Virgin Orbit signs deal to launch from Brazil

Capitalism in space: Virgin Orbit yesterday announced that it has signed an agreement with the Brazil Space Agency (AEB) to establish facilities and conduct launches from that nation’s long unused Alcântara spaceport.

The license is granted to Virgin Orbit Brasil Ltda. (VOBRA), a newly formed and wholly owned Brazilian subsidiary dedicated to bringing the LauncherOne air-launch rocket system to the Alcântara Launch Center (Centro de Lançamento de Alcântara, CLA).

The formation of the VOBRA entity for dedicated Brazilian space activities is designed to bring an important new capability to the country and economic value to the region. Virgin Orbit’s LauncherOne system, which uses a customized 747 aircraft, Cosmic Girl, as its flying and fully reusable launch pad, will conduct launches from the existing airbase at the Brazilian site, flying hundreds of miles before releasing the rocket directly above the equator — a global sweet spot — or at other optimal locations identified for each individual mission.

Being able to launch smallsats from the equator gives Virgin Orbit the ability to place those satellites in any orbit around the Earth for far less fuel, an advantage not available to spaceports at higher latitudes.

Virgin Orbit completes fastest taxi test of LaunchOne

Capitalism in space: Virgin Orbit this past weekend completed the fastest taxi test of its LaunchOne smallsat rocket airplane, with LaunchOne attached.

In a tweet posted today, Virgin Orbit said the Nov. 11 ground test revved up the plane, nicknamed Cosmic Girl, to a speed beyond 110 knots (125 mph) on a runway in Victorville, Calif. That’s fast enough to simulate an aborted takeoff. “We also used the day as an opportunity to load real flight software onto LauncherOne for the first time,” the company said.

My 2016 prediction, that Virgin Orbit’s LauncherOne will reach space before Virgin Galactic’s SpaceShipTwo, looks increasingly likely. They had said they wanted to do their first launch by the end of the 2018 summer. Though this did not happen, their launch license [pdf] is effective through December 2019, and it appears they are moving towards that first launch within a few months.