<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	
	>
<channel>
	<title>
	Comments on: More overruns in NASA&#8217;s SLS program, this time with the mobile launchers	</title>
	<atom:link href="https://behindtheblack.com/behind-the-black/points-of-information/more-overruns-in-nasas-sls-program-this-time-with-the-mobile-launchers/feed/" rel="self" type="application/rss+xml" />
	<link>https://behindtheblack.com/behind-the-black/points-of-information/more-overruns-in-nasas-sls-program-this-time-with-the-mobile-launchers/</link>
	<description></description>
	<lastBuildDate>Thu, 19 Mar 2020 15:51:50 +0000</lastBuildDate>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>
	<item>
		<title>
		By: JDubya_AZ		</title>
		<link>https://behindtheblack.com/behind-the-black/points-of-information/more-overruns-in-nasas-sls-program-this-time-with-the-mobile-launchers/#comment-1077724</link>

		<dc:creator><![CDATA[JDubya_AZ]]></dc:creator>
		<pubDate>Thu, 19 Mar 2020 15:51:50 +0000</pubDate>
		<guid isPermaLink="false">https://behindtheblack.com/?p=64275#comment-1077724</guid>

					<description><![CDATA[All the specifications and bureaucracy in government is what makes this a boon doggle.
I worked with WSTF in NM on a project that was specified in 2007, bid in 2008, awarded in 2010, then took us four (4) years to complete as we kept having to go through hoops and what was worth, NASA staff (as well as the contractor) took forever to approve of any items, drawings, etc. Their methods of receipt were archaic and test procedures took too much time (you literally spent the day to check list items, then on the following day, have to review before turning on power).
It&#039;s amazing we got to the moon in the first place.
Private business will do better, until gov&#039;t begins to regulate.]]></description>
			<content:encoded><![CDATA[<p>All the specifications and bureaucracy in government is what makes this a boon doggle.<br />
I worked with WSTF in NM on a project that was specified in 2007, bid in 2008, awarded in 2010, then took us four (4) years to complete as we kept having to go through hoops and what was worth, NASA staff (as well as the contractor) took forever to approve of any items, drawings, etc. Their methods of receipt were archaic and test procedures took too much time (you literally spent the day to check list items, then on the following day, have to review before turning on power).<br />
It&#8217;s amazing we got to the moon in the first place.<br />
Private business will do better, until gov&#8217;t begins to regulate.</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: commodude		</title>
		<link>https://behindtheblack.com/behind-the-black/points-of-information/more-overruns-in-nasas-sls-program-this-time-with-the-mobile-launchers/#comment-1077704</link>

		<dc:creator><![CDATA[commodude]]></dc:creator>
		<pubDate>Wed, 18 Mar 2020 23:33:46 +0000</pubDate>
		<guid isPermaLink="false">https://behindtheblack.com/?p=64275#comment-1077704</guid>

					<description><![CDATA[Even for a .gov program that&#039;s a budget buster. 

Littoral Combat Ship program only doubled the initial cost estimate per hull.]]></description>
			<content:encoded><![CDATA[<p>Even for a .gov program that&#8217;s a budget buster. </p>
<p>Littoral Combat Ship program only doubled the initial cost estimate per hull.</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: geoffc		</title>
		<link>https://behindtheblack.com/behind-the-black/points-of-information/more-overruns-in-nasas-sls-program-this-time-with-the-mobile-launchers/#comment-1077698</link>

		<dc:creator><![CDATA[geoffc]]></dc:creator>
		<pubDate>Wed, 18 Mar 2020 21:43:02 +0000</pubDate>
		<guid isPermaLink="false">https://behindtheblack.com/?p=64275#comment-1077698</guid>

					<description><![CDATA[@MDN - in their defense (I cannot believe I am defending them) I believe the design for the MLP changed several times during its construction and they had to redo major elements.  I.e The entire thing was a cluster-frack, except no natural gas or oil was retrieved.  

But this is a giant waste across the board.]]></description>
			<content:encoded><![CDATA[<p>@MDN &#8211; in their defense (I cannot believe I am defending them) I believe the design for the MLP changed several times during its construction and they had to redo major elements.  I.e The entire thing was a cluster-frack, except no natural gas or oil was retrieved.  </p>
<p>But this is a giant waste across the board.</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: MDN		</title>
		<link>https://behindtheblack.com/behind-the-black/points-of-information/more-overruns-in-nasas-sls-program-this-time-with-the-mobile-launchers/#comment-1077691</link>

		<dc:creator><![CDATA[MDN]]></dc:creator>
		<pubDate>Wed, 18 Mar 2020 20:30:47 +0000</pubDate>
		<guid isPermaLink="false">https://behindtheblack.com/?p=64275#comment-1077691</guid>

					<description><![CDATA[That is not an over run. That is a clear and absolute failure.

No. That is criminal negligence!

MHO anyway.]]></description>
			<content:encoded><![CDATA[<p>That is not an over run. That is a clear and absolute failure.</p>
<p>No. That is criminal negligence!</p>
<p>MHO anyway.</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: sippin_bourbon		</title>
		<link>https://behindtheblack.com/behind-the-black/points-of-information/more-overruns-in-nasas-sls-program-this-time-with-the-mobile-launchers/#comment-1077690</link>

		<dc:creator><![CDATA[sippin_bourbon]]></dc:creator>
		<pubDate>Wed, 18 Mar 2020 18:50:48 +0000</pubDate>
		<guid isPermaLink="false">https://behindtheblack.com/?p=64275#comment-1077690</guid>

					<description><![CDATA[Budget $234 million. 
Spent $927 Million.

That is not an over run. That is a clear and absolute failure.]]></description>
			<content:encoded><![CDATA[<p>Budget $234 million.<br />
Spent $927 Million.</p>
<p>That is not an over run. That is a clear and absolute failure.</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: wayne		</title>
		<link>https://behindtheblack.com/behind-the-black/points-of-information/more-overruns-in-nasas-sls-program-this-time-with-the-mobile-launchers/#comment-1077680</link>

		<dc:creator><![CDATA[wayne]]></dc:creator>
		<pubDate>Wed, 18 Mar 2020 17:10:16 +0000</pubDate>
		<guid isPermaLink="false">https://behindtheblack.com/?p=64275#comment-1077680</guid>

					<description><![CDATA[Casablanca 
1942
-The appropriate clip-
https://youtu.be/nM_A4Skusro
0:42]]></description>
			<content:encoded><![CDATA[<p>Casablanca<br />
1942<br />
-The appropriate clip-<br />
<a href="https://youtu.be/nM_A4Skusro" rel="nofollow ugc">https://youtu.be/nM_A4Skusro</a><br />
0:42</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: hondo		</title>
		<link>https://behindtheblack.com/behind-the-black/points-of-information/more-overruns-in-nasas-sls-program-this-time-with-the-mobile-launchers/#comment-1077677</link>

		<dc:creator><![CDATA[hondo]]></dc:creator>
		<pubDate>Wed, 18 Mar 2020 16:54:27 +0000</pubDate>
		<guid isPermaLink="false">https://behindtheblack.com/?p=64275#comment-1077677</guid>

					<description><![CDATA[I just wish they would take all their money and pile it into an actual space plane
Cargo and light.  Long overdue.  Have grown weary of rockets/roman candles lifting/muscling off.]]></description>
			<content:encoded><![CDATA[<p>I just wish they would take all their money and pile it into an actual space plane<br />
Cargo and light.  Long overdue.  Have grown weary of rockets/roman candles lifting/muscling off.</p>
]]></content:encoded>
		
			</item>
	</channel>
</rss>
