A FAA waiver granted to SpaceX for its next launch outlines details on the company’s effort to recover the first stage for reuse.

The competition heats up: A FAA waiver granted to SpaceX for its next launch outlines the details of the company’s effort to recover the first stage for reuse.

The first stage will coast after stage separation, and then perform an experimental burn with three engines to reduce the entry velocity just prior to entry. Prior to landing in the water, it will perform a second experimental burn with one engine to impact the water with minimal velocity. The second stage will coast and then perform an experimental burn to depletion.

Elon Musk has said that they will be experimenting with bringing the first stage back safely with each launch of the upgraded Falcon 9 rocket. This waiver now gives us the plan for the first launch. It also shows that they are also considering recovery of the second stage as well.

Engineers in India have decided to completely replace the leaking second stage engine of the GSLV rocket whose launch was scrubbed last week.

Engineers in India have decided to completely replace the leaking second stage engine of the GSLV rocket whose launch was scrubbed last week.

The GSLV is a three-stage launch vehicle with four strap-on motors hugging the first stage. The first stage is powered by solid fuel while the four strap-on motors and the second stage are powered by liquid fuel. The third is the cryogenic engine powered by liquid hydrogen and liquid oxygen.

“At the rocket assembly building, the satellite, cryogenic engine and the second stage have been destacked. It has been decided to shift the second stage to Mahendragiri for detailed inspection and study,” the ISRO official told IANS. He said ISRO has also decided to start assembling another engine so that the GSLV could fly at the earliest. Queried about the time-frame for the GSLV’s flight, he said: “It is not possible to give a time-frame for the GSLV’s flight now.”

Sierra Nevada’s engineering test vehicle of its Dream Chaser mini-shuttle completed its first capture carry flight test yesterday.

The competition heats up: Sierra Nevada’s engineering test vehicle of its Dream Chaser mini-shuttle completed its first capture carry flight test yesterday.

The test, which saw the lifting body space vehicle lifted by a Sikorsky S-64 to around 12,400 ft above the dry lakebed, follows completion of tow tests earlier this month. … During the Aug 22 flight the Dream Chaser’s flight computer, guidance, navigation and control systems were tested along with its landing gear and nose skid, which were deployed during the sortie.

Space agencies of the world unite!

On Tuesday NASA released what it calls a new “space exploration roadmap,” outlining the agency’s goals for the human exploration of space over the next few decades.

Normally I’d say, who cares? The space agency puts these kinds of PR roadmaps together periodically. None of them really ever mean that much. And in truth, this particular report doesn’t mean that much either. However, what makes this “Global Plan” interesting and worth mentioning is the participants who wrote it. It seems that NASA and the Obama administration didn’t do it alone.
» Read more

Japan’s unveiled its new Epsilon rocket yesterday, scheduled for its first launch next week.

The competition heats up: Japan’s unveiled its new Epsilon rocket yesterday, scheduled for its first launch next week.

Epsilon is a low-cost, high-performance, solid-fuel rocket co-developed by JAXA and IHI AEROSPACE Co.,Ltd. and designed to launch scientific satellites. Epsilon features the world’s first innovative launch system called “Mobile Launch Control” which allows for built-in checks to be conducted autonomously within the rocket’s system. This allows staff to focus on high-level monitoring, making overall performance very smooth. A spokesman joked that it is so easy to control that staff could monitor the rocket on their laptops while at Starbucks.

In the past Japan has not been very good at building cheap and efficient rockets. We shall see how this one does.

The launch today of India’s homemade Geosynchronous Satellite Launch Vehicle (GSLV) was scrubbed when a fuel leak was spotted at T-74 minutes.

The launch today of India’s homemade Geosynchronous Satellite Launch Vehicle (GSLV) was scrubbed when a fuel leak was spotted at T-74 minutes.

India has had trouble getting this powerful rocket off the ground successfully, with four previous launch failures. If they succeed this time, however, they will then have the ability to build their own rocket, capable of putting commercial payloads into geosynchronous orbit.

Assuming the first demo berthing of Orbital Sciences’ Cygnus capsule to ISS goes well in September, NASA has now scheduled the subsequent cargo missions of Cygnus and Dragon for December and January respectively.

Assuming the first demo berthing of Orbital Sciences’ Cygnus capsule to ISS goes well in September, NASA has now scheduled the subsequent cargo missions of Cygnus and Dragon for December and January respectively.

The second link above also provides some interesting details about the cargo that Dragon will carry in January.

Russia has concluded its investigation into last month’s Proton launch failure and now says its next launch will be on September 15.

Russia has concluded its investigation into last month’s Proton launch failure and now says its next launch will be on September 15.

While the investigation pinpointed the problem — the installation of sensors upside down — none of the news reports about this investigation have mentioned what any corrective actions the Russians are taking. Meanwhile, at least one unnamed Russian engineer is questioning the schedule and the thoroughness of the investigation.

Pigs in space

Today I have an op-ed in the Wall Street Journal, entitled “No liftoff for these space flights of fancy.” It is essentially a more detailed reworking of my rant on the John Batchelor Show on July 30.

My point is that the federal space program mandated by Congress, the Space Launch System (SLS), is never going to go anywhere, and is nothing but pork that should be cut as fast as possible. (See my essay from November 2011 on how NASA and the federal government can better use this money to get more accomplished in space, for less.)

The comments to the article have generally been positive and in agreement. Those who disagree mostly question the $14 billion cost per launch that I claim SLS will cost. That number comes from John Strickland’s very detailed analysis of what it will cost to build, complete, and operate SLS. However, it doesn’t require much thoughtful analysis to realize that this number is not unreasonable.
» Read more

ATK has joined Stratolaunch, winning a contract to provide solid rocket motors for company’s proposed second stage air-launched rocket.

The competition heats up: ATK has joined Stratolaunch, winning a contract to provide solid rocket motors for company’s proposed second stage air-launched rocket.

Stratolaunch’s first stage will take off from a runway, and will be the largest airplane ever built. The second stage, which Orbital Sciences is building and which ATK is now be a partner, will be released from this airplane and then ignite.

Russia has announced that they will resume Proton rocket launches in September.

Russia has announced that they will resume Proton rocket launches in September.

Though they have pinpointed the specific cause of the most recent launch failure, they have not yet announced any remedial actions. Note also the expected number of launches for the rest of the year, 4 to 5, is down from earlier expectations.

Meanwhile, in Kazakhstan, an official in that country’s space program has been arrested for taking bribes.

My rant Thursday against politicians on the John Batchelor Show

On my Thursday appearance last week on the John Batchelor Show John and I devoted the entire segment to talking about the sad state of NASA and how the partisan bickering in Congress is not only failing to deal with those problems, that bickering is intentionally disinterested in actually fixing them. As I say,

What both those parties in Congress and in the administration are really doing is faking a goal for the purpose of justifying pork to their districts, because none of the proposals they’re making — both the asteroids or the moon — are going to happen.

I intend to elaborate in writing on this subject in the next day or so. In the meantime, here is the audio of that appearance [mp3] for you all to download and enjoy.

Note that I specifically talked about the following stories during this appearance:

SpaceX has confirmed that it plans to begin vertical take-off and landing tests of a full scale Falcon 9 first stage.

The competition heats up: SpaceX has confirmed that it plans to begin vertical take-off and landing tests of a full scale Falcon 9 first stage.

The tests would be in New Mexico’s spaceport, and are essentially a scaled up version of the Grasshopper tests the company has been doing in Texas. It appears they are going to do these ground-up tests in conjunction with attempts on each future Falcon 9 launch to land the first stage.

The state of SLS construction.

The state of SLS construction.

The article is mostly focused on the engineering challenges of building a new rocket out of old pieces of the space shuttle. Kind of reminds me of Frankenstein. Nonetheless, I do get the impression for the first time that this heavy lift rocket will be built, and will fly at least once.

After that, however, I expect it to die from lack of funds. In fact, its history will probably parallel that of the Soviet Union’s Energia rocket, which flew twice, once to launch their shuttle copycat Buran and once to lift a failed payload whose purpose has never been clearly revealed. Soon thereafter came bankruptcy and the end of the Soviet Union, which couldn’t afford such a monstrosity. SLS will likely see a similar fate.

SpaceX has signed a contract with MDA to launch all three of Canada’s next generation Radarsat satellites.

The competition heats up: SpaceX has signed a contract with MDA to launch all three of Canada’s next generation Radarsat satellites.

MDA’s willingness to go with SpaceX prior to the September 5 launch of its Cassiope satellite on the Falcon 9 illustrates again the confidence they have in SpaceX. At the same time, this contract is for launches expected to occur around 2018, which is a long way away. Much can happen till then, including the possibility that SpaceX will go bust.

In other words, right now it is the successful launch of Falcon 9 that is of significance, not these new contracts. Only if those launches succeed will these contracts then become really significant.

1 250 251 252 253 254 270