Aretha Franklin – Freeway Of Love
An evening pause: Hat tip Diane Zimmerman.
An evening pause: Hat tip Diane Zimmerman.
Capitalism in space: Though most of the press has focused on the Starlink announcement on March 22nd that it was raising its subscriber rates, that same day SpaceX announced that it too was raising its prices, increasing its launch fees by 8% to 10%.
The starting prices for a Falcon 9 or Falcon Heavy rocket will each increase by about 8%. A Falcon 9 launch will cost $67 million, up from $62 million, and a Falcon Heavy launch will now run $97 million, up from $90 million. A footnote on SpaceX’s pricing page notes that “missions purchased in 2022 but flown beyond 2023 may be subject to additional adjustments due to inflation.”
..The company also adjusted its prices for its small satellite rideshare program. Those flights will now start at $1.1 million to fly a payload weighing 200 kilograms to a sun-synchronous orbit, up from a base price of $1 million. SpaceX increased the cost of additional payload mass by 10% as well and will now charge $5,500 per extra kilogram, up from a previous $5,000 per kilogram.
As with the Starlink announcement, SpaceX officials stated that the price increase was due entirely by inflation.
The irony here is that SpaceX could easily raise its rocket prices by 20%, and still be undercutting its entire competition. Even with these increases it is still by far the cheapest game in town.
Nonetheless, when it comes to inflation we have only just begun. The consequences of the Ukraine war, the sanctions against Russia, the Biden administration’s restrictions on domestic oil production, and the various COVID regulations restricting commerce are all still in effect, and are all putting pressure on supply. Prices will continue to rise.
Capitalism in space: The astronauts who will fly to ISS on April 19th on the SpaceX’s fourth manned Dragon capsule announced yesterday that they named it “Freedom,” both to honor that fundamental human right that is also fundamental to American history as well as to honor the memory of the first American spacecraft, Freedom 7, which launched Alan Shepard on his short suborbital flight in 1961.
Once launched, SpaceX will have a fleet of four manned capsules, Endeavour, Resilience, Endurance, and Freedom.
Endeavour has carried humans aloft twice for NASA, and is scheduled to fly a record third time on April 3rd when it carries four commercial passengers to ISS for the company Axiom.
Resilience has also flown twice, once for NASA and once for SpaceX itself, launching a crew of commercial passengers in the fall of 2021.
Endurance has flown once, for NASA.
With the addition of Freedom, SpaceX will have a fleet of four manned spacecraft, matching the size of NASA’s now gone shuttle fleet. Whether the company will need to build more will depend on demand and on the number of missions it thinks these reusable capsules can complete safely.
Having received a budget boost from Congress for its manned lunar lander Artemis program, NASA yesterday announced that it is soliciting proposals from the private sector for a second lunar lander, so that the agency will not be reliant only on SpaceX’s Starship.
To bring a second entrant to market for the development of a lunar lander in parallel with SpaceX, NASA will issue a draft solicitation in the coming weeks. This upcoming activity will lay out requirements for a future development and demonstration lunar landing capability to take astronauts between orbit and the surface of the Moon. This effort is meant to maximize NASA’s support for competition and provides redundancy in services to help ensure NASA’s ability to transport astronauts to the lunar surface.
As part of this revised program, NASA also is negotiating a revision to its contract with SpaceX. It appears that this change will have SpaceX fly an additional manned mission with Starship, after which NASA would open up competition to everyone on future flights. The press release however is not entirely clear on this point.
This new competition will of course be a boon to the losers in the first manned lunar lander competition, Blue Origin and Dynetics. Both will certainly submit bids, as will others.
Capitalism in space: At a conference earlier this week Blue Origin officials confirmed that the first test flight of its orbital New Glenn rocket will not occur in ’22, but will be delayed again, into ’23.
New Glenn was originally supposed to launch in 2020, and has been delayed repeatedly since then, first because of new requirements imposed by the military and then because of delays in getting Blue Origin’s BE-4 rocket engine operational.
Though ULA is still aiming to launch its Vulcan rocket using the BE-4 in 2022, expect it to eventually recognize reality and delay also to ’23. That rocket was also supposed to make its first launch in ’20, and has been delayed for the same reasons.
These delays have cost both companies dearly. For example, had each been operational as planned, they might have won some or all of the launch contracts that OneWeb lost from the Russians. Instead, that business went to SpaceX.
An evening pause: Hat tip to Björn Larsson (LocalFluff) for reminding me of the work of Animusic. I had posted several pieces back before 2014, but none since. Time to schedule another.
Capitalism in space: The startup rocket company, Ursa Major, announced today that it has completed qualification tests of its new Hadley rocket engine and has begun delivering flight worthy engines to two different companies.
Startup Ursa Major announced Wednesday that it had completed qualification of its Hadley rocket engine for use by both a space launch vehicle and a hypersonic launch system. The Colorado-based company said it has already started delivering flight-ready Hadley engines to two customers, Phantom Space and Stratolaunch, and plans to produce a total of 30 engines this year.
The engine is relatively small compared to most rocket engines. Phantom will use seven in the first stage of its smallsat Daytona rocket, designed to launch cubesats into orbit. What Stratolaunch will use the engine for is unclear.
Capitalism in space: The head of Blue Origin’s rocket engine division has decided to leave the company, even as it was revealed that the first flight worthy BE-4 engines will not be delivered to ULA until May at the earliest.
According to company sources, the first two BE-4 flight engines are in final production at Blue Origin’s factory in Kent, Washington. The first of these engines is scheduled to be shipped to a test site in May for “acceptance testing” to ensure its flight readiness. A second should follow in reasonably short order. On this schedule, Blue Origin could conceivably deliver both flight engines to United Launch Alliance in June or July. Sources at Blue Origin and United Launch Alliance say development versions of the BE-4—which are nearly identical to the flight versions—have been performing well in tests.
Upon receiving the engines, United Launch Alliance plans to install two of the BE-4s on the Vulcan rocket for a debut launch as soon as possible. While at the Satellite 2022 conference in the District of Columbia, United Launch Alliance CEO Tory Bruno on Tuesday said he still anticipates that Vulcan’s debut launch will occur in 2022. However, a summertime delivery would be a very tight schedule for United Launch Alliance.
ULA was initially promised these engines more than three years ago. The delay not only put its Vulcan rocket three years behind schedule, it has delayed the development of Blue Origin’s own orbital rocket, New Glenn, by more than three years as well.
To supply the needed engines for both rockets Blue Origin will need to establish a production line that can churn them out at a much faster pace than indicated so far. Whether it can remains an unknown, with the exit now of the head of the company’s engine division making that unknown even more worrisome.
Capitalism in space: In announcing that the company has raised $75 million more in private investment capital, Firefly officials also said that it is now targeted May for its next launch attempt of its Alpha rocket.
The launch was partly delayed because of the federal government’s insistence that a Ukrainian businessman, who had saved the company when it went into bankruptcy, divest his ownership. That has now happened, so Firefly has gotten approval to launch.
Firefly CEO Tom Markusic told CNBC that the company “worked methodically and cooperatively with the government” to both complete the divestment, as well as to add “security protocols” at the company.
With the move complete, Markusic said the company now has “full access to our facilities to go back and launch.” Firefly will next transport its second Alpha rocket from its headquarters near Austin, Texas, to California, and aims to launch as soon as it can.
“We think it’ll take us about eight weeks from here to launch — so in May is our target,” Markusic told CNBC.
The company is also aiming to complete its second test launch two months after the first, assuming all goes well.
Capitalism in space: According to Elon Musk, SpaceX has decided that the company will no longer use Starship prototype #20 and Superheavy prototype #4 for the rocket’s first orbital test flight.
Instead, the company will fly two more recently built and upgraded prototypes, rumored to be numbers #24 for Starship and #7 for Superheavy. The company has also decided to switch from the first generation Raptor engines to Raptor-2s.
All these changes likely explain Musk’s announcement that the first orbital launch will not happen sooner than May. The changes also further suggest that SpaceX has realized federal permission to launch from Boca Chica will be further delayed, and thus it might has well push forward in other ways as it waits for the right to launch.
I suspect that if the federal government hadn’t moved in to block operations, it would have flown prototypes 20 and 4 two months ago, just to get some data. Now such a flight seems pointless, as more advanced prototypes are now almost ready to fly.
This decision also reinforces my prediction that no orbital flights will occur out of Boca Chica before summer, and are more likely blocked through November. It also increases my expectation that the first orbital flight might not occur at all in Texas. The longer the Biden administration delays SpaceX’s operations there, the greater the chance the entire Starship/Superheavy launch program will shift to Florida.
Capitalism in space: Starlink has now unveiled newer higher prices for getting its internet service, even for those who had previously put down a deposit for the service.
Originally, opting into Starlink required a $499 upfront purchase of a starter kit with all the necessary supplies, including a user terminal, or antenna, for connecting with SpaceX’s satellites. Customers would then pay a $99 monthly charge to keep the service running. Now, the new monthly price going forward will be $110. All new orders of the Starlink kit will now cost $599, and anyone who put down a deposit for the original $499 kit will have to pay $549 instead. The new monthly prices will come into effect at different times for different customers.
The price increase either indicates the lack of competition existing for those who want good internet service in the regions Starlink presently serves, or it suggests the cost of launching the system is higher than Starlink first anticipated. Either way, the higher cost gives an opportunity to others.
An evening pause: Hat tip Tom Wilson.
Capitalism in space: In a tweet yesterday Elon Musk said that Starship will be ready for first orbital launch in May, a delay of two months from his previous announcements.
“We’ll have 39 flightworthy engines built by next month, then another month to integrate, so hopefully May for orbital flight test,” Musk tweeted in response to CNBC.
While the delay could certainly be because the company needed to prepare enough Superheavy engines, I also suspect it is also because Musk now expects the FAA to not approve the environmental reassessment of Starship’s Boca Chica launch site by the end of March, as has been promised. I predict that sometime in the next few days the FAA will announce another one-month delay in that process, the fourth such delay by that federal agency.
In late-December, when the FAA announced the first delay, I predicted that the first orbital launch of Starship would not happen until the latter half of ’22. I now think that prediction was optimistic. I firmly believe the federal government, controlled by Democrats, will delay that launch until after the mid-term elections in November. It appears to me that the Biden administration wants to reject the environmental reassessment, which would block Starship flights from Boca Chica for years. It just doesn’t want to do it before November, because of the negative election consequences.
I truly hope my cynical and pessimistic analysis is utterly wrong. So far, however, my prediction has proven to be more right than wrong.
Capitalism in space: For reasons not explained, SpaceX has ended all further business with the launch services company Spaceflight, which acts to find and integrate smallsats from many different companies into a package for launch.
Spaceflight also provides many of those smallsats with a small tug, dubbed Sherpa-LTC, to move them into their preferred orbit once deployed from the Falcon 9 upper stage. It looks like there have recently been problems with this tug that Spaceflight has not been able to resolve to SpaceX’s satisfaction.
The propulsion leak on Spaceflight’s Sherpa-LTC vehicle was discovered about three weeks before the Jan. 13 SpaceX Falcon 9 Transporter-3 launch. Root-cause analysis of the leak traced the problem to an oxidizer circuit in the propulsion system, which worked as designed but vented some trapped liquid due to a design flaw.
…Regarding the upcoming launch, Spaceflight began working with SpaceX to address concerns about “the analysis and test results of Sherpa and its customer payloads” as soon as it became aware of them.
Despite Spaceflight’s “best efforts, SpaceX chose not to fly the Sherpa vehicle until the analysis and test approaches could be better understood,” Sorensen said. “We continue to work with SpaceX to understand their decision and address any concerns for future missions.”
It appears, though not confirmed, that SpaceX is not just worried about Sherpa, but is also concerned about Spaceflight’s quality control efforts, and that might be the reason it has reject Spaceflight from future launches.
An evening pause: We all know that the real purpose of the internet is to look at cute or intriguing animal videos. Here’s one about a crow. It also makes I think a nice intro to spring.
Hat tip Mike Nelson.
Capitalism in space: Just 18 days after its contract with Arianespace was suspended because of Russia invasion of the Ukraine, OneWeb has now signed a deal with SpaceX to use its Falcon 9 rocket to launch the remaining 200+ satellites in its satellite constellation.
Few details about the agreement were released Monday morning. “Terms of the agreement with SpaceX are confidential,” OneWeb said in a statement.
OneWeb said the “first launch” with SpaceX is expected before the end of this year, suggesting the company anticipates multiple flights on SpaceX rockets.
It appears that launches could start before the end of this year
There are two big losers in this story. The obvious one is Russia, as it has lost OneWeb as a satellite customer. The second, less obvious, is Arianespace, as it appears it has also lost OneWeb as a customer. It will also have to refund OneWeb any payments the satellite company made for launches that have not occurred, even those that Arianespace had paid Russia for which Russia is refusing to refund.
Though no details have been released about the deal, I would not be surprised if OneWeb got a better price than what it was paying Arianespace. I also suspect that Elon Musk was willing to make this deal with OneWeb, the prime competitor to his Starlink satellite constellation, because he favors the Ukraine in this war.
Finally, this deal will not only make Russia look bad, it will make SpaceX look magnificent. Its PR value cannot be measured for the company.
Capitalism in space: SpaceX tonight successfully used its Falcon 9 rocket to launch another 53 Starlink satellites into orbit.
The first stage completed its 12th flight, a new record. The fairings were also reused, one half for the fourth time and the other for the second time. SpaceX continues to maintain a one launch per week schedule in 2022.
At posting the upper stage still had one more engine burn to insert itself into the final orbit, followed by satellite deployment.
The leaders in the 2022 launch race:
11 SpaceX
6 China
3 Russia
2 ULA
The U.S. now leads China 17 to 6 in the national rankings.
A evening pause: The orchestra is the Chopin University of Music Orchestra, with Klaudia Abramczuk on the bassoon.
Hat tip Dan Morris.
Capitalism in space: In a tweet today Elon Musk announced 2029 as his present target date for the first Starship manned mission to Mars.
This target date should not be considered firm, though it must be taken seriously. Musk’s past predictions tended to be optimistic, but also not unrealistic. If Starship development proceeds at the pace SpaceX is presently maintaining, this date is wholly doable.
The article at the link also said that the first Starship orbital test flight “is expected to take place within the next month.” That certainly matches with Musk’s previous statements, but ignores the bureaucratic delays from the FAA that at the moment prevent it from happening.
Capitalism in space: Sierra Space has now partnered with Japan’s Mitsubishi for developing technology to be used on the private commercial Orbital Reef space station project.
The companies did not elaborate on the technologies they will consider for Orbital Reef under the agreement. MHI does have extensive experience in International Space Station operations as the manufacturer of the Kibo laboratory module, which was installed on the station in 2008. The company also built the HTV cargo spacecraft and H-2 launch vehicle that launched those spacecraft to the station.
…Sierra Space’s role in Orbital Reef includes providing inflatable modules called the Large Integrated Flexible Environment (LIFE) Habitat. The company’s Dream Chaser vehicle under development will transport cargo and crew to and from the station.
A consortium led by Blue Origin announced Orbital Reef last October. In addition to Blue Origin and Sierra Space, Boeing will provide a science module, CST-100 Starliner commercial crew vehicle and support for station operations, while Redwire Space will handle microgravity research and manufacturing, payload operations and deployable structures.
This deal suggests that the project wants more experience in its stable. Also, by partnering with Mitsubishi, it likely garners political support in Japan.