To read this post please scroll down.

 

Readers!

 

My July fund-raising campaign to celebrate the fifteenth anniversary since I began Behind the Black is now over. I want to thank all those who so generously donated or subscribed, especially those who have become regular supporters. I can't do this without your help. I also find it increasingly hard to express how much your support means to me. God bless you all!

 

The donations during this year's campaign were sadly less than previous years, but for this I blame myself. I am tired of begging for money, and so I put up the campaign announcement at the start of the month but had no desire to update it weekly to encourage more donations, as I have done in past years. This lack of begging likely contributed to the drop in donations.

 

No matter. I am here, and here I intend to stay. If you like what I do and have not yet donated or subscribed, please consider supporting my work here at Behind the Black. You can support me either by giving a one-time contribution or a regular subscription. There are four ways of doing so:

 

1. Zelle: This is the only internet method that charges no fees. All you have to do is use the Zelle link at your internet bank and give my name and email address (zimmerman at nasw dot org). What you donate is what I get.

 

2. Patreon: Go to my website there and pick one of five monthly subscription amounts, or by making a one-time donation.
 

3. A Paypal Donation or subscription:

 

4. Donate by check, payable to Robert Zimmerman and mailed to
 
Behind The Black
c/o Robert Zimmerman
P.O.Box 1262
Cortaro, AZ 85652

 

You can also support me by buying one of my books, as noted in the boxes interspersed throughout the webpage or shown in the menu above.


Starlab selects Vivace to build the primary structure of its proposed space station

The American space stations under construction
The American space stations under development

The Starlab consortium today announced that it has chosen the Louisiana space hardware company Vivace to build the primary structure of its proposed space station, designed to launch as one very large module inside SpaceX’s Starship.

The aluminum-based structure, one of the largest single spaceflight structures ever developed for launch, will be built at Vivace’s facility in New Orleans, La., with additional development and testing support from [NASA’s] Michoud Assembly Facility (MAF) in Louisiana.

…The program will use Vivace’s New Orleans facility at MAF for fabrication, with support from U.S. government partners for subject matter expertise, structural analysis and potential test infrastructure. MAF will also support specialized large-scale manufacturing and assembly operations.

It appears Starlab chose this subcontractor because of its extensive ties to NASA, likely in the hope this will increase the chances it will win the upcoming station construction contracts NASA is expected to issue in the next year or so.

The four commercial stations under development, ranked by me based on their present level of progress:

  • Haven-1, being built by Vast, with no NASA funds. The company is moving fast, with Haven-1 to launch in 2026 for a three-year period during which it will be occupied by four 2-week-long manned missions. Initially the company hoped flying actual hardware and manned missions would put it in the lead to win NASA’s phase 2 contract to build its much larger mult-module Haven-2 station. Now it is in an even better position to win one of the smaller development contracts NASA intends to issue.
  • Axiom, being built by Axiom, has launched four tourist flights to ISS, with the fourth carrying government passengers from India, Hungary, and Poland. Though there have been rumors it has cash flow issues, development of its first module has been proceeding more or less as planned.
  • Starlab, being built by a consortium led by Voyager Space, Airbus, and Northrop Grumman, with extensive partnership agreements with the European Space Agency and others. Its station design has been approved by NASA, but it has built nothing. The deal with Vivace however suggests some construction is about to move forward, especially because the company has raised $383 million in a public stock offering in addition to the $217.5 million provided by NASA.
  • Orbital Reef, being built by a consortium led by Blue Origin and Sierra Space. Overall, Blue Origin has built almost nothing, while Sierra Space has successfully tested its inflatable modules, including a full scale version, and appears ready to start building its module for launch.

Genesis cover

On Christmas Eve 1968 three Americans became the first humans to visit another world. What they did to celebrate was unexpected and profound, and will be remembered throughout all human history. Genesis: the Story of Apollo 8, Robert Zimmerman's classic history of humanity's first journey to another world, tells that story, and it is now available as both an ebook and an audiobook, both with a foreword by Valerie Anders and a new introduction by Robert Zimmerman.

 

The print edition can be purchased at Amazon or from any other book seller. If you want an autographed copy the price is $60 for the hardback and $45 for the paperback, plus $8 shipping for each. Go here for purchasing details. The ebook is available everywhere for $5.99 (before discount) at amazon, or direct from my ebook publisher, ebookit. If you buy it from ebookit you don't support the big tech companies and the author gets a bigger cut much sooner.


The audiobook is also available at all these vendors, and is also free with a 30-day trial membership to Audible.
 

"Not simply about one mission, [Genesis] is also the history of America's quest for the moon... Zimmerman has done a masterful job of tying disparate events together into a solid account of one of America's greatest human triumphs."--San Antonio Express-News

Leave a Reply

Your email address will not be published. Required fields are marked *