SpaceX successfully completes Falcon 9 static fire test

SpaceX on Sunday successfully completed the launch dress rehearsal countdown and static fire test for its next Falcon 9 launch, which will loft a Dragon capsule to ISS and is set now for February 18.

The article at the link as well as a lot of other news organizations are making a big deal about the fact that this launch is taking place at the LC-39A launchpad, used during the Apollo program as well as by the shuttle. While the historic background is interesting, of more significance to me is that this test brings SpaceX closer to having two operational pads in Florida, one of which (LC-39A) is configured for Falcon Heavy launches.

UK commits £10 million to space development

The competition heats up: The United Kingdom’s space agency yesterday announced that it is making available £10 million in grants for projects that develop and improve the country’s launch capabilities.

Organisations expected to bid for a share of the funding are likely to be joint enterprises of launch vehicle operators and potential launch sites. The funding must be used to develop spaceflight capabilities, such as building spaceport infrastructure or adapting launch vehicle technology for use in the UK. The aim is to establish a commercial spaceflight market to capture a share of the emerging global market from 2020.

The government also announced today that it is preparing legislation to develop a safe and competitive regulatory environment for spaceflight. This work goes hand-in-hand with government’s work internationally to achieve the technical, trade and policy agreements necessary for UK based launch services and developing interest from launch customers and operators from around the world.

It is interesting to me that the UK’s effort to prepare a better regulatory environment for private space is happening parallel to the similar recently-announced regulartory efforts in Luxembourg, the United States, and the United Arab Emirates, just to name a few. It seems that the nations that wish to compete in the new colonial movement in space are all discovering that the Outer Space Treaty is a problem, and they are all searching for ways to legally bypass it, without abandoning it.

Trump to the Moon!

Two stories in the past two days strongly suggest that the Trump administration is planning a two-pronged space policy approach, with the long-term goal of shifting most of space to private operations.

From the first link:

The more ambitious administration vision could include new moon landings that “see private American astronauts, on private space ships, circling the Moon by 2020; and private lunar landers staking out de facto ‘property rights’ for American on the Moon, by 2020 as well,” according to a summary of an “agency action plan” that the transition drew up for NASA late last month. Such missions would be selected through an “internal competition” between what the summary calls Old Space, or NASA’s traditional contractors, and New Space characterized by SpaceX and Blue Origin. But the summary also suggests a strong predilection toward New Space. “We have to be seen giving ‘Old Space’ a fair and balanced shot at proving they are better and cheaper than commercial,” it says.

Another thrust of the new space effort would be to privatize low-Earth orbit, where most satellites and the International Space Station operate — or a “seamless low-risk transition from government-owned and operated stations to privately-owned and operated stations.” “This may be the biggest and most public privatization effort America has ever conducted,” it says.

Essentially, they are going to do exactly what I suggested back in late December, give SLS/Orion a short-term realistic goal of going to the Moon. This is what it was originally designed for, and it is the only technology presently available that has even the slightest chance of meeting the three year deadline outlined above. More important, this will give Congress something in the negotiations, as SLS/Orion has been Congress’s baby — pushed and funded by Congress over the objections of the previous administration and without a clear mission to go anywhere — in order to keep the money stream flowing to the big “Old Space” companies like Boeing and Lockheed Martin. Obama tried to simply cancel its predecessor, Constellation, and that did not sit well with Congress. Trump however understands negotiation and how to play the game. In order to eventually eliminate SLS Trump is going to provide Congress some short term excitement and some viable long term alternatives.

The long term alternatives will be private enterprise. Even as they send SLS/Orion on its grand finale to the Moon, the Trump administration will accelerate the restructuring of NASA to make the agency less of a design and construction operation and more a mere customer of private space. All non-military Earth orbital operations will be shifted to the private sector over time, so that once SLS/Orion has achieved that goal of completing a lunar mission there will be a strong enough private space sector to replace it, allowing Congress to let it go the way of Apollo and the space shuttle.

Orbital ATK sues DARPA over its satellite repair program

Orbital ATK has filed a lawsuit against the Defense Department’s DARPA division over its satellite repair program that is apparently going to award a contract to a Canadian company to develop a system for using robots to repair orbiting satellites.

Orbital argues that the federal program, called the Robotic Servicing of Geosynchronous Satellites, would unfairly compete with its own privately funded effort, a system called the Mission Extension Vehicle 1, backed by at least $200 million from investors. The company has set up at a production facility in Northern Virginia, with a launch planned for next year.

DARPA wants to build out a government-funded program of its own, and is close to awarding a contract to a company that Orbital views as a competitor. In a contract announcement briefly posted on the agency’s website, DARPA said it is awarding a $15 million contract to Space Systems/Loral (SSL), a U.S. subsidiary of Canadian aerospace firm MacDonald, Dettwiler and Associates. DARPA spokesman Jared B. Adams said the contract award was posted in error and elements of the deal are still being worked on.

In its lawsuit, Orbital alleges that the contract violates federal policy against creating government space programs that compete with existing commercial ones. “The U.S. National Space Policy explicitly directs government agencies to avoid funding activities that are already in development in the commercial marketplace,” the company said in a statement. “Orbital ATK will continue to pursue all available options to oppose DARPA from moving forward with this illegal and wasteful use of U.S. taxpayer dollars.”

DARPA normally pushes projects that no one is doing, either because the work is too experimental or can’t yet make a profit. In this case however it appears that this is not the case. Worse (from a political perspective), they are awarding the contract to a non-American company. I would not be surprised if Congress soon steps in and shuts this particular DARPA project down.

Democrats in Pima County vote to appeal World View court decision

The Pima County Board of Supervisors in Arizona has voted 3-2 on a party-line vote to appeal a judge’s decision that canceled the county’s deal with the space tourism balloon company World View because it violated state law.

The Pima County Board of Supervisors voted 3-2 to appeal a Superior Court decision which concluded the county violated state law when it signed an agreement and lease with World View, a space exploration company located near the Tucson International Airport.

The vote was along party lines, with the three Democrats voting for the appeal and the two Republicans voting against it.

The court ruled the county did not comply with a law which requires the county to appraise the property, hold a public auction, and negotiate a fair rental price before it agreed to build a $15 million complex for the company.

It seems to me that — rather than fight this in court — the smart thing to do here is to work out a new agreement that does not violate the law, something that the county was able to do with its lease agreements with Vector Space Systems. This apparently was what the Republicans on the board were proposing. Instead, the Democrats have chosen to fight, even though that will delay things further and is likely to fail in court anyway.

NanoRacks and Boeing to build private airlock on ISS

The competition heats up: NASA has signed an agreement with NanoRacks and Boeing to build private commercial airlock to attach to ISS in 2019 and be used for commercial operations.

Commercial opportunities through Airlock begin with cubesat and small satellite deployment from station and include a full range of additional services to meet customer needs from NASA and the growing commercial sector. Currently, cubesats and small satellites are deployed through the government-operated Japanese Kibo Airlock. Additionally, the crew on board may now assemble payloads typically flown in soft-stowage ISS Cargo Transfer Bags into larger items that currently cannot be handled by the existing Kibo Airlock. “We are very pleased to have Boeing joining with us to develop the Airlock Module,” says NanoRacks CEO Jeffrey Manber. “This is a huge step for NASA and the U.S. space program, to leverage the commercial marketplace for low-Earth orbit, on Space Station and beyond, and NanoRacks is proud to be taking the lead in this prestigious venture.”

Beyond station, the Airlock could at some future time, be detached and placed onto another on-orbit platform.

This is part of the overall transition at NASA from government-built and -run to privately-built and -run.

ULA to trim workforce again

The competition heats up: In another effort to cut costs, ULA is planning to trim its workforce again in 2017.

In 2016 they cut 350 jobs. They haven’t specified a number this time, as they hope to initially eliminate jobs through voluntary buyouts and layoffs. Regardless, this is a good sign, as it indicates that the company remains serious about being competitive in the launch market.

Judge strikes down Tucson/Worldview spaceport deal

A deal between Pima County in Tucson Arizona and the space tourism balloon company World View has been struck down.

The Tucson judge sided with the libertarian Goldwater group, which argued Pima County ran afoul of state rules governing subsidies and incentives to businesses. “Judge Woods’ ruling protects Pima County taxpayers from having to foot the bill for World View’s untested business model,” said Jim Manley, senior attorney at the Goldwater Institute. “Instead of relying on a sweetheart deal from taxpayers, World View will need to pay market rates to lease its building, just like every other business in Pima County.”

Goldwater attorneys didn’t like that Pima County approved the deal without a popular ballot measure and that the deal was done without an appraisal. Goldwater also argued the lease deal was for less than market rates for a custom building. “The county is free to renegotiate the lease,” said Manley, “but only after they appraise the building, hold a public auction, and lease the building to the highest bidder. All of that will protect taxpayers from illegally subsidizing a private business.”

As much as I want this business to thrive, I think the Goldwater Institute was right. Pima County violated numerous laws and even some parts of the state constitution putting together this deal. Even if there was no corruption here, it opened the door to future backroom corruption if the deal was allowed. Now, I expect World View and the county will have to renegotiate.

Congressional report worries over Falcon 9 engine cracks

A forthcoming congressional report, reported by the Wall Street Journal, reveals that NASA is concerned about cracks that occur in the turbopumps of SpaceX’s Merlin engines.

The newspaper says the report has found a “pattern of problems” with the turbine blades within the turbopumps, which deliver rocket fuel into the combustion chamber of the Merlin rocket engine. Some of the components used in the turbopumps are prone to cracks, the government investigators say, and may require a redesign before NASA allows the Falcon 9 booster to be used for crewed flights. NASA has been briefed on the report’s findings, and the agency’s acting administrator, Robert Lightfoot, told the newspaper that he thinks “we know how to fix them.”

A spokesman for SpaceX, John Taylor, said the company already has a plan in place to fix the potential cracking issue. “We have qualified our engines to be robust to turbine wheel cracks,” Taylor said. “However, we are modifying the design to avoid them altogether. This will be part of the final design iteration on Falcon 9.” This final variant of the Falcon 9 booster, named Block 5, is being designed for optimal safety and easier return for potential reuse. According to company founder Elon Musk, it could fly by the end of this year.

Here’s the real scoop: SpaceX initially built the engines to fly once, just as every single rocket company has done in the entire history of space, excluding the space shuttle. Under these conditions, the cracks could be considered an acceptable issue, which is what they mean when they say “We have qualified our engines to be robust to turbine wheel cracks.” My guess is that they tested the engines, found that the cracks were not a significant problem for a single flight, especially because the Falcon 9 rocket uses nine Merlin engines on the first stage and thus has some redundancy should one fail. And based on SpaceX’s flight record — no launch failures due to failed engines — that conclusion seems reasonable.

SpaceX is now redesigning to eliminate the cracks, however, because such cracks are not acceptable for engines that will fly multiple times on reused first stages.

Thus, this story, as leaked, appears to me to be a hit job by powers in Congress who dislike the competition that SpaceX poses to big government rockets like SLS. SLS will use salvaged shuttle engines, designed initially for many reuses, and thus are superior in this manner to SpaceX’s Merlin engines. The shuttle engines however were also built by the government, which didn’t care very much about the cost of development, or making any profits. The comparison thus is somewhat bogus. Moreover, I suspect these cracks were only discovered after SpaceX successfully landed and recovered some first stages. To put them on trial in the press now for doing good engineering research and redevelopment seems somewhat inappropriate.

The report itself has not yet been released, though it does also note lingering issues with the parachutes being developed for Boeing’s Starliner capsule.

Overall, both companies are struggling to start their operational flights by 2019. For Congress or NASA to try to put more roadblocks up in that development seems most counterproductive.

More new robots from Boston Dynamics

The video at the link shows off SpotMini, of video of which I posted previously. However, the first robot shown is one they have named Handle and is something they admit could be “nightmare-inducing.” It walks upright on two legs, but instead of feetpods it has wheels, giving it the ability to move very fast. And for some reason, they put its arms on backwards so that the elbows bend inward instead of outward.

Watch the video. The robot design work here is truly breath-taking.

The ships of Hanjin six months after it went bankrupt

Real news: Six months ago the shipping company Hanjin went bankrupt, stranding its 96 container ships worldwide. This article takes a detailed look not only on what happened to those ships since, but also at the state of the entire shipping industry.

There was a time when Hanjin’s collapse in August and this follow-up story would have been major news stories, covered by all the leading mainstream press outlets. No more. Even though it indicates significant financial and economic trends that should concern anyone who is serious about being an educated citizen, the press doesn’t cover it, and the public today really doesn’t care.

Just another indicator that a new dark age is looming.

ESA commits $91 million to reusable rocket engine development

The competition heats up? Despite a general lack of interest in reusability, the ESA has now committed $91 million to develop a new low cost prototype reusable rocket engine.

In an interview with SpaceNews, Airbus Safran Launchers CEO Alain Charmeau said FLPP is allocating 85 million euros ($91 million) to Prometheus to fund research and development leading to a 2020 test firing. Now that Prometheus is an ESA program, Charmeau expects more countries will get involved. “ESA will pay the contract to Airbus Safran Launchers and then Airbus Safran Launchers will cooperate with European industry, of course France and Germany, but we will have also contributions from Italy, Belgium, Sweden and probably a couple of others to a smaller extent,” Charmeau said.

This project reminds me of many NASA development projects. The agency spends the money to do a test firing, but the prototype is never used and gets abandoned as soon as the test is completed.

Things might change, however, come the 2020s. By then I think American companies will be quite successful in their effort to create reusable rockets, and that will leave Europe in the lurch competitively. Their solution at this time for combating that future competition however is not getting more competitive. Instead, as noted in the article at the link, Airbus Safran, the company building Ariane 6, wants the ESA to compel its members to use their rocket, regardless of cost.

The private weather industry moves forward

Link here. Key quote:

Early next month, aerospace start-up Spire Global of Glasgow, UK, will send a mini-satellite into space aboard an Indian government rocket. This ‘cubesat’ will join 16 others that are beaming a new type of atmospheric data back to Earth — and some scientists worry that such efforts are siphoning funding away from efforts to push forward the science of weather forecasting. Spire will begin providing observations to the US government on 30 April.

The probes track delays in radio signals from Global Positioning System (GPS) satellites as they pass through the atmosphere — a technique known as radio occultation. Researchers can use the data to create precise temperature profiles of the atmosphere to feed into weather-forecasting models — and eventually, perhaps, climate models.

Spire and its competitor GeoOptics of Pasadena, California, are participating in a pilot project announced in September by the US National Oceanic and Atmospheric Administration (NOAA), which is under pressure from the US Congress to determine whether it can cut costs by using commercial weather data. But scientists worry that such efforts are hampering the development of radio occultation. For years, they have sought federal funding for a project to advance the technique, but Spire and its competitors say they can offer high-quality data for a fraction of the price. [emphasis mine]

The quotes I have highlighted illustrate the hidebound leftist scientific opposition to introducing private enterprise into weather research. The article, published in the journal Nature, never once articulates in any way how these private efforts will hurt scientific research. What it does show is that the private effort will cost a tenth of the government effort while getting launched much faster. The money, however, will go to these private companies, and not the scientific factions that up until now have lived on the government money train.

The complaints here are the same as those I saw in NASA back about a decade ago when NASA first considered hiring private companies to provide it cargo to ISS. This is a turf war. NOAA is now being pressured by Congress to do the same: stop building big expensive weather satellites and buy the service for much less from the private sector. The scientific community sees this as a threat to its funding and is trying to stop it.

With Republicans controlling all three branches of the federal government I think this opposition will be fruitless, and we shall see the shift to private enterprise in weather data-gathering to accelerate.

Government-owned Alaska Aerospace considers second spaceport

The competition heats up: State-owned Alaska Aerospace is considering opening a second spaceport outside the state and closer to the equator.

Alaska Aerospace operates the Pacific Spaceport Complex Alaska. The Kodiak Island complex is capable of polar, sun-synchronous and high-inclination orbits, but does not support the equatorial launches that make up most of the industry demand. With the new launch facility, Campbell said having equatorial launches will give the corporation a competitive advantage and also bring more customers to Kodiak.

The state no longer funds the corporation, which has never made money. Still, it now has contracts with Rocket Lab and Vector Space Systems and this new move is an obvious effort to make itself more viable.

Recovered Falcon 9 first stage prepped for launch

The competition heats up: SpaceX on Tuesday revealed that last week it has completed the standard static fire testing of the recovered Falcon 9 first stage that it plans to relaunch in March.

A March launch would mean an 11-month turnaround, which is far from optimal, but understandable for the first time. SpaceX’s founder and chief executive, Elon Musk, has acknowledged the company must do better in the future if resuable flight is to become economically viable. He says the next—and likely final—iteration of the Falcon 9 rocket will be optimized for reuse. “Block 5 is the final upgrade of the Falcon architecture,” he tweeted earlier this year. “Significantly improves performance & ease of reusability. Flies end of year.”

It now seems likely that SpaceX will fly the landed boosters it currently has, at most once or twice, before retiring them, instead of multiple times. Although the company hasn’t elaborated on the problems with the engines, booster structure, or composite materials that have shown wear and tear after their orbital launches and returns, Musk is confident that changes to the Block 5 version of the rocket will solve the problem. “I think the F9 boosters could be used almost indefinitely, so long as there is scheduled maintenance and careful inspections,” he has said.

In other words, SpaceX has had — for the first time in history — the opportunity to inspect a number of used first stage rockets, and that precious knowledge is making it possible for them to upgrade the stage design to make future stages more hardy. In fact, those future stages won’t be stages, but reusable vessels that SpaceX could even name if it wished.

India to launch spare GPS satellite because of single satellite failure

Because of the failure of the atomic clocks on one of its GPS satellites have failed, India now plans to launch one of their spare satellites to increase the system’s redundancy.

The article does not say whether they will make any changes to the clocks on the spare satellite, which are the same as the failed clocks on the Indian satellite and were all built by the same European company that built the clocks on Europe’s Galileo GPS satellites that are also failing.

Next Falcon 9 launch delayed as SpaceX rearranges manifest

Because the launchpad at Kennedy is not quite ready for the planned February 3 launch of a commercial satellite, SpaceX has rearranged its launch manifest to switch that launch with the next Dragon mission to ISS, essentially delaying their next launch by two weeks.

With [launchpad] 39A still not ready to debut in its new role with SpaceX, the first mission set to launch from this pad – the Falcon 9 launch with EchoStar 23 – was pushed to the right a number of times. Although 39A is very close to being ready to conduct launches, EchoStar 23’s launch date was deemed to be too close to the mid-February target for the CRS-10 Dragon mission.

SpaceX and NASA discussed the situation on Friday night, before deciding it would be prudent to place EchoStar 23’s launch after CRS-10, allowing engineers to finalize modification and checkout work on the famous pad and simultaneously avoid a potential delay to the important Dragon mission to the Station.

The real problem here is that SpaceX had planned to have two working launchpads by this time, but doesn’t because their first pad was damaged in the September 1 Falcon 9 launchpad explosion. The consequences is that, for at least the next month, they will not be able to set a pace of a launch every two weeks.

Soyuz launches successfully from French Guiana

A Russian Soyuz rocket, built for Arianespace and launched from French Guiana, successfully placed a commercial satellite in geosynchronous orbit on Friday.

The launch has some significance. First, it was the first time a Soyuz rocket placed a payload into geosynchronous orbit. Second, the payload was the first satellite built by a German company in more than 25 years

Finally, and most important, it demonstrated that at least one configuration of the Soyuz rocket is still operational as Russia investigates the corrupt practices at the company that has been building upper stage engines for both its Soyuz and Proton rockets.

Update: Russia has revealed that this on-going investigation will now delay the next Proton rocket launch for 3.5 months. This means that launch will occur sometime in May, and will occur just weeks short of a full year after the last Proton launch on June 9, 2016.

Making a Linux laptop

Yesterday while I was sitting at my desk working on my Linux desktop computer, I got a phone call from someone from “Windows Technical Support.” The man on the line said to me, quite nicely, that they had noticed a problem with my computer and wanted to help me fix it.

I said, “You are talking about my Windows desktop computer, the one I am working right now, correct?”

The man said sweetly, “Yes, sir. That’s the computer we have seen a problem with.”

I answered sweetly, “I just want to be sure, so let me ask again. You are referring to the Windows computer in front of me, the one on my desk?”

He responded, “Yes sir. Could you press your start menu please and go to settings?”

Unfortunately, I had too much work to do, and couldn’t spend more time with him. I would have liked to have led him along for as long as possible, but simple didn’t have the time. Instead, I said, “Um, I can’t really go to my Windows settings because my desktop is a Linux computer, and has been for a decade. Have you heard of Linux?”

Instantly the phone went dead.

I tell this tale because it is only one more reason I abandoned Windows back in 2006. With Linux I have no viruses to worry about, and scammers like this can’t do me any harm.

Anyway, this post really isn’t about Windows scammers. Instead, I want to relate my experience this past week in setting up my first Linux laptop, following the step-by-step instructions provided by James Stephens and posted here on Behind the Black last year in the following series:
» Read more

Boeing unveils its spacesuit for Starliner missions

The competition heats up: Boeing today unveiled the streamlined but snazzy spacesuit it plans to use on its Starliner manned ferry flights to and from ISS.

This tidbit though I think illustrates the new mindset, to make things simpler and cheaper and more focused on their actual purpose.

Boeing’s suit, designed with the Massachusetts-based David Clark Co., weighs about 12 pounds, compared to 30 pounds for NASA’s orange suits formally called the Advanced Crew Escape Suit, or ACES. …The “get us home suit,” as Ferguson called it, couldn’t be used for a spacewalk. It’s intended to provide air and cooling to keep astronauts safe during launch and landings back on land, and during emergencies, like if a micrometeoroid strike caused a loss of cabin pressure.

Google Lunar X-Prize finalists named

The competition heats up: The five finalists for the Google Lunar X-Prize have now been set.

Five teams remain in the running: Israel’s SpaceIL, Florida-based Moon Express, an international team known as Synergy Moon, India’s Team Indus and Japan’s Hakuto.

SpaceIL plans to fly on a SpaceX Falcon 9 rocket, which recently returned to flight following a launch pad accident. Team Indus and Hakuto will share a ride on an Indian PSLV launcher. Moon Express is banking on a launch from startup Rocket Lab, which is developing a small rocket called Electron. Whether it wins the XPrize or not, Moon Express is building a business to provide lunar transportation and services, such as research and mineral extraction, Chief Executive Bob Richards said in an interview. Synergy Moon is counting on one of its partners, Mojave, Calif.-based Interorbital Systems, for its launch aboard a new rocket known as Neptune.

To win, one of these teams must fly its mission before the end of 2017.

Trump’s 1st NASA appointees suggest future policy

A memo released January 20 from NASA’s acting administrator accepting the job also announced the first Trump appointees to NASA. The history and policy positions of those two appointees I think once again give us a very clear indication of where NASA might be going in the coming years.

[Acting administrator Robert] Lightfoot, in the memo, said that the administration has appointed Erik Noble to serve as White House senior advisor and Greg Autry to be White House liaison. The two are the first members of the so-called “beachhead team” of administration staffers assigned to NASA, at least on a short-term basis.

Autry is an assistant professor of entrepreneurship at the University of Southern California who has been a proponent of commercial space activities. Autry was one of eight members of the agency review team, or “landing team,” assigned to NASA by the transition office of then President-elect Trump.

Noble did not serve on the landing team, but worked on the Trump campaign as a political data analyst. Noble, who earned a Ph.D. in environmental studies from the University of Colorado, spent seven years at the NASA Goddard Institute of Space Studies in New York, working on weather and climate models. [emphasis mine]

Autry, believes strongly in private space, and has also been a critic of SLS/Orion. Being placed at NASA as Trump’s first appointee strongly suggests that a Trump administration is going to accelerate the commercial space push that was begun by the Bush administration and then strongly supported by the Obama administration. It also suggests that the SLS and Orion projects are going to face a difficult future and will likely be phased out.

Noble’s appointment is more important. As a former scientist at the Goddard Institute, he is now well positioned to possibly appoint a new head to that organization, or even become its head himself. The present person in charge there, Gavin Schmidt, has increasingly become suspect as a scientist, instead appearing more as global warming political advocate. Since he took over that Institute, the climate data there has been increasingly tampered with, with past data being cooled and recent data being warmed, thus creating the impression that the Earth’s climate has been warming more than indicated by all previous research. Schmidt’s explanations for these “adjustments” (the term he uses) have never been satisfactory. He then uses the results from these “adjustments” to make annual press releases declaring each year as the “hottest” ever, though the raw data shows no such thing.

Even if Noble does not replace Schmidt, Noble appears well positioned to force Schmidt to either finally justify his data adjustments, or remove them from the data stream so that the raw data will be allowed to dominate policy decisions once again.

Bigelow proposes extending life of its ISS module beyond its two year demo

Bigelow Aerospace is in negotiations with NASA to allow use on ISS of its demonstration inflatable BEAM module beyond its planned two year test mission.

BEAM is designed for a two-year mission on the ISS. The module is closed off from the rest of the station most of the time, with astronauts periodically entering BEAM to check the status of the module and instruments mounted inside.

NASA has previously indicated that it would dispose of BEAM at the end of its two-year mission, using the station’s robotic arm to detach the module and allow it to burn up in the atmosphere. There are no immediate plans, though, for use of the docking port where BEAM is installed after that two-year mission ends, opening the possibility for an extended mission.

Robert Bigelow has previously suggested there was commercial interest in the module. As a NASA press conference in April 2016 prior to the launch of BEAM, he said there were four different groups, both countries and companies, interested in flying experiments in BEAM. “We’re hoping that, maybe in half a year or something, we can get permission from NASA to accommodate these people in some way,” he said then.

It is typical NASA behavior to throw this module out after two years, rather than find a way to use it.

Posted from a hotel room in St. Louis, Missouri.

India delays next launch of its largest rocket

India has delayed the next launch of its GSLV rocket from January to no earlier than March in order to conduct tests on the rocket.

This does not change the schedule for the next launch of their smaller PSLV rocket, which is still set for February and will launch a record of over a hundred satellites, most of which are smallsats.

Posted from Tucson Internationa Airport. I am heading to St. Louis today to give a lecture to the local chapter there of the AIAA.

1 160 161 162 163 164 248