Starship Mk1, as shown in the image above. They then showed a simulation of a launch, which I am sure will be online very shortly.

To get to either the Moon or Mars Starship will require refueling in orbit. This technology he considers essential. It will require rendezvous and docking, a skill they are learning with their manned Dragon.

He is also outlining the need to go to both the Moon and Mars, and then beyond. However, his first focus is on finding “the fastest path to building a city on Mars.”

His larger focus is making us multi-planetary, in order to preserve both our existence and all life on Earth. “And we should do it now!”

To sum up, the gist of the speech was to outline how far the entire company has come in a very short time, where they think they are going in the near future with Starship — and that’s the very near future — and then to conclude with Musk’s longer term vision for space exploration. Overall, it appears the goal was to once again sell Starship and the magnificent possibilities it might achieve.

Stratolaunch has begun hiring again

Capitalism in space: After a retrenchment where the company trimmed its staff last year, Stratolaunch has now begun hiring again.

Allen founded the venture in 2011, with the goal of using what is now the world’s largest airplane as a flying launch pad for orbital-class rockets and space planes. But after his death at the age of 65, Stratolaunch trimmed its staff dramatically. Some saw April’s test flight at California’s Mojave Air and Space Port as primarily a tribute to Allen, and as the prelude to either a sale or a shutdown.

Representatives of the Allen family’s Vulcan holding company have insisted that Stratolaunch remains operational. LinkedIn listings indicate that Jean Floyd is still president and CEO, although three company vice presidents left in July.

Now Stratolaunch is posting 11 job openings, including listings for two test pilots. “As a test pilot on the history-making Stratolaunch Carrier Aircraft, the world’s largest-wingspan aircraft, you will have the opportunity to accomplish new milestones in aviation,” the company says. The pilot positions are among nine openings in Mojave, with two openings (for a purchasing agent and a contract specialist) based in Seattle.

It however remains unclear the exact manner in which their giant plane Roc will be used. So far there appears little interest in using it, in conjunction with Northrop Grumman’s Pegasus rocket, to launch satellites. It could be that the plane might instead be used in connection with ground-based operations.

More Starship teasers from Musk

Musk continues to tweet out tiny teasers about the construction and design of the first Starship prototype being built at Boca Chica, dubbed Mk1.

[T]his prototype — the second Starship test vehicle, after the single-engine Starhopper, which was retired last month — will stand 165 feet (50 meters) tall and weigh 1,400 tons when fueled up (and 200 tons when “dry”). But that weight should come down in subsequent iterations, Musk added. “Mk1 ship is around 200 tons dry & 1400 tons wet, but aiming for 120 by Mk4 or Mk5. Total stack mass with max payload is 5000 tons,” he said in one of yesterday’s tweets.

In another tweet, Musk revealed the number of landing legs the Mk1 will have: “Six. Two windward, one under each fin & two leeward. Provides redundancy for landing on unimproved surfaces.”

Musk has previously said that the Mk1 and the Mk2 — a similar prototype being built at SpaceX’s Florida facilities — will be powered by at least three of the company’s next-generation Raptor engines. And today (Sept. 26), he tweeted three photos showing what that three-engine alignment looks like.

Both the Mk1 and Mk2 will start out making suborbital flights, but the goal is to get them to orbit eventually, Musk has said.

He will be giving a major speech on Starship tomorrow at Boca Chica. I have not been able to find any information as yet detailing the time and where to watch, but this will come clear I am sure very soon.

Liberace – Malaguena

An evening pause: Stay with it, because after the music Liberace and Sammy Davis do some comedy and a dance number that is pure light-hearted entertainment, the kind of thing that was normal on television in the 1960s, and now seems so difficult for modern performers to achieve.

Hat tip Tom Biggar.

More delays for New Shepard

Capitalism in space: Bob Smith, the CEO of Blue Origin, revealed this week that the first manned flights of its reusable suborbital New Shepard spacecraft will likely not happen in 2019, as previously announced.

Blue Origin, which is headquartered in Kent, Wash., has filed plans with the Federal Communications Commission for at least two more New Shepard test flights from its test and launch facility in West Texas. These would be the 12th and 13th flights of the New Shepard test program.

On Tuesday, Blue Origin sought reauthorization of the next test flight for a six-month period running from Nov. 1 to next May. The existing authorization is set to expire on Dec. 1, which suggests that the company wants to reserve more time to prepare for the test.

Whether those next two test flights will use the capsule they have flown previously, or a new capsule, dubbed “RSS First Step”, that they intend to put the first people on, could determine how much of a delay to expect. That new capsule is built but it has never flown. If the next two flights use the previous test capsule, this would guarantee even more delays before Blue Origin flies people.

UK company buys space on Astrobotic’s first lunar lander

Capitalism in space: Spacebit, a United Kingdom company, has signed a deal to put an instrument on Astrobotic’s first lunar lander, Peregrine-1, set for launch by 2021.

Astrobotic was one of the three private companies awarded NASA contracts to build unmanned lunar landers to carry NASA instruments to the Moon. In addition, these companies could sell additional space to other private companies. According to the press release, Astrobotic already has a manifest of sixteen such contracts.

LauncherOne shipped to Mohave for launch prep

Capitalism in space: Virgin Orbit has shipped its first LauncherOne rocket to Mohave for final tests prior to its first launch, planned for sometime this year.

Virgin Orbit didn’t give a schedule for completing those tests and performing that orbital flight. Dan Hart, president and chief executive of Virgin Orbit, said at the World Satellite Business Week conference in Paris Sept. 11 that he expected those final tests be completed in a matter of weeks. “It will take a handful of weeks to get through a number of wet dress rehearsals, crew training, and verification of the system,” he said. “We’ll do one flight test with that rocket and then we’ll get to orbit.” He estimated the company would be ready for launch “in the middle of this fall.”

If that first orbital test flight is successful, they hope to do their first operational commercial launch before the end of the year.

My 2016 prediction that a LauncherOne will complete its first commercial launch before SpaceShipOne, continues to look likely, even though SpaceShipOne began development more than a decade before LauncherOne..

Musk shows off Starship

Capitalism in space: In a tweet on September 22 Elon Musk gave an update on the status of its Starship rocket.

His tweet provided a picture of crews attaching “rear moving fins” the what they are now calling Starship Mk1.

The photo showed the stainless steel hull of the rocket as SpaceX attached two large fins to the base. Starship is a massive, next-generation vehicle that Musk’s company is building to send cargo and as many as 100 people to the moon and Mars.

Musk is expected to make a major speech on September 28 on Starship’s status.

Some Boca Chica landowners reject SpaceX offer

Capitalism in space: SpaceX’s offer to buy the last homes in the hamlet of Boca Chica for its Starship spaceport has been rejected by some of the landowners.

Their reasons are obvious. They don’t want to move, and they also claim the appraisals SpaceX used to set its price, which the company claims is three times the value of the homes, are too low.

Although the Hawthorne, Calif.-based rocket company, in a letter dated Sept. 12 and sent via FedEx, is offering the Heatons three times the appraised value of their home, they say the offer isn’t close to what they’d need to sell. The appraisal conducted by SpaceX is several thousand dollars less than an appraisal the Heatons got through their bank five years ago, Terry said.

“I sent them an email the day after we got this letter, not being sarcastic or anything else,” he said. “I just told them the facts, that (their) appraisal is extremely low.”

If they obtained an appraisal five years ago that is less than SpaceX’s now, than SpaceX is certainly not offering them three times the value of their home.

SpaceX does not have the right to condemn these properties, as does the government. It must reach an equable deal with the landowners. In the case of the Heatons and several others, it sounds like this is going to take a lot of money. They want enough so that they can buy something comparable elsewhere.

Fred Astaire & Ginger Rogers – They Can’t Take That Away From Me

An evening pause: Another movie pause tonight, this time showing the films themselves. This clip includes two performances of this song, from two different Astaire & Rogers films. The first, from Shall We Dance? (1937), has Astaire singing the song, knowing that the Rogers character is leaving him. Of course she ends up not going.

The second clip is from The Barkleys of Broadway (1949), their last film together and done after a split of ten years. They knew then this would be their last film, and now the words have a meaning far greater than the story in the film. When they exit at the end of this song, they know it is pretty much for the last time.

Hat tip to Phil Berardelli, author of Phil’s Favorite 500: Loves of a Moviegoing Lifetime.

Senate appropriations bill slams new commercial space regulations

In releasing its report yesterday on the Senate’s appropriations bill for transportation and housing, the Senate appropriations committee has demanded the FAA’s review and revise its proposed new regulations for commercial space, intended originally to streamline the red-tape but instead increased it. From their report:

Prior to drafting the rulemaking, the FAA convened an Aviation Rulemaking Committee [ARC] consisting of both traditional and emerging commercial space companies. However, the draft rule does not include relevant language approved by a majority of ARC members, and as a result, the proposed rule fails to implement a streamlined and performance based approach to regulating an industry whose continued growth and innovation is critical to national security and civilian space exploration. The draft rule creates unnecessary barriers to entry for new companies, may prevent many operators from achieving or maintaining flight rates and cost efficiencies to support new space applications and markets, and fails to address the application of the regulations to future space port locations. The Committee encourages the FAA to reconvene the Streamlined Launch and Reentry Licensing Requirements ARC and consider a supplemental NPRM prior to issuing a final rule in order to meet an artificial deadline. [emphasis mine]

It appears the FAA has agreed to review the regulations, as demanded.

I found it amusing that the entire appropriations bill is dubbed THUD, for “Transportation/Housing and Urban Development”. Though this acronym choice had nothing to do with the FAA’s space regulation debacle, it certainly seems most appropriate.

Progress on Dragon parachute tests

It appears that SpaceX’s parachute testing for its Dragon manned capsule is finally satisfying the concerns of NASA and its safety panel, based on a Sept 17 NASA blog post.

In fact, SpaceX’s success has even forced NASA “to reevaluate its own [parachute] standards and certification processes.”

The article at the link also notes quite correctly NASA’s tendency to miss the forest for the trees, which is why it has forced SpaceX to do so much additional parachute testing, even though the company apparently had a solid understanding of its parachutes a long time ago.

[T]he space agency has been focused on parachutes and COPVs [the tank issues that caused the 2016 launchpad explosion] for years. This is primarily a result of NASA’s notoriously reactive approach to safety: SpaceX suffered two COPV-related Falcon 9 failures in 2015 and 2016 and has experienced an unknown number (likely 1-3) of anomalies during Crew Dragon parachute testing.

As a result, NASA has focused extensively on these two stand-out concerns. To an extent, this is reasonable – if you know things have a tendency to fail, you’re going to want to make sure that they don’t. However, prioritizing reactive safety measures at the cost of proactive safety would be a major risk, akin to getting in a car crash because you didn’t use a turn signal and then prioritizing turn signal use so much that you forget to look both ways before making turns. Sure, you will probably never get in the same crash, but you are raising the risk of new kinds of accidents if you overcorrect your attention distribution.

Either way, it increasingly appears that a manned Dragon mission might finally be getting close to launch.

Starlink satellite launches to dominate SpaceX’s 2020 launch schedule

According to statements made by an SpaceX official on September 10, in 2020 the bulk of all the company’s launches will be to launch satellites in its Starlink internet constellation.

SpaceX plans as many as 24 launches next year to build out the company’s Starlink network to provide broadband Internet service from space, following up to four more Starlink missions before the end of this year, according to SpaceX’s chief operating officer.

The rapid-fire launch cadence for SpaceX’s Starlink fleet will take up the majority of the company’s launch manifest next year with a series of missions taking off from Florida’s Space Coast, adding new nodes to a network that could eventually contain nearly 12,000 small satellites.

If they complete this schedule, then SpaceX could complete as many as 40 launches in 2020, when all its other backlogged launches are included.

At the same time, this schedule indicates the slowdown in the launch of geosynchronous satellites, as predicted by many in the launch business. The communications industry appears to be shifting to lower orbit constellations and smaller satellites, as illustrated by Starlink itself.

1 119 120 121 122 123 286