<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	
	>
<channel>
	<title>
	Comments on: Spacewalk to begin the reconfiguration of ISS successful	</title>
	<atom:link href="https://behindtheblack.com/behind-the-black/points-of-information/spacewalk-to-begin-the-reconfiguration-of-iss-successful/feed/" rel="self" type="application/rss+xml" />
	<link>https://behindtheblack.com/behind-the-black/points-of-information/spacewalk-to-begin-the-reconfiguration-of-iss-successful/</link>
	<description></description>
	<lastBuildDate>Mon, 23 Feb 2015 21:29:05 +0000</lastBuildDate>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>
	<item>
		<title>
		By: geoffc		</title>
		<link>https://behindtheblack.com/behind-the-black/points-of-information/spacewalk-to-begin-the-reconfiguration-of-iss-successful/#comment-718731</link>

		<dc:creator><![CDATA[geoffc]]></dc:creator>
		<pubDate>Mon, 23 Feb 2015 21:29:05 +0000</pubDate>
		<guid isPermaLink="false">http://behindtheblack.com/?p=33094#comment-718731</guid>

					<description><![CDATA[Move the MPLM (storage module) from the bottom of node 1 to Node 3. 

This means bottom of Node 1 and Node 2 have CBM ports open for Berthing Cargo vehicles.

Move the spare PMA from Node 3 to top of Node 2.  (Shuttle used front of Node 2 to dock).  

Now you have 2 cargo berthing ports, and 2 crew docking ports.  (NASA wants a backup available most of the time). 

Plus PMA&#039;s are getting extension modules added to allow the commercial crew vehicles to dock to them.  Brought up by a Dragon Cargo in the unpressurized trunk.  (CRS-7 and CRS-8 and then BEAM In a later CRS mission).]]></description>
			<content:encoded><![CDATA[<p>Move the MPLM (storage module) from the bottom of node 1 to Node 3. </p>
<p>This means bottom of Node 1 and Node 2 have CBM ports open for Berthing Cargo vehicles.</p>
<p>Move the spare PMA from Node 3 to top of Node 2.  (Shuttle used front of Node 2 to dock).  </p>
<p>Now you have 2 cargo berthing ports, and 2 crew docking ports.  (NASA wants a backup available most of the time). </p>
<p>Plus PMA&#8217;s are getting extension modules added to allow the commercial crew vehicles to dock to them.  Brought up by a Dragon Cargo in the unpressurized trunk.  (CRS-7 and CRS-8 and then BEAM In a later CRS mission).</p>
]]></content:encoded>
		
			</item>
	</channel>
</rss>
