Second test of Ares solid rocket scheduled
Alliant Techsystems (ATK) has scheduled the second test of the five segment solid rocket motor, planned for use on the Ares I rocket, for August 31. Fun quote:
When fired, the motor will produce a maximum thrust 3.6 million pounds, or 22 million horsepower [half the power of the first stage of the Saturn V rocket]. The cases [segments] have all previously flown on the space shuttle, collectively launching on 57 missions.
Alliant Techsystems (ATK) has scheduled the second test of the five segment solid rocket motor, planned for use on the Ares I rocket, for August 31. Fun quote:
When fired, the motor will produce a maximum thrust 3.6 million pounds, or 22 million horsepower [half the power of the first stage of the Saturn V rocket]. The cases [segments] have all previously flown on the space shuttle, collectively launching on 57 missions.