SpaceX completes static fire tests of Falcon Heavy first stages

Capitalism in space: SpaceX announced today that they have completed static fire testing of the three first stages that will be used on the first Falcon Heavy test flight, tentatively scheduled for sometime in November.

That November launch remains very tentative. The launchpad still needs to be prepped, and these stages still have to be shipped to Florida, assembled, and then undergo at least one static fire test, as a unit. Despite these caveats, it is clear that that SpaceX is getting closer to that first Falcon Heavy launch.

Problems with 6 of 72 cubesats launched by Soyuz

Of the 72 cubesats launched by a Russian Soyuz rocket on July 14, 6 have unexpected problems.

Four of the 72 miniature satellites sent into orbit July 14 on a Russian Soyuz 2.1a rocket alongside the primary customer, the Kanopus-V-IK Russian Earth-imaging satellite, are not responding to commands from their operators and two additional cubesats are not in their intended orbits.

It appears that a variety of causes are behind the problems, not all of which are related to the Soyuz.

Posted from Torrey, Utah, just outside Capitol Reef.

SES flips satellites between SpaceX and Arianespace launches

Capitalism in space: In order to accelerate the launch of a needed satellite, SES
to flip the satellites between contracted SpaceX and Arianespace launches.

Their ability to do this now demonstrates the wisdom of SES’s policy in the past decade of aggressively supporting SpaceX. The result is that the company now has a much greater flexibility in how it gets its satellites into orbit.

Posted as we drove through Bynum, Montana.

Japan’s beginning shift to commercial space

Link here. The article provides a good sense of the state of Japan’s private space industry, which at this moment is generally restricted one company, Interstellar Technologies, and its as yet unsuccessful effort to launch a suborbital rocket. The following quote however helps explain why Japan has been unable to interest anyone in buying its H-2A rocket for commercial launches.

Launch costs associated with Japan’s main H-2A rocket are about ¥10 billion per launch (about $90 million), so miniature satellites often ride together with bigger satellites. A period of 50 days is required between launches, meaning the number of launches is low in Japan compared to countries including the United States, Europe, Russia, China and India. Large satellites are given priority in the launch schedule, so it is often difficult to choose a launch window for miniature satellites. [emphasis mine]

I think the $90 million price is a significant reduction from what JAXA used to charge. Fifty days to prep for launch however is ungodly slow.

Google Lunar X-Prize extends deadline

Capitalism in space: The Google Lunar X-Prize has announced that it has extended its contest deadline from the end of 2017 to the end of March 2018 for the finalists to complete their lunar rover mission and win the grand prize of $30 million.

They also announced several additional consolation prizes that all of the remaining five contestants can win should they achieve lunar orbit ($1.75 million) or successfully achieve a soft landing ($3 million), even if they are not the first to do it.

At least one team, Moon Express, will be helped enormously by the extra three months. This gives Rocket Lab just a little extra time to test its rocket before launching Moon Express’s rover to the Moon.

3D printing and how it will change what things look like

Link here. The article not only outlines some of the newer developments in 3D printing, it gives a nice look at how that technology is literally going to change what the things it builds look like.

Simple shapes are popular in human designs because they’re easy. Easy to design, especially with CAD, and easy to manufacture in a world where manufacturing means taking a big block or sheet of something, and machining a shape out of it, or pouring metals into a mold.

But manufacturing is starting to undergo a revolutionary change as 3D printing moves toward commercially competitive speeds and costs. And where traditional manufacturing incentivizes the simplest shapes, additive manufacturing is at its fastest and cheapest when you use the least possible material for the job. That’s a really difficult way for a human to design – but fairly easy, as it turns out, for a computer. And super easy for a giant network of computers.

The result: a stronger object, less weight, and less cost.

Rocket Lab looks to second test flight of Electron

Capitalism in space: Having completed its review of its first May test flight of its Electron rocket, Rocket Lab now looks to the second test flight.

The article gives a good overview of the results from the first test flight. It also has this tidbit:

The second of Rocket Lab’s three planned test flights is scheduled later this year. If that launch goes well, the company will likely delete the third demonstration mission, and the first commercial Electron flight could be ready for takeoff by the end of December, Beck said last week.

“We’ve got the next test flight rolling out out to the pad in about eight weeks’ time,” Beck said. “If it’s a really good clean flight, we’ll probably accelerate into commercial operations.”

If they follow this schedule, then the next flight will be in mid-October, and the Moon Express launch of its lunar rover will occur in mid-December, just in time to win the Google Lunar X-Prize.

SpaceX launch today

SpaceX is scheduled to resume launches at Kennedy, after a month of range upgrades by the Air Force. You can watch it live here, or here.

Launch is presently scheduled for 12:31 Eastern time to send a Dragon capsule to ISS. At the moment all looks good for an on-time launch.

The launch was a complete success, including a picture-perfect first stage landing at Kennedy.

1 187 188 189 190 191 307