Falcon 9/Dragon launch likely delayed to at least Thursday

The Falcon 9/Dragon test launch is likely delayed to at least Thursday. Key quote:

During reviews of vehicle closeout photos this morning, engineers found a possible crack in the second stage engine nozzle. If the nozzle needs to be replaced, the first launch opportunity would be Friday or Saturday. Officials called “remote” a possibility that the problem could be resolved in time to fly Wednesday.

Congress, Obama, and NASA fiddle while manned space burns

The space war continues to heat up again. In a hearing today in the Senate, several senators complained loudly that NASA isn’t implementing the details of the September authorization act.

What clowns. These same senators haven’t provided NASA (or anyone) with a budget. They have also given NASA an authorization bill that does not provide the agency with enough money while simultaneously demanding that things be done faster. And they’ve done this at a time the federal government is almost bankrupt. Moreover, the bill requires that NASA build things that the Obama administration doesn’t want to build (though in truth, the Obama administration itself is so confused that no one, including them, knows what they are going to do).

All in all, the whole thing is a mess.

As I’ve said earlier, it’s all pork. Even if NASA gets the money laid out in the authorization bill, it will accomplish nothing except spread some cash around to several congressional districts. Nothing will get built. And in the process of sending that money to new aerospace companies NASA will do much to squelch their creativity and innovation.

Better to cut it all, and let the aerospace industry sink or swim on its own. It will almost certainly do better that the government at this point. In fact, how could it do worse?

Former Shuttle Manager Decries NASA’s Commercial Crew Safety Regs

A deal with the devil: Former shuttle manager decries NASA’s commercial crew safety regulations. Key quote:

The U.S. government did not always rely on voluminous specifications to safeguard pilots or astronauts, Hale said, citing requirements for the first U.S. military aircraft which covered only 2.5 pages and those of NASA’s Gemini capsule which were about 12 pages long.

The coming train wreck for Commercial Human Spaceflight

This post by retired NASA engineer Wayne Hale explains why it probably is a good idea if Congress cuts the subsidies for new commercial space: The coming train wreck for commercial human spaceflight. This is the key quote, where Hale describes the regulations NASA is requiring these new companies to meet:

The document runs a mind-numbing 260 pages of densely spaced requirements. Most disappointing, on pages 7 to 11 is a table of 74 additional requirements documents which must be followed, in whole or in part. Taken all together, there are thousands of requirement statements referenced in this document. And for every one NASA will require a potential commercial space flight provider to document, prove, and verify with massive amounts of paperwork and/or electronic forms.

Google Lunar X Prize

The private race to the Moon, led by the Google Lunar X Prize. Key quote:

The Google Lunar X PRIZE offers a total of $30 million in prize money to the first privately funded teams to land robots on the Moon that explore the lunar surface by moving at least 500 meters and by sending back two packages of high definition video and photos we call Mooncasts. Unlike our first competition, the $10 million Ansari X PRIZE, the Google Lunar X PRIZE isn’t a ‘winner take all’ proposition: instead, we have a $20 million Grand Prize, a Second Place Prize that will award $5 million to the second team to meet all of the requirements, a series of technical bonus missions that can allow teams to earn as much as an additional $4 million, and a $1 million award that will go to teams that make the greatest contribution to stimulating diversity in space exploration and, more generally, in science, technology, engineering, and mathematics.

The competition operates on a “payment on delivery” model: the prize money is only given to teams after they complete a successful mission, meaning that each team needs to raise all the capital needed to design, develop and conduct their missions on their own. We’re now three years into a fairly long effort: the prize is available until all of the prize purses are claimed or until the end of the year 2015. Last week, we accepted our 24th team into the competition.

1 325 326 327 328