To read this post please scroll down.

 

Readers! A November fund-raising drive!

 

It is unfortunately time for another November fund-raising campaign to support my work here at Behind the Black. I really dislike doing these, but 2025 is so far turning out to be a very poor year for donations and subscriptions, the worst since 2020. I very much need your support for this webpage to survive.

 

And I think I provide real value. Fifteen years ago I said SLS was garbage and should be cancelled. Almost a decade ago I said Orion was a lie and a bad idea. As early as 1998, long before almost anyone else, I predicted in my first book, Genesis: The Story of Apollo 8, that private enterprise and freedom would conquer the solar system, not government. Very early in the COVID panic and continuing throughout I noted that every policy put forth by the government (masks, social distancing, lockdowns, jab mandates) was wrong, misguided, and did more harm than good. In planetary science, while everyone else in the media still thinks Mars has no water, I have been reporting the real results from the orbiters now for more than five years, that Mars is in fact a planet largely covered with ice.

 

I could continue with numerous other examples. If you want to know what others will discover a decade hence, read what I write here at Behind the Black. And if you read my most recent book, Conscious Choice, you will find out what is going to happen in space in the next century.

 

 

This last claim might sound like hubris on my part, but I base it on my overall track record.

 

So please consider donating or subscribing to Behind the Black, either by giving a one-time contribution or a regular subscription. I could really use the support at this time. There are five ways of doing so:

 

1. Zelle: This is the only internet method that charges no fees. All you have to do is use the Zelle link at your internet bank and give my name and email address (zimmerman at nasw dot org). What you donate is what I get.

 

2. Patreon: Go to my website there and pick one of five monthly subscription amounts, or by making a one-time donation. Takes about a 10% cut.
 

3. A Paypal Donation or subscription, which takes about a 15% cut:

 

4. Donate by check. I get whatever you donate. Make the check payable to Robert Zimmerman and mail it to
 
Behind The Black
c/o Robert Zimmerman
P.O.Box 1262
Cortaro, AZ 85652

 

You can also support me by buying one of my books, as noted in the boxes interspersed throughout the webpage or shown in the menu above.


Boeing to reduce staffing for SLS due to overall delays in Artemis

Boeing announced yesterday that it is going to reduce the staffing for its SLS rocket, caused by delays in other parts of the program that force it to stretch out operations.

When Boeing cites “external factors,” it is referring to the slipping timelines for NASA’s Artemis Program. In January officials with the space agency announced approximately one-year delays for both the Artemis II mission, a crewed lunar flyby, to September 2025; and Artemis III, a lunar landing, to September 2026. Neither of these schedules are set in stone, either. Further delays are possible for Artemis II, and likely for Artemis III if NASA sticks to the current mission plans.

Although the SLS rocket will be ready for the current schedule, barring a catastrophe, the other elements are in doubt. For Artemis II, NASA still has not cleared a heat shield issue with the Orion spacecraft. That must be resolved before the mission gets a green light to proceed next year. The challenges are even greater for Artemis III. For that mission NASA needs to have a lunar lander—which is being provided by SpaceX with its Starship vehicle—in addition to spacesuits provided by Axiom Space for the lunar surface. Both of these elements remain solidly in the development phase.

What Boeing is telling us indirectly is that, though NASA has not yet announced any further delays in those launch dates for Artemis-2 and Artemis-3, those dates are going to be delayed, quite possibly by one or more years.

None of this is a surprise. I have long been predicting that the first manned lunar landing in the Artemis program will not take place before 2030. In fact, that date was obvious the moment NASA announced its plan to make the Lunar Gateway space station an integral part of the program, back in 2018, when it was called LOP-G.

Now that SLS development is complete and NASA considers it “operational”, Boeing is merely reducing the staffing to maintain its assembly line, reducing it accordingly because of expected delays when additional rockets will be needed.

Genesis cover

On Christmas Eve 1968 three Americans became the first humans to visit another world. What they did to celebrate was unexpected and profound, and will be remembered throughout all human history. Genesis: the Story of Apollo 8, Robert Zimmerman's classic history of humanity's first journey to another world, tells that story, and it is now available as both an ebook and an audiobook, both with a foreword by Valerie Anders and a new introduction by Robert Zimmerman.

 

The print edition can be purchased at Amazon or from any other book seller. If you want an autographed copy the price is $60 for the hardback and $45 for the paperback, plus $8 shipping for each. Go here for purchasing details. The ebook is available everywhere for $5.99 (before discount) at amazon, or direct from my ebook publisher, ebookit. If you buy it from ebookit you don't support the big tech companies and the author gets a bigger cut much sooner.


The audiobook is also available at all these vendors, and is also free with a 30-day trial membership to Audible.
 

"Not simply about one mission, [Genesis] is also the history of America's quest for the moon... Zimmerman has done a masterful job of tying disparate events together into a solid account of one of America's greatest human triumphs."--San Antonio Express-News

3 comments

  • Jeff Wright

    SLS and Phantom Works are about all Boeing-Yutani has that is any good–now that they killed 747.

    B-52 will likely fly after Boeing is no more…

  • From the NASA Artemis III page (https://www.nasa.gov/missions/artemis/artemis-iii/):

    “NASA has selected SpaceX to provide the human landing system that will transport Artemis III astronauts from Orion in lunar orbit to the surface of the Moon and back again. SpaceX plans to use a unique concept of operations to increase the overall efficiency of their lander. After a series of tests, SpaceX will fly at least one uncrewed demo mission that lands Starship on the lunar surface.”

    Is this the Starship that one Federal agency requires in order to meet the demands of the Executive Branch, of which that same-same Federal government is using every tactic short of outright seizure, to delay? That Starship? It appears that more Government agencies would like to have access to Starship capability, and are stymied by their own organization. Which would seem to indicate that large sections of the Federal Government are being shut-out of strategic political decision-making.

  • Mike Borgelt

    “It appears that more Government agencies would like to have access to Starship capability, and are stymied by their own organization. Which would seem to indicate that large sections of the Federal Government are being shut-out of strategic political decision-making.”

    It is clear that you have not yet figured out that the US government is a bunch of sometimes co-operating, sometimes competing, criminal gangs.

Leave a Reply

Your email address will not be published. Required fields are marked *