Indecision at Virgin Galactic over engine design

In the heat of competition: Sources at Virgin Galactic suggest that the company has still not made up its mind on the type of engine it will use on SpaceShipTwo.

Messier sums up the situation perfectly:

The lack of clarity about SpaceShipTwo’s main propulsion system is highly unusual. It’s difficult if not impossible to think of another space project that was uncertain about its primary propulsion system after nearly a decade of development.

Increasingly I do not see this spaceship ever flying, which saddens me. They had a ten year head start over everyone else, and have squandered it.

An update on Sarah Brightman’s astronaut training

The competition heats up: New detailed photos of Sarah Brightman’s training for her September tourist trip to ISS have been released.

The photos appear to dispel the rumors that Brightman might be replaced with her backup tourist for the flight to ISS.

Some might consider this flight nothing more than a publicity stunt. While it surely is that, for Brightman it also is a dream come true. And the publicity will not simply be good for her career, it will do wonders to sell the idea of space tourism and space exploration.

In fact, there is never really any downside to freedom and allowing people to follow their dreams, and this tourist flight to ISS will prove it.

Furniture for space!

Students at Rice University have built a chair and table expressly designed for use in a low gravity environment like the Moon or Mars.

The students interviewed astronauts to get an idea of what was needed, and did the design under NASA supervision. Their design is clever in that it can be packed easily, but I still wonder about the weight of transport. I don’t see the first explorers to Mars being able to afford bringing their furniture with them. I expect they will instead figure out ways to improvise chairs and tables from the materials on hand.

New Shepard makes its first test flight

New Shepard launch

The competition heats up: Blue Origin completed on Wednesday its first test flight of its reusable suborbital spacecraft, New Shepard.

After reaching an altitude of 307,000 feet, or 58 miles, the capsule successfully separated from its first stage, what they call the propulsion module, and safely parachuted back to Earth. The first stage, designed to also be recoverable, was not recovered successfully. According to Jeff Bezos’s explanation, they “lost pressure in our hydraulic system” and that they were trying to land it vertically, like SpaceX’s Falcon 9 first stage.

The cropped image on the right of the full resolution image, gives us a close-up of the capsule and propulsion module. The small fins on the propulsion module suggest the capability for a vertical landing, but it is unclear from the image whether the module has legs, though other images and videos strongly suggest there are legs on this module.

The flight itself, getting above 50 miles, reached space according to most definitions. In fact, Blue Origin with this flight has accomplished what Virgin Galactic has been promising to do for more than a decade, a suborbital test flight of its spacecraft. Blue Origin’s flight was unmanned, but it demonstrated that their design works. They will of course have to re-fly the capsule as well as land that first stage successfully to prove the design’s re-usability, but this flight shows that they are off to a very good start. And their webpage clearly shows that they are almost ready to start selling tickets for suborbital flights.

The most significant success of this launch, however, is the performance of the BE-3 rocket engine. Blue Origin has convinced ULA to hire it to build the engines for its new Vulcan rocket. This success justifies that decision.

I have embedded their videos of the full flight below the fold.
» Read more

Progress freighter declared lost

The Russians have declared lost the Progress freighter that had been launched to ISS yesterday.

They never could regain control of the craft, plus it was in an incorrect orbit. Moreover, the U.S. Air Force has detected debris nearby, suggesting a significant failure of some kind.

The Russians are now considering delaying the next manned launch, scheduled for May 26, while they investigate this failure. Both Soyuz and Progress use some of the same systems, including the radar system that failed on Progress, and they want to make sure the problem won’t pop up on the manned mission.

At the same time, they are also considering advancing the launch date of the next Progress to ISS from August 6.

Based on these reports, I think they might swap the launch dates for the two flights. A Dragon is scheduled to go to ISS in between these missions, though that schedule could be changed as well to accommodate the Russian plans.

Progress freighter in big trouble

A Progress freighter launched by Russia to ISS on Tuesday was placed in the wrong orbit, has not deployed its radar antennas needed for rendezvous, and is not responding properly to commands on the ground.

Whether it is in the wrong orbit might be an incorrect report, but other sources demonstrate clearly that the spacecraft is tumbling out of control. Based on all these reports, it does not look good for this vehicle. The crew on ISS, including the two astronauts on a year-long mission there, might have to do without these supplies.

Meanwhile Russia is proceeding with its plans to consolidate control of all aspects of its aerospace industry under the banner of a single government “super-corporation” run by Roscosmos. Considering the number of technical failures they have had with spacecraft and rockets in the past five years, it seems to me that this is the worst approach for solving these problems. Then again, Russian culture strongly favors a top-down authoritarian approach, so it might work better under this Soviet-style approach.

I don’t believe it, but we are going to find out in the coming decades.

Next Falcon 9 launch set for Monday

The competition heats up: The next commercial Falcon 9 launch is now set for tonight, Monday, less than two weeks after the last Falcon 9 launch.

The next two weeks will be especially busy for SpaceX, as they also have scheduled the first launch abort test of Dragon on May 5. The launch will also be the fifth for Falcon 9 this year, putting it in the lead as the busiest rocket in the world for 2015, ahead of the Russian Soyuz.

Russians cancel effort to fly humans from Vostochny by 2019

The heat of competition? In order to meet a government deadline to launch humans from their new spaceport at Vostochny, the Russians had planned, though now cancelled, a single manned launch there in 2019, using a new rocket.

Their cancelled plans had included two prior test flights of the rocket with Progress freighters.

If cargo missions were successful, the one brave crew would ride into orbit from the new spaceport, knowing that in case of a serious problem with the rocket, the descent module of the spacecraft would parachute into deep forest of the Russian Far East or somewhere in the Pacific.

After “satisfying” this political goal with a single crew, all manned Soyuz and cargo Progress missions would then revert back to Baikonur for a safe ascent trajectory. The Soyuz spacecraft would continue flying two missions annually from Baikonur, until the veteran spacecraft’s final launch in 2025. In 2021, Soyuz spacecraft missions originating from Baikonur would switch from Soyuz-FG to Soyuz-2-1a rocket.

The Russians have now decided, rather than rush this first flight on the new rocket, to hold to the slower schedule.

This story is important to the United States. I think we must definitely end our dependence on the Russians before they make the switch to the new rocket. Based on the levels of poor quality control and corruption seen recently in Russia, I have grave doubts the new rocket will fly reliably at first. It would be a mistake to buy its use to put Americans in space.

Seven big failed environmentalist predictions

Link here.

Like the author, I remember every single one of these doomsday predictions. I also remember how every single one of these predictions was wildly wrong. Until these fear-mongers can reliably predict things, I see no reason to believe them.

His article however does provide one entertaining tidbit:

You know how old I am? I’m so positively ancient that I remember when one of Jimmy Carter’s big answers to the impending shortage of oil was to increase federal funding for research on how to extract oil from shale. It ended the way you would expect: it went nowhere. But some decades later, private oil companies did find a way to more economically extract oil from shale—and environmentalists promptly made it public enemy #1.

All true. And just one more example of how the government fails at something while private enterprise, fueled by the profit motive, finds a way to make that exact same thing happen.

Russia launches criminal investigation at Vostochny

The Russian government has launched a large-scale investigation into the disappearance of 300 million rubles ($6 million) at their new Vostochny spaceport.

The criminal case was opened on the charges of large-scale embezzlement, the interior department said. According to a pre-investigation check, an agreement was signed in October 2014 between the client represented by the state special construction company and a contractor on fulfilling contractual work for building roads as part of the Vostochny cosmodrome infrastructure development, the interior department said. “The client under the contract made an advance payment of 300 million rubles to the contractor. However, the contractor did not start work and did not return the advance payment,” the interior department said, adding the investigation was continuing.

It appears the Russian government is finally tightening the screws at what appears to be widespread corruption at Vostochny.

I suspect the real problem here is not that the contractor pocketed some money illegally, it is that the contractor pocketed too much money illegally. Had he simply skimmed off a bit off the top but made sure construction proceeded, Putin and his gang would have gladly looked the other way. They skim off enough of their own too y’know, on numerous other projects. Skimming off so much that the project isn’t even built, howver, is unacceptable!

Russia ends effort to build a nuclear-powered rocket engine

The competition cools down! The Russian government has decided to shut down its research project to build a nuclear rocket engine for interplanetary travel in space.

The article doesn’t give a reason, but I suspect Russia’s continuing economic problems is the source.

The idea of using nuclear power for propulsion in space has been around since the 1960s, and has shown great promise. It would provide far more power for less fuel than any existing engine. The U.S. unfortunately abandoned this research in the 1960s, partly because of the cut-backs after winning the space race and partly because of environmental protests that fear anything to do with nuclear. If the Russians had followed through, it would have given them an advantageous position in any competition to colonize the planets.

Russia slashes spending on space

In the heat of competition: Economic hard times have forced the Russian government to cut spending on its space program by more than a third.

The cuts have mainly come from abandoning their effort to build a heavy lift rocket to compete with SLS. They might not realize it, but I think this will be a blessing in disguise, as they will no longer be wasting money building a giant rocket that will have little value in the competitive launch market. Instead, they will focus their investment on Angara, which has the possibility of earning them a profit.

Meanwhile, however, they still have to deal with the quality control problems and corruption that appears to permeate Russia`s entire aerospace industry: Russian defense rocket fails and crashes immediately after launch. I have posted the video of the crash below the fold. It appears that the rocket was successfuly propelled from its launch silo, but then its rocket engines never ignited.
» Read more

New Shepard test flights to begin within weeks

The competition heats up: Blue Origin is expected to begin regular test flights of its suborbital resusable manned spacecraft, New Shepard, within mere weeks.

This news came from a government FAA official involved in approving flight permits. The company itself has declined to comment.

Even if it is a few months rather than weeks, these flight tests will put more pressure on Virgin Galactic in the race to become the first commercial suborbital tourism company to sell and actually fly a passenger. And if I had to bet who’d win the race, I would no longer put my money on Virgin Galactic.

NASA ISS cargo contracts delayed

The competition heats up: NASA has delayed, for the second time, when it will award its next round of cargo contracts to ISS, pushing the date back from June to September.

Though agency officials said they could not reveal why they had delayed the contract awards, they did say it was to gather more information. My guess is that the agency wants to see how SpaceX’s launch abort tests turn out this year before it makes a decision. If successful, they will then have the option of dropping SpaceX’s as a cargo carrier and pick someone else, possibly Dream Chaser, to provide up and down service to ISS. That way, they would increase the number of vehicles capable of bringing people and supplies up to ISS.

Delaying the award decision until September gives them time to evaluate the abort tests results, as well as give them a cushion in case those tests get delayed somewhat.

More strikes at Vostochny

Another worker strike has broken out at the new Russian spaceport at Vostochny by workers who say they have not been paid their wages.

The strike itself is not the significant fact here. The significant fact is that even though the project has been under the close supervision of Putin himself since September, the wages were still not paid. Supervisors have been pocketing wages even as very high Russian officials have been publicly demanding that they get the construction back on schedule. And this story suggests that they continue to do so.

The entire situation implies a very extensive level of corruption at all levels of the Russian infrastructure, something that will make it very difficult for them to accomplish much in their future efforts in space.

Japan to the moon!

The competition heats up: Japan’s space agency has announced plans to send an unmanned lander to the Moon, as early as 2018, as part of a longer range plan to explore Mars.

They also intend to use their new Epsilon rocket to launch it.

Gee, I wonder if the successful efforts of India and China to send probes to both the Moon and Mars had some influence on this decision.

Incorrectly built SLS welding machine to be rebuilt

You can’t make this stuff up. A giant welding machine, built for NASA’s multi-billion dollar Space Launch System (SLS), needs to be rebuilt because the contractor failed to reinforce the floor, as required, prior to construction.

Sweden’s ESAB Welding & Cutting, which has its North American headquarters in Florence, South Carolina, built the the roughly 50-meter tall Vertical Assembly Center as a subcontractor to SLS contractor Boeing at NASA’s Michoud Assembly Facility in New Orleans.

ESAB was supposed to reinforce Michoud’s floor before installing the welding tool, but did not, NASA SLS Program Manager Todd May told SpaceNews after an April 15 panel session during the 31st Space Symposium here. As a result, the enormous machine leaned ever so slightly, cocking the rails that guide massive rings used to lift parts of the 8.4-meter-diameter SLS stages The rings wound up 0.06 degrees out of alignment, which may not sound like much, “but when you’re talking about something that’s 217 feet [66.14 meters] tall, that adds up,” May said.

Asked why ESAB did not reinforce the foundation as it was supposed to, May said only it was a result of “a miscommunication between two [Boeing] subcontractors and ESAB.”

How everyone at NASA, Boeing, and ESAB could have forgotten to do the reinforcing, even though it was specified in the contract, baffles me. It also suggests that the quality control in the SLS rocket program has some serious problems.

Update: The original story at Space News that I originally linked to disappeared sometime in the next week, and was replaced with a slightly more detailed and more positive story, now linked above.

Sierra Nevada and Germany sign agreement

The competition heats up: Sierra Nevada has signed a new development agreement with Germany in connection with its Dream Chaser reusable mini-shuttle.

The agreement does not appear to involve any money and thus is largely symbolic. Nonetheless, it shows again that Germany is interested in having Dream Chaser built, and is throwing its support behind the manned spacecraft.

Russia delays first manned launch from Vostochny

The Russian government has decided to delay from 2018 to 2020 the first manned launch from its new spaceport at Vostochny because an earlier launch would require them to use equipment they expect to retire anyway.

While the construction problems at Vostochny might be a factory in this decision, I also believe there is truth to the claim above. If they launch in 2018, they will probably have to use the Soyuz rocket to launch crews into space. By 2020 they plan to have Angara completely operational, and will be ready to retire Soyuz. Why build the infrastructure for Soyuz when you plan to retire it in only a couple of years anyway?

The delay however indicates a more fundamental problem with the Russian top-down authoritarian culture. It shouldn’t take them this long to get Angara operational. The rocket was conceived shortly after the fall of the Soviet Union in the early 1990s. They’ve had almost a quarter century to build it. Even though they’ve only just done the first two test flights, there is no justification for it to take another five years to get all the configurations of the rocket flying.

If they want to compete on the world market, they are going to have to work faster than this. A competitive private company, rather than delaying the launch, would have pushed Angara to be ready sooner so that the the launch could happen on time, with Angara. That the Russians seem unable to do this indicates that they will not be very competitive in the coming decades.

SpaceX is considering a ground landing for its next first stage return attempt

The competition heats up: After its second attempt this week to land its first stage on a barge in the Atlantic, SpaceX is now considering landing their next attempt on the ground.

This shouldn’t be a surprise. The reason they have been landing over the ocean in these initial tests was for safety. The last two landings however had demonstrated that they can reliably bring that first stage back accurately and precisely. Since they have the ability to destroy the stage should it go off course, it seems reasonable to shift to land now and simplify their challenge.

Stratolaunch considers multiple rockets for its giant airplane

The competition heats up: Stratolaunch is now considering widening its options for the upper stage that can be attached to its giant airplane.

[Chuck Beames, president of Seattle-based Vulcan Aerospace, the parent company of Stratolaunch Systems] said the interest in alternative launch options is driven by the growing interest in small satellites, for which the current Stratolaunch system is oversized. A smaller vehicle, he said, could be developed more quickly and less expensively. “It takes a more near-term focus on revenue generation,” he said.

Stratolaunch could eventually support several launch vehicles, he said, with varying payload capabilities to serve different customers. “We’ll likely have multiple launch vehicle options,” he said. “Some will be available earlier than others.”

It appears they are revising their launch system airplane into a modular design with a variety of upper stages, depending on customer. Note also the focus on the growing small satellite industry.

1 218 219 220 221 222 270