Relativity ends Terran-1, will move to developing more powerful Terran-R

According to Tim Ellis, the head of the rocket company Relativity, it has decided to end any further work on its small test rocket, Terran-1 following its first failed launch and shift all work to developing its more powerful Terran-R rocket.

The company feels good about the data collected from the flight, as Terran 1 made it further into space than the debut launches from a majority of small rocket companies. It also validated the company’s test and launch program, he said, and its approach to 3D printing large parts of a rocket. “Terran 1 was always meant to develop technologies that were pushing the bounds for what was needed for Terran R,” Ellis said.

But now, it’s time to move on. Relativity Space is negotiating with NASA to move the one existing commercial launch on Terran 1—the Venture Class Launch Services Demonstration 2 mission—onto another rocket, possibly the Terran R. In other words, there will be no more Terran 1 launches.

Ellis also described some major changes in the design of Terran-R. The company will no longer attempt to make the second stage reusable, it will no longer 3D-print its entire structure, its first stage will be more powerful and will be flown and reusable like SpaceX’s Falcon 9, and its first launch will be pushed back from 2024 to 2026.

This decision means that Relativity will not become an operational and competitive rocket company for another three years, at the soonest. However, should it succeed in achieving these new plans for Terran-R, it will have a rocket that can directly compete with SpaceX, while beating out anything either ULA or Blue Origin can at this time offer. For example, the rocket will be able to put from 23 to 33 tons into low Earth orbit, which is more than the Falcon 9 (20 tons) and not much less than the Falcon Heavy (50 tons), and generally better than Vulcan (27 tons). As noted at the link:

[T]he US government (as well as commercial satellite customers) would very much like a second company to step forward and challenge SpaceX on innovation, price, and reliability. Ellis correctly sees that this lane remains open with questions about Vulcan’s long-term future, Blue Origin’s slow movement on New Glenn, and Rocket Lab’s focus on a smaller medium-lift rocket, Neutron.

Whether this new strategy will work depends entirely on whether Relativity can deliver by 2026. If it does so, it will very likely beat Blue Origin into orbit, and be chosen by the military to replace it as one of the Pentagon’s launch providers. It will also make ULA’s position more vulnerable, because Vulcan will no longer be the only other option, and it will likely not be able to compete with the prices offered by SpaceX and Relativity.

Second stage on Relativity’s first launch fails to fire

The first test launch of Relativity’s 3D rocket, Terran-1, achieved the mission’s minimum goals, with the first stage performing exactly as planned and the 3D-printed rocket successfully completing engine cut-off and stage separation.

At that point the second stage engine failed to fire, and the upper stage fell into the ocean.

I have embedded the live stream from last night below. The company had made it clear that their number one goal for this flight was getting that 3D-printed rocket through max-q, the time when the atmospheric pressures on the rocket are their greatest. In this area the launch was a success.

This was also the first American launch of a methane-fueled rocket, and it was fascinating seeing the difference in the rocket’s plumes from other fuel types. Terran-1’s engine plumes were a clear distinct blue, quite different from the white and smokey plumes produced by solid-fueled and kerosene-fueled rocket engines, and the almost invisible plume of space shuttle’s hydrogen-fueled engines.

As yet, no methane-fueled rocket has reached orbit, though two Chinese companies and Relativity have tried. SpaceX will try itself when it launches Superheavy/Starship.
» Read more

Relativity scrubs launch today again

Relativity today was once again unable to complete the first launch of its Terran-1 prototype rocket.

The failure to launch was not for want of trying. The first countdown was first put on hold at T-1:10 when a boat entered the range. Once removed, the launch team picked up the count from that point without any recycle, but at T-0 the rocket’s internal computer sensed an issue and aborted the launch.

The launch team then reassessed, adjusted that issue, and tried again for a launch at the last second of the launch window, essentially duplicating the circumstances of an instantaneous launch window. The count this time got down to T-45 seconds when once again the rocket’s internal computer sensed an issue and aborted the launch.

No word yet on when the company will try again. If anything, Relativity’s launch team is getting a lot of practice and training with each launch attempt, critical knowledge needed for future launches.

Live stream of the first launch attempt of Relativity’s Terran-1 rocket

I have embedded below the live stream of the first launch attempt of Relativity’s Terran-1 rocket, presently scheduled with a three hour launch window that opens at 1:00 pm (Eastern). The live stream will go live at noon.

The first launch of a new rocket is exceedingly challenging, and almost never succeeds. The key however is the data obtained that can be used to make the next launch attempt a success.

A lot rides on this launch. Relativity already has obtained $1.2 billion in launch contracts plus more than $1 billion in private investment capital, despite having never launched anything. Moreover, the Terran-1 rocket is really a prototype for its larger Terran-R rocket, which is intended to compete directly for the larger payloads that companies like SpaceX and ULA launch.

» Read more

Relativity scrubs launch attempt today

After several countdown recycles Relativity’s launch team finally decided to scrub today’s first launch of its 3D-printed Terran-1 rocket.

At one point the countdown got to T-1:10, but was aborted at that point because the temperatures in the oxygen tank were not within acceptable values.

The launch window was three hours long, and it appeared they simply ran out of time. As of posting more details have not yet been released. The link above goes to the live stream.

Watching the first launch attempt of Relativity’s Terran-1 rocket

I have embedded below the live stream of the first launch attempt by the rocket startup Relativity today of its 3D-printed Terran-1 smallsat rocket, with a launch window of three hours beginning at 1 pm (Eastern). The live stream begins about an hour before launch.

The first launch of a new rocket is exceedingly challenging, and almost never succeeds. The key however is the data obtained that can be used to make the next launch attempt a success.

A lot rides on this launch. Relativity already has obtained $1.2 billion in launch contracts plus more than $1 billion in private investment capital, despite having never launched anything. Moreover, the Terran-1 rocket is really a prototype for its larger Terran-R rocket, which is intended to compete directly for the larger payloads that companies like SpaceX and ULA launch.
» Read more

Relativity’s Terran-1 rocket on launchpad for final tests prior to first launch

Relativity has once again stacked its Terran-1 rocket on its launchpad at Cape Canaveral for its final ground tests prior to first launch, hopefully later this month.

The launch date has not been announced, nor has a specific schedule for those tests, which will likely include several dress rehearsal countdowns where the rocket will be fueled as if for launch.

Terran-1 is a smallsat rocket, most of which has been 3D printed. If successful, Relativity plans to follow it in 2024 with the 3D printed Terran-R, which would be comparable in size and power to SpaceX’s Falcon 9. The company also claims that rocket will be entirely reusable.

Update on upcoming first launch of Relativity’s Terran-1 rocket

Link here. Relativity has been doing longer and longer static fire tests on the launchpad, building to what could be the first every full duration static fire test of a rocket, on the launchpad.

A pair of spin-start tests on Terran 1’s first stage was completed on July 18 and 21 of this year. This was followed by hot fire tests, which not only started the nine Aeon 1 engines but allowed them to reach full thrust before shutdown. The first of these hot fire tests occurred on July 27 and lasted six seconds.

Once complete engine ignition was achieved, the next goal was to work toward firing the first stage for the full duration that will be needed during the flight from liftoff to stage separation. This type of “mission duty cycle” test is usually done on dedicated test stands rather than on the launch pad, but the test stand being used in place of the launch mount at SLC-16 enabled Relativity to streamline operations and complete long-duration firings on the launch pad. “To our knowledge, no other company has ever actually done a full flight duration test on the actual launch mount, or launch pad, at Cape Canaveral,” said Relativity CEO Tim Ellis, in an August interview with NASASpaceflight.

.

Once this test is completed, the rocket will be rolled back to its assembly building for check-outs, and if all is well will then be returned to the launchpad for its actual launch. No date has been set for that launch, but if it occurs before SpaceX’s Starship orbital launch, it will be the first methane-fueled rocket to reach orbit.

Relativity edges closer to first launch

Relativity has begun stacking its Terran-1 rocket with a goal of soon rolling it out to the launchpad for static fire tests.

The launch date itself remains uncertain. Though the company hopes to lift-off before the end of the year, it also has not committed to that goal.

“We are confident in our tech readiness to launch this year, and we’re still marching toward that,” Ellis said. “But there are a few external factors as we’re getting close to the end of the year that could impact the timeline for us. It’s not a guarantee, but it could.”

Those external factors include other spaceport users in Florida, including uncertainty around the mid-November launch of NASA’s Space Launch System rocket, and blackout periods as part of the military’s Holiday Airspace Release Plan. This effectively precludes launches around Thanksgiving, Christmas, and New Year’s Day due to the high volume of airline flights.

Ellis said the company is progressing well toward securing a launch license for “Good Luck Have Fun,” and noted that the Federal Aviation Administration accepted its methodology for debris mitigation as well as its trajectory analysis software.

The article at the link adds some additional details about the company’s plans. This Terran-1 rocket appears to be its equivalent of SpaceX’s Falcon-1. The company plans to quickly replace it with its much larger Terran-R rocket, comparable to the Falcon-9 in power and price. And it already has won $1.2 billion in launch contracts, and hopes to launch within two years.

I wonder if Terran-R will launch before Blue Origin’s much touted but repeatedly delayed New Glenn rocket. The article itself appears to think so, since it focuses entirely on the competition between SpaceX and Relativity, as if Blue Origin and New Glenn do not even exist.

August 23, 2022 Quick space links

Courtesy of BtB’s stringer Jay:

OneWeb signs up startup rocket company Relativity for future satellite launches

Capitalism in space: The rocket startup Relativity, which hopes to complete its first test launch of its small Terran-1 rocket before the end of the year, yesterday announced that it has won a launch contract with OneWeb to use its larger but not-yet-ready-for-launch Terran-R rocket to place future OneWeb satellites into orbit.

Under the agreement, Relativity will launch OneWeb’s low Earth orbit (LEO) satellites on Terran-R, the first fully reusable and entirely 3D printed rocket, starting in 2025. These launches will support OneWeb’s deployment of its Gen 2 satellite network, which will add capacity and fresh capabilities to build upon the initial constellation of 648 satellites the company is currently building out.

Since its launch contract with Arianespace using Russian Soyuz rockets fell apart due to Russia’s invasion of the Ukraine, OneWeb has been signing up a range of rocket companies, first SpaceX, then India, now Relativity. Apparently the satellite company realized it was a bad idea to depend on only one rocket, and is now lining up several to make sure its satellites can launch on schedule, no matter what.

For Relativity, this agreement solidifies its future, even before it has completed its first launch. It now has five customers for its Terran-R rocket, with contracts worth $1.2 billion. All it has to do now to become a major player in the global launch market is to get its rockets off the ground.

Update on Relativity’s operations and first launch attempt

Link here. The article provides a nice overview of the company, its rocket, and the status of both. Key quote:

Terran 1, much like SpaceX’s Falcon family, is designed around affordability. The company says a dedicated mission on Terran 1 should cost around $12 million and is capable of taking 2,750 pounds of payload to low-Earth orbit. That number drops to about 2,000 pounds when going to sun-synchronous orbit.

Though the 110-foot Terran 1 won’t be reusable and will be expended into the Atlantic Ocean, it should inform the company’s future development of the much larger, 216-foot Terran R rocket. That vehicle will be reusable and is expected to directly compete with SpaceX’s Falcon 9 rocket.

Terran 1’s demonstration mission, appropriately labeled “Good Luck, Have Fun,” is slated to carry no customer payload. The company appears to be on track for its goal of flying before the year is out.

Terran-1 will thus be limited to the smallsat market that is presently held by Rocket Lab, Virgin Orbit, and Astra. It is bigger, however, and if successful will be able to put more or larger smallsats into orbit, and do so at a cheaper price.

Relativity still targeting a ’22 first launch

Capitalism in space: The startup rocket company Relativity is still targeting this year for the first test launch of its 3D-printed Terran-1 rocket, according to its CEO Tim Ellis.

The company has raised more than $1 billion in private investment capital.

If successful, Relativity will join Rocket Lab, Virgin Orbit, and Astra as a small satellite launch provider, all capable of launching military and commercial smallsats quickly. The competition will guarantee that their prices will be low as well.

Relativity signs deal to expand rocket facility

Capitalism in space: The rocket company Relativity Space announced yesterday that it has signed an agreement for a major expansion of its rocket manufacturing facility in California.

The firm — fresh off a $650 million Series A fundraising round announced earlier this month — said Wednesday (June 30) it has signed for a 1-million-square-foot (93,000 square meters) headquarters factory at the Goodman Commerce Center, in its current hometown of Long Beach, California.

The 93-acre plant used to host Boeing’s C-17 military transport aircraft manufacturing, with the last C-17 produced there in 2015. Now, Relativity’s factory will make it the anchor tenant for a planned 437-acre business district west of the Long Beach Airport, the company said. It also plans to hold on to its existing factory space to continue producing its Terran 1 rocket.

Relativity will occupy the new space in January 2022, which will eventually host dozens of the company’s proprietary Stargate printers that can produce Terran 1 and its newly announced reusable version of the rocket, called Terran R. Relativity said the facility will include a fusion of 3D printing, artificial intelligence and autonomous robotics to create a new rocket in less than 60 days.

Relativity has not yet launched any rockets nor has it conducted any test flights. Its first test flight of Terran-1 is presently scheduled for later this year, though no date is set. The company is one of five American new rocket startups that say they will do their first launch before the end of 2021.

Relativity raises $650 million in investment capital to build bigger rocket

Capitalism in space: The rocket startup Relativity today announced that it has raised $650 million in investment capital for building a much larger version of its Terran rocket, one designed not only to be completely reusable, but to be able to launch more payload than SpaceX’s Falcon 9.

The company says the funding, which comes barely half a year after it raised a $500 million Series D round, will allow the company to accelerate development of the Terran R, a much larger rocket than the Terran 1 it is currently building and one that is intended to be fully reusable. Relativity is targeting a first launch of Terran R in 2024.

In an interview, Tim Ellis, chief executive of Relativity, said the plans for Terran R date back to the company’s founding in the Y Combinator business accelerator. “It’s actually been in the plans since five years ago, when I founded the company. We just haven’t talked about it yet,” he said. “But even in Y Combinator, we were talking about building a fully reusable rocket that was larger than Falcon 9.”

…Another key element of Terran R is Relativity’s intent to make the vehicle fully reusable, including its upper stage and payload fairing. “There won’t be a part that’s not reusable on the vehicle,” Ellis said, crediting that to the company’s significant investment in 3D-printing technologies.

It is not clear exactly how they will get this new rocket’s upper stage to return to Earth unscathed. SpaceX considered trying it with the Falcon 9 upper stage and decided it was not worth the cost. If Relativity succeeds however they will have a rocket that can beat SpaceX in price.

And about time. Right now none of the commercial rocket companies aiming to compete directly with SpaceX — ULA, Arianespace, Blue Origin — seem willing to really compete. They are either not working to build reusable rockets or have been doing so at a pace that is much too slow. Instead, they all seem to think that they can rely on big government contracts to stay afloat.

Not only is having no competition unhealthy in the long run for SpaceX, it is very bad for the customers who are looking for transportation into orbit. For a new company like Relativity to come forward with new ideas, new technology, and (most important) lots of cash to directly challenge SpaceX is a welcome development. Now they need to deliver.

Relativity touts next generation rocket before its first generation rocket has even launched

Capitalism in space: In an interview with CNBC the CEO of Relativity Space, Tim Ellis, pushed his company’s plans to develop a completely reusable rocket, dubbed the Terran-R, even though they have as yet completed even one test launch of their first rocket, the Terran-1.

Called Terran R, the reusable rocket is “really an obvious evolution” from the company’s Terran 1 rocket, Relativity CEO Tim Ellis told CNBC – the latter of which Relativity expects to launch for the first time later in 2021. “It’s the same architecture, the same propellant, the same factory, the same 3D printers, the same avionics and the same team,” Ellis said. “I’ve always been a huge fan of reusability. No matter how you look at it – even with 3D printing, and dropping the cost, and [increasing the] automation of a launch vehicle – making it reusable has got to be part of that future,” Ellis added.

Terran R is the first of several new initiatives that Ellis expects Relativity to unveil in the year ahead, with the company having raised more than $680 million since its founding five years ago. Just like Terran 1, Relativity will build Terran R with more than 90% of the parts through additive manufacturing – utilizing the world’s largest 3D printers as what Ellis calls “the factory of the future.”

Relativity, valued at $2.3 billion, ranks as one of the most valuable private space companies in the world. Its investors include Tiger Global Management, Fidelity, Baillie Gifford, Mark Cuban and more.

All well and good, but maybe before Ellis brags about his next generation rocket he might be better served to focus on getting that first rocket successfully off the ground later this year. It is a good thing his company is thinking of making its rockets reusable, but right now he is overselling while under-performing, a very bad sales technique. Better to do what Scotty of Star Trek did routinely, undersell while over-performing.
» Read more

Relativity raising $500 million in new search for investment capital

Capitalism in space: The new rocket company Relativity Space is in the process of raising another $500 million in new investment capital.

The new fundraise, expected to close in the coming days, would jump Relativity’s valuation to $2.3 billion, those people said. In addition to Tiger Global, Fidelity is also joining the round as a new Relativity investor. Existing investors in Relativity are also expected to be contributing — those include Social Capital, Playground Global, Y Combinator, Bond Capital, Tribe Capital, Jared Leto and Mark Cuban.

Tiger Global, the investment firm founded by Chase Coleman, has more than $43 billion in assets under management.

This new funding will supplement the almost $200 million Relativity raised previously.

The company has successfully completed engine tests, and plans its first orbital test launch of its Terran-1 rocket next year.

Relativity completes testing of rocket engine

Capitalism in space: The smallsate rocket company Relativity has successfully completed, ahead of schedule, the testing of its Aeon-1 rocket engine, and is now moving to completing design and construction of its Terran-1 rocket, tentatively scheduled for its first test flight in 2021.

The successful tests augur well for the ongoing development of the Terran 1 rocket, which represents a challenge as this rocket will now be larger than originally anticipated. In 2019, due to customer requests, Relativity resized its rocket to nearly double the available volume for payloads. It expanded the diameter of the fairing at the top of the rocket to 3 meters and height to 7 meters. While this is smaller than the fairing used in big rockets like the Falcon 9, in the class of “small satellite” launch vehicles it is quite large.

Relativity’s move to a larger fairing necessitated a more powerful engine with a gas generator cycle. The original Aeon engine had a thrust of 17,000 pounds at sea level, and the new version boosts the power considerably to 23,000 pounds. And now the company has been able to validate this larger, more powerful engine design.

The Terran 1 rocket, with a lift capacity of 1.25 tons to low Earth orbit, is powered by a first stage with nine Aeon engines. Success with the engine testing gives the company confidence that it can hit its target of launching the first Terran 1 rocket in 2021, said Zach Dunn, vice president of factory development. The next step is integrated stage testing, which will happen next year, followed by a launch from Space Launch Complex-16 at Cape Canaveral Air Force Station in Florida.

Right now it appears to me that in the race by American companies to join Rocket Lab in providing launch services for smaller satellites, Virgin Orbit and Astra are in the lead, having completed their first test flights, with Firefly and Relativity close behind.

Relativity Space gets Iridium launch contract

Capitalism in space: The new rocket company Relativity Space has won a launch contract to put six Iridium satellites into orbit.

The operational Iridium NEXT constellation, the second generation of Iridium communications satellites, was completed in January 2019. Eight batches of satellites were launched on eight SpaceX Falcon 9 missions from SLC-4E at Vandenberg Air Force Base. This placed a total of 75 satellites into polar low Earth orbits, 66 of which formed the operational constellation. The other nine serve as in-orbit spares in the event of an issue with any of the primary satellites.

There are six additional spare satellites that have been built for Iridium by Thales Alenia Space and are currently in storage on Earth. These are the satellites that will be launched onboard Relativity Space’s Terran 1 rocket, should the need arise. Up to six launches, occurring no earlier than 2023, would occur on an as-needed basis as determined by Iridium.

This deal is interesting in that Relativity Space has not yet launched its rocket, which it touts as the first rocket built entirely by 3D printing. For Iridium to pick them for a launch so far in the future and of satellites that are merely back-ups to their main constellation suggests that the satellite company got a very good deal on price. Iridium probably did this also to help a new rocket company and thus increase competition in the launch industry. It also probably has the right to back out should the rocket company have difficulties getting its new rocket off the ground.

Relativity raises $140 million in third funding round

Capitalism in space: The new smallsat rocket company Relativity announced yesterday that it has raised $140 million in its third funding round, providing it enough funding to complete and launch its Terran 1 rocket.

The new round brings the total raised by the Los Angeles-based company to $185 million. The new funding, Relativity executives said, will be sufficient to complete development of its Terran 1 rocket and begin commercial operations in 2021. It will support expansion of its headquarters and establishment of a factory for rocket production at the Stennis Space Center in Mississippi, where it currently tests its engines.

“That round will carry us past first flight of Terran 1,” said Jordan Noone, co-founder and chief technology officer of Relativity, in an interview. “This round is all the capital required to get to first flight, build out more of the Mississippi test site, Launch Complex 16 in Florida and expand our L.A. headquarters and manufacturing.”

That first launch, once scheduled for late 2020, is now planned for February 2021. “That original prediction for when first flight would be was made about four years ago, so moving it two months to the right here is not bad,” he said. Part of the reason for the slip is a decision to develop a larger payload fairing with twice the volume of the original one, based on feedback from prospective customers.

This all sounds very encouraging. The test will be their engineering concept to manufacture their rocket entirely by 3D printing, something no one has ever done before. If they experience any problems with this those launch dates will immediately be threatened.

Relativity gets another launch contract

Capitalsm in space: The smallsat rocket company Relativity has signed another launch contract, this time with Momentus, a company making orbital smallsat tugs capable of transporting smallsats to higher orbits.

The launch agreement, announced during Euroconsult’s World Satellite Business Week here, covers one launch of Relativity’s Terran 1 rocket in 2021 with an option for up to five additional launches. The companies did not disclose the terms of the agreement, but Relativity offers the Terran 1 for a list price of $10 million.

The 2021 launch will fly Momentus’ Vigoride Extended tug, capable of carrying up to 350 kilograms of satellites. The tug will transport the satellites from an initial low Earth orbit to geostationary orbit using its water plasma thruster technology.

This is Relativity’s fourth launch contract, all signed prior to their first test launch. Right now they hope to start test flights late in 2020, with their first operational flights in 2021.

Momentus meanwhile adds a capability to all these smallsat rockets, essentially providing them an upper stage that will get the smallsats they launch from low Earth orbit to geosynchronous orbit.

Relativity leases manufacturing space from NASA

Capitalism in space: The smallsat company Relativity has leased a large manufacturing space at NASA’s Stennis Space Center in Mississippi where it plans to build its Terran 1 rocket, set for first launch in 2020.

The Stennis center will eventually employ 200 engineers, nearly double the company’s current workforce of 90. The state of Mississippi offered a “significant” incentive package, the company said in a statement. “We’re reducing the human labor component significantly,” said Ellis, a veteran from Jeff Bezos’ space firm Blue Origin, referring to Relativity’s two-story-tall 3D printer arms named Stargate.

Stargate will enable the production of an entire rocket in under 60 days, said Ellis, who is looking to launch nearly two dozen a year in the next five years to prove the company’s production method.

Terran 1’s debut launch is expected in 2020, costing satellite makers $10 million per flight and carrying around 2,755 pounds (1,250 KG) to low earth orbit. That lands the company between U.S.-New Zealand competitor Rocket Lab, whose Electron rocket aims to send nearly 500 pounds to space for $5.7 million, and Cedar Park, Texas-based Firefly Aerospace Inc’s Alpha rocket, which is expected to loft 2,200 pounds (1,000 kg) into low-Earth orbit at a cost of $15 million per flight.

The company has three launch contracts, but they won’t be real until they start launching. If their 3D printing approach works it will cut their costs significantly. Whether it will work or not remains an open question. The 3D printing work I’ve seen with other rockets raises questions about exactly how much of a rocket engine you can make in such a way.

Relativity gets third launch contract

Capitalism in space: The new startup rocket company Relativity announced yesterday the signing of its third launch contract with Spaceflight, a company that until now has mostly specialized in arranging secondary payloads on big rockets for smallsat companies.

The launch services agreement between the two companies includes an order for one launch of Relativity’s Terran 1 rocket in the third quarter of 2021, with an option for an unspecified number of additional launches. Terms of the deal were not disclosed, although Relativity has publicized a list price of $10 million for the rocket.

Spaceflight will use those launches for dedicated rideshare missions, aggregating a set of small satellites to fly on the rocket.

The previous two contracts were with the long-established satellite communications company Telesat and a newer satellite company from Thailand called mu Space.

Relativity’s ability to get three launch contracts for a rocket that has not yet flown, no less tested, is somewhat puzzling. There are other companies, Rocket Lab, Vector, Firefly, and Virgin Orbit, that are either operational or have already tested prototype rockets or engines.

I suspect all the contracts have easy escape clauses, and are conditional depending on the company’s successful test program. I also suspect that the deals gave significant price breaks to all three companies for their willingness to sign under these circumstances.

Relativity gets a second launch contract

Capitalism in space: The startup rocket company Relativity today announced the signing of a second launch contract for its as-yet untested Terran 1 rocket.

Relativity, the world’s first autonomous rocket factory and launch services leader for satellite constellations, today announced a partnership with mu Space, the innovative Thai satellite and space technology company, to launch a satellite to Low Earth Orbit (LEO) on Relativity’s Terran 1 rocket, the world’s first and only 3D printed rocket.

The first contract was with the well-established satellite company Telesat. The rocket, Terran 1, is scheduled for its first orbital test flight at the end of 2020.

So, where does Relativity stand among the leaders in the new smallsat commercial rocket industry? Let’s do a quick review.

Rocket Lab is of course far in the lead. It has launched four times, and its Electron rocket is now operational.

Second in this race is probably Virgin Orbit. The company has won several launch contracts, and says it will begin launch tests momentarily of its LauncherOne air-launched rocket.

Next comes Vector Launch, though some might argue it is ahead of Virgin Orbit. This company has obtained a large amount of investment capital, has completed two test suborbital launches, has a number of launch contracts, and hopes to do its first orbital launch later this year.

After these three companies there is a pack of rocket companies, all with investment capital, tentative launch contracts, and rockets that are only in the development stages. These include Exos Aerospace, Relativity, and Firefly, with Exos probably in the lead as it has already test flown its reusable SARGE suborbital rocket.

This list does not include the pseudo-private Chinese rocket companies, OneSpace, ISpace, LinkSpace, Landspace, and ExSpace, all of whom are independently developing smallsat rockets using Chinese investment capital but working under the supervision of the Chinese government. Several of these companies have attempted orbital launches. As yet none have succeeded.

Nor have I included India, which has announced it is going to build its own smallsat rocket to supplement its larger PSLV rocket in order to maintain its market share in this new smallsat industry. I also have left out a number of European companies, all of whom are far behind but nonetheless exist and are beginning development.

Other then the already-operating Rocket Lab, all of these companies are predicting their first rocket launches within the next three years. Some will succeed. Some will not. Nonetheless, the launch pace as we move into the 2020s is likely to get quite interesting.

Smallsat rocket company Relativity gets its first launch contract

Capitalism in space: The smallsat rocket company Relativity has signed its first launch contract, even though they have yet to complete even one test flight.

Their chief executive nails the importance of this on the head:

In an interview, Tim Ellis, chief executive of Relativity, said the contract is the first customer for the Terran 1 that the company has announced. He said Relativity previously signed a contract with another customer that has yet to be announced.

“What’s really notable about this and why it’s so important for Relativity and the industry is that this is the first time that Telesat, or any major global satellite operator, has selected a completely venture-based aerospace startup for launch services,” Ellis said, noting that the companies had been in extensive discussions prior to announcing this contract. “The credibility of aligning with Telesat we believe is huge for what Relativity is developing.” [emphasis mine]

Their rocket, Terran-1, is not scheduled for its first orbital flight until the end of 2020. Yet, Telesat has given this company a contract. I suspect that contract has a variety of exit clauses, but I also wonder if it gives Telesat some interest in the company in exchange for backing it at this early stage.

Either way, the demand for launch services created by these proposed new smallsat constellations is forcing the satellite companies to make deals that they might never have considered in a less booming market.