Blue Origin completes first full dress rehearsal countdown and static fire test of New Glenn
Blue Origin today successfully completed the first full dress rehearsal countdown and static fire test of its New Glenn orbital rocket at its launchpad at Cape Canaveral.
The tanking test included a full run-through of the terminal count sequence, testing the hand-off authority to and from the flight computer, and collecting fluid validation data. The first stage (GS1) tanks were filled and pressed with liquefied natural gas (LNG) and liquid oxygen (LOX), and the second stage (GS2) with liquid hydrogen and liquid oxygen–both to representative NG-1 set points.
The formal NG-1 Wet Dress Rehearsal demonstrated the final launch procedures leading into the hotfire engine run. All seven engines performed nominally, firing for 24 seconds, including at 100% thrust for 13 seconds. The test also demonstrated New Glenn’s autogenous pressurization system, which self-generates gases to pressurize GS1’s propellant tanks.
According to the company, the test achieved all its engineering goals, apparently making it ready for its targeted January 6, 2025 launch date. Beforehand however it will be rolled back into the assembly building so that its payload, Blue Origin’s Blue Ring orbital tug, can be stacked inside the fairings to fly a demo mission for the military.
Blue Origin today successfully completed the first full dress rehearsal countdown and static fire test of its New Glenn orbital rocket at its launchpad at Cape Canaveral.
The tanking test included a full run-through of the terminal count sequence, testing the hand-off authority to and from the flight computer, and collecting fluid validation data. The first stage (GS1) tanks were filled and pressed with liquefied natural gas (LNG) and liquid oxygen (LOX), and the second stage (GS2) with liquid hydrogen and liquid oxygen–both to representative NG-1 set points.
The formal NG-1 Wet Dress Rehearsal demonstrated the final launch procedures leading into the hotfire engine run. All seven engines performed nominally, firing for 24 seconds, including at 100% thrust for 13 seconds. The test also demonstrated New Glenn’s autogenous pressurization system, which self-generates gases to pressurize GS1’s propellant tanks.
According to the company, the test achieved all its engineering goals, apparently making it ready for its targeted January 6, 2025 launch date. Beforehand however it will be rolled back into the assembly building so that its payload, Blue Origin’s Blue Ring orbital tug, can be stacked inside the fairings to fly a demo mission for the military.