Judge strikes down Tucson/Worldview spaceport deal

A deal between Pima County in Tucson Arizona and the space tourism balloon company World View has been struck down.

The Tucson judge sided with the libertarian Goldwater group, which argued Pima County ran afoul of state rules governing subsidies and incentives to businesses. “Judge Woods’ ruling protects Pima County taxpayers from having to foot the bill for World View’s untested business model,” said Jim Manley, senior attorney at the Goldwater Institute. “Instead of relying on a sweetheart deal from taxpayers, World View will need to pay market rates to lease its building, just like every other business in Pima County.”

Goldwater attorneys didn’t like that Pima County approved the deal without a popular ballot measure and that the deal was done without an appraisal. Goldwater also argued the lease deal was for less than market rates for a custom building. “The county is free to renegotiate the lease,” said Manley, “but only after they appraise the building, hold a public auction, and lease the building to the highest bidder. All of that will protect taxpayers from illegally subsidizing a private business.”

As much as I want this business to thrive, I think the Goldwater Institute was right. Pima County violated numerous laws and even some parts of the state constitution putting together this deal. Even if there was no corruption here, it opened the door to future backroom corruption if the deal was allowed. Now, I expect World View and the county will have to renegotiate.

Congressional report worries over Falcon 9 engine cracks

A forthcoming congressional report, reported by the Wall Street Journal, reveals that NASA is concerned about cracks that occur in the turbopumps of SpaceX’s Merlin engines.

The newspaper says the report has found a “pattern of problems” with the turbine blades within the turbopumps, which deliver rocket fuel into the combustion chamber of the Merlin rocket engine. Some of the components used in the turbopumps are prone to cracks, the government investigators say, and may require a redesign before NASA allows the Falcon 9 booster to be used for crewed flights. NASA has been briefed on the report’s findings, and the agency’s acting administrator, Robert Lightfoot, told the newspaper that he thinks “we know how to fix them.”

A spokesman for SpaceX, John Taylor, said the company already has a plan in place to fix the potential cracking issue. “We have qualified our engines to be robust to turbine wheel cracks,” Taylor said. “However, we are modifying the design to avoid them altogether. This will be part of the final design iteration on Falcon 9.” This final variant of the Falcon 9 booster, named Block 5, is being designed for optimal safety and easier return for potential reuse. According to company founder Elon Musk, it could fly by the end of this year.

Here’s the real scoop: SpaceX initially built the engines to fly once, just as every single rocket company has done in the entire history of space, excluding the space shuttle. Under these conditions, the cracks could be considered an acceptable issue, which is what they mean when they say “We have qualified our engines to be robust to turbine wheel cracks.” My guess is that they tested the engines, found that the cracks were not a significant problem for a single flight, especially because the Falcon 9 rocket uses nine Merlin engines on the first stage and thus has some redundancy should one fail. And based on SpaceX’s flight record — no launch failures due to failed engines — that conclusion seems reasonable.

SpaceX is now redesigning to eliminate the cracks, however, because such cracks are not acceptable for engines that will fly multiple times on reused first stages.

Thus, this story, as leaked, appears to me to be a hit job by powers in Congress who dislike the competition that SpaceX poses to big government rockets like SLS. SLS will use salvaged shuttle engines, designed initially for many reuses, and thus are superior in this manner to SpaceX’s Merlin engines. The shuttle engines however were also built by the government, which didn’t care very much about the cost of development, or making any profits. The comparison thus is somewhat bogus. Moreover, I suspect these cracks were only discovered after SpaceX successfully landed and recovered some first stages. To put them on trial in the press now for doing good engineering research and redevelopment seems somewhat inappropriate.

The report itself has not yet been released, though it does also note lingering issues with the parachutes being developed for Boeing’s Starliner capsule.

Overall, both companies are struggling to start their operational flights by 2019. For Congress or NASA to try to put more roadblocks up in that development seems most counterproductive.

More new robots from Boston Dynamics

The video at the link shows off SpotMini, of video of which I posted previously. However, the first robot shown is one they have named Handle and is something they admit could be “nightmare-inducing.” It walks upright on two legs, but instead of feetpods it has wheels, giving it the ability to move very fast. And for some reason, they put its arms on backwards so that the elbows bend inward instead of outward.

Watch the video. The robot design work here is truly breath-taking.

The ships of Hanjin six months after it went bankrupt

Real news: Six months ago the shipping company Hanjin went bankrupt, stranding its 96 container ships worldwide. This article takes a detailed look not only on what happened to those ships since, but also at the state of the entire shipping industry.

There was a time when Hanjin’s collapse in August and this follow-up story would have been major news stories, covered by all the leading mainstream press outlets. No more. Even though it indicates significant financial and economic trends that should concern anyone who is serious about being an educated citizen, the press doesn’t cover it, and the public today really doesn’t care.

Just another indicator that a new dark age is looming.

ESA commits $91 million to reusable rocket engine development

The competition heats up? Despite a general lack of interest in reusability, the ESA has now committed $91 million to develop a new low cost prototype reusable rocket engine.

In an interview with SpaceNews, Airbus Safran Launchers CEO Alain Charmeau said FLPP is allocating 85 million euros ($91 million) to Prometheus to fund research and development leading to a 2020 test firing. Now that Prometheus is an ESA program, Charmeau expects more countries will get involved. “ESA will pay the contract to Airbus Safran Launchers and then Airbus Safran Launchers will cooperate with European industry, of course France and Germany, but we will have also contributions from Italy, Belgium, Sweden and probably a couple of others to a smaller extent,” Charmeau said.

This project reminds me of many NASA development projects. The agency spends the money to do a test firing, but the prototype is never used and gets abandoned as soon as the test is completed.

Things might change, however, come the 2020s. By then I think American companies will be quite successful in their effort to create reusable rockets, and that will leave Europe in the lurch competitively. Their solution at this time for combating that future competition however is not getting more competitive. Instead, as noted in the article at the link, Airbus Safran, the company building Ariane 6, wants the ESA to compel its members to use their rocket, regardless of cost.

The private weather industry moves forward

Link here. Key quote:

Early next month, aerospace start-up Spire Global of Glasgow, UK, will send a mini-satellite into space aboard an Indian government rocket. This ‘cubesat’ will join 16 others that are beaming a new type of atmospheric data back to Earth — and some scientists worry that such efforts are siphoning funding away from efforts to push forward the science of weather forecasting. Spire will begin providing observations to the US government on 30 April.

The probes track delays in radio signals from Global Positioning System (GPS) satellites as they pass through the atmosphere — a technique known as radio occultation. Researchers can use the data to create precise temperature profiles of the atmosphere to feed into weather-forecasting models — and eventually, perhaps, climate models.

Spire and its competitor GeoOptics of Pasadena, California, are participating in a pilot project announced in September by the US National Oceanic and Atmospheric Administration (NOAA), which is under pressure from the US Congress to determine whether it can cut costs by using commercial weather data. But scientists worry that such efforts are hampering the development of radio occultation. For years, they have sought federal funding for a project to advance the technique, but Spire and its competitors say they can offer high-quality data for a fraction of the price. [emphasis mine]

The quotes I have highlighted illustrate the hidebound leftist scientific opposition to introducing private enterprise into weather research. The article, published in the journal Nature, never once articulates in any way how these private efforts will hurt scientific research. What it does show is that the private effort will cost a tenth of the government effort while getting launched much faster. The money, however, will go to these private companies, and not the scientific factions that up until now have lived on the government money train.

The complaints here are the same as those I saw in NASA back about a decade ago when NASA first considered hiring private companies to provide it cargo to ISS. This is a turf war. NOAA is now being pressured by Congress to do the same: stop building big expensive weather satellites and buy the service for much less from the private sector. The scientific community sees this as a threat to its funding and is trying to stop it.

With Republicans controlling all three branches of the federal government I think this opposition will be fruitless, and we shall see the shift to private enterprise in weather data-gathering to accelerate.

Government-owned Alaska Aerospace considers second spaceport

The competition heats up: State-owned Alaska Aerospace is considering opening a second spaceport outside the state and closer to the equator.

Alaska Aerospace operates the Pacific Spaceport Complex Alaska. The Kodiak Island complex is capable of polar, sun-synchronous and high-inclination orbits, but does not support the equatorial launches that make up most of the industry demand. With the new launch facility, Campbell said having equatorial launches will give the corporation a competitive advantage and also bring more customers to Kodiak.

The state no longer funds the corporation, which has never made money. Still, it now has contracts with Rocket Lab and Vector Space Systems and this new move is an obvious effort to make itself more viable.

Recovered Falcon 9 first stage prepped for launch

The competition heats up: SpaceX on Tuesday revealed that last week it has completed the standard static fire testing of the recovered Falcon 9 first stage that it plans to relaunch in March.

A March launch would mean an 11-month turnaround, which is far from optimal, but understandable for the first time. SpaceX’s founder and chief executive, Elon Musk, has acknowledged the company must do better in the future if resuable flight is to become economically viable. He says the next—and likely final—iteration of the Falcon 9 rocket will be optimized for reuse. “Block 5 is the final upgrade of the Falcon architecture,” he tweeted earlier this year. “Significantly improves performance & ease of reusability. Flies end of year.”

It now seems likely that SpaceX will fly the landed boosters it currently has, at most once or twice, before retiring them, instead of multiple times. Although the company hasn’t elaborated on the problems with the engines, booster structure, or composite materials that have shown wear and tear after their orbital launches and returns, Musk is confident that changes to the Block 5 version of the rocket will solve the problem. “I think the F9 boosters could be used almost indefinitely, so long as there is scheduled maintenance and careful inspections,” he has said.

In other words, SpaceX has had — for the first time in history — the opportunity to inspect a number of used first stage rockets, and that precious knowledge is making it possible for them to upgrade the stage design to make future stages more hardy. In fact, those future stages won’t be stages, but reusable vessels that SpaceX could even name if it wished.

India to launch spare GPS satellite because of single satellite failure

Because of the failure of the atomic clocks on one of its GPS satellites have failed, India now plans to launch one of their spare satellites to increase the system’s redundancy.

The article does not say whether they will make any changes to the clocks on the spare satellite, which are the same as the failed clocks on the Indian satellite and were all built by the same European company that built the clocks on Europe’s Galileo GPS satellites that are also failing.

Next Falcon 9 launch delayed as SpaceX rearranges manifest

Because the launchpad at Kennedy is not quite ready for the planned February 3 launch of a commercial satellite, SpaceX has rearranged its launch manifest to switch that launch with the next Dragon mission to ISS, essentially delaying their next launch by two weeks.

With [launchpad] 39A still not ready to debut in its new role with SpaceX, the first mission set to launch from this pad – the Falcon 9 launch with EchoStar 23 – was pushed to the right a number of times. Although 39A is very close to being ready to conduct launches, EchoStar 23’s launch date was deemed to be too close to the mid-February target for the CRS-10 Dragon mission.

SpaceX and NASA discussed the situation on Friday night, before deciding it would be prudent to place EchoStar 23’s launch after CRS-10, allowing engineers to finalize modification and checkout work on the famous pad and simultaneously avoid a potential delay to the important Dragon mission to the Station.

The real problem here is that SpaceX had planned to have two working launchpads by this time, but doesn’t because their first pad was damaged in the September 1 Falcon 9 launchpad explosion. The consequences is that, for at least the next month, they will not be able to set a pace of a launch every two weeks.

Soyuz launches successfully from French Guiana

A Russian Soyuz rocket, built for Arianespace and launched from French Guiana, successfully placed a commercial satellite in geosynchronous orbit on Friday.

The launch has some significance. First, it was the first time a Soyuz rocket placed a payload into geosynchronous orbit. Second, the payload was the first satellite built by a German company in more than 25 years

Finally, and most important, it demonstrated that at least one configuration of the Soyuz rocket is still operational as Russia investigates the corrupt practices at the company that has been building upper stage engines for both its Soyuz and Proton rockets.

Update: Russia has revealed that this on-going investigation will now delay the next Proton rocket launch for 3.5 months. This means that launch will occur sometime in May, and will occur just weeks short of a full year after the last Proton launch on June 9, 2016.

Making a Linux laptop

Yesterday while I was sitting at my desk working on my Linux desktop computer, I got a phone call from someone from “Windows Technical Support.” The man on the line said to me, quite nicely, that they had noticed a problem with my computer and wanted to help me fix it.

I said, “You are talking about my Windows desktop computer, the one I am working right now, correct?”

The man said sweetly, “Yes, sir. That’s the computer we have seen a problem with.”

I answered sweetly, “I just want to be sure, so let me ask again. You are referring to the Windows computer in front of me, the one on my desk?”

He responded, “Yes sir. Could you press your start menu please and go to settings?”

Unfortunately, I had too much work to do, and couldn’t spend more time with him. I would have liked to have led him along for as long as possible, but simple didn’t have the time. Instead, I said, “Um, I can’t really go to my Windows settings because my desktop is a Linux computer, and has been for a decade. Have you heard of Linux?”

Instantly the phone went dead.

I tell this tale because it is only one more reason I abandoned Windows back in 2006. With Linux I have no viruses to worry about, and scammers like this can’t do me any harm.

Anyway, this post really isn’t about Windows scammers. Instead, I want to relate my experience this past week in setting up my first Linux laptop, following the step-by-step instructions provided by James Stephens and posted here on Behind the Black last year in the following series:
» Read more

Boeing unveils its spacesuit for Starliner missions

The competition heats up: Boeing today unveiled the streamlined but snazzy spacesuit it plans to use on its Starliner manned ferry flights to and from ISS.

This tidbit though I think illustrates the new mindset, to make things simpler and cheaper and more focused on their actual purpose.

Boeing’s suit, designed with the Massachusetts-based David Clark Co., weighs about 12 pounds, compared to 30 pounds for NASA’s orange suits formally called the Advanced Crew Escape Suit, or ACES. …The “get us home suit,” as Ferguson called it, couldn’t be used for a spacewalk. It’s intended to provide air and cooling to keep astronauts safe during launch and landings back on land, and during emergencies, like if a micrometeoroid strike caused a loss of cabin pressure.

Google Lunar X-Prize finalists named

The competition heats up: The five finalists for the Google Lunar X-Prize have now been set.

Five teams remain in the running: Israel’s SpaceIL, Florida-based Moon Express, an international team known as Synergy Moon, India’s Team Indus and Japan’s Hakuto.

SpaceIL plans to fly on a SpaceX Falcon 9 rocket, which recently returned to flight following a launch pad accident. Team Indus and Hakuto will share a ride on an Indian PSLV launcher. Moon Express is banking on a launch from startup Rocket Lab, which is developing a small rocket called Electron. Whether it wins the XPrize or not, Moon Express is building a business to provide lunar transportation and services, such as research and mineral extraction, Chief Executive Bob Richards said in an interview. Synergy Moon is counting on one of its partners, Mojave, Calif.-based Interorbital Systems, for its launch aboard a new rocket known as Neptune.

To win, one of these teams must fly its mission before the end of 2017.

Trump’s 1st NASA appointees suggest future policy

A memo released January 20 from NASA’s acting administrator accepting the job also announced the first Trump appointees to NASA. The history and policy positions of those two appointees I think once again give us a very clear indication of where NASA might be going in the coming years.

[Acting administrator Robert] Lightfoot, in the memo, said that the administration has appointed Erik Noble to serve as White House senior advisor and Greg Autry to be White House liaison. The two are the first members of the so-called “beachhead team” of administration staffers assigned to NASA, at least on a short-term basis.

Autry is an assistant professor of entrepreneurship at the University of Southern California who has been a proponent of commercial space activities. Autry was one of eight members of the agency review team, or “landing team,” assigned to NASA by the transition office of then President-elect Trump.

Noble did not serve on the landing team, but worked on the Trump campaign as a political data analyst. Noble, who earned a Ph.D. in environmental studies from the University of Colorado, spent seven years at the NASA Goddard Institute of Space Studies in New York, working on weather and climate models. [emphasis mine]

Autry, believes strongly in private space, and has also been a critic of SLS/Orion. Being placed at NASA as Trump’s first appointee strongly suggests that a Trump administration is going to accelerate the commercial space push that was begun by the Bush administration and then strongly supported by the Obama administration. It also suggests that the SLS and Orion projects are going to face a difficult future and will likely be phased out.

Noble’s appointment is more important. As a former scientist at the Goddard Institute, he is now well positioned to possibly appoint a new head to that organization, or even become its head himself. The present person in charge there, Gavin Schmidt, has increasingly become suspect as a scientist, instead appearing more as global warming political advocate. Since he took over that Institute, the climate data there has been increasingly tampered with, with past data being cooled and recent data being warmed, thus creating the impression that the Earth’s climate has been warming more than indicated by all previous research. Schmidt’s explanations for these “adjustments” (the term he uses) have never been satisfactory. He then uses the results from these “adjustments” to make annual press releases declaring each year as the “hottest” ever, though the raw data shows no such thing.

Even if Noble does not replace Schmidt, Noble appears well positioned to force Schmidt to either finally justify his data adjustments, or remove them from the data stream so that the raw data will be allowed to dominate policy decisions once again.

Bigelow proposes extending life of its ISS module beyond its two year demo

Bigelow Aerospace is in negotiations with NASA to allow use on ISS of its demonstration inflatable BEAM module beyond its planned two year test mission.

BEAM is designed for a two-year mission on the ISS. The module is closed off from the rest of the station most of the time, with astronauts periodically entering BEAM to check the status of the module and instruments mounted inside.

NASA has previously indicated that it would dispose of BEAM at the end of its two-year mission, using the station’s robotic arm to detach the module and allow it to burn up in the atmosphere. There are no immediate plans, though, for use of the docking port where BEAM is installed after that two-year mission ends, opening the possibility for an extended mission.

Robert Bigelow has previously suggested there was commercial interest in the module. As a NASA press conference in April 2016 prior to the launch of BEAM, he said there were four different groups, both countries and companies, interested in flying experiments in BEAM. “We’re hoping that, maybe in half a year or something, we can get permission from NASA to accommodate these people in some way,” he said then.

It is typical NASA behavior to throw this module out after two years, rather than find a way to use it.

Posted from a hotel room in St. Louis, Missouri.

India delays next launch of its largest rocket

India has delayed the next launch of its GSLV rocket from January to no earlier than March in order to conduct tests on the rocket.

This does not change the schedule for the next launch of their smaller PSLV rocket, which is still set for February and will launch a record of over a hundred satellites, most of which are smallsats.

Posted from Tucson Internationa Airport. I am heading to St. Louis today to give a lecture to the local chapter there of the AIAA.

Atomic clocks on 9 of 72 European GPS satellites have failed

The atomic clocks on 9 of the 72 European Galileo GPS satellites, designed to compete with the American, Russian, and Chinese GPS satellites, have failed.

No satellite has been declared “out” as a result of the glitch. “However, we are not blind… If this failure has some systematic reason we have to be careful” not to place more flawed clocks in space, [ESA director general Jan Woerner] said.

Each Galileo satellite has four ultra-accurate atomic timekeepers — two that use rubidium and two hydrogen maser. Three rubidium and six hydrogen maser clocks are not working, with one satellite sporting two failed timekeepers. Each orbiter needs just one working clock for the satnav to work — the rest are spares.

The question now, Woerner said, is “should we postpone the next launch until we find the root cause?”

That they are even considering further launches with so many failures of the same units seems absurd. They have a systemic problem, and should fix it before risking further launches.

SpaceX prepares used 1st stage for February launch

The competition heats up: Even as SpaceX moves forward on an intense launch schedule, with launches planned for January 26 and February 8, it has begun preparations for a late February commercial launch that will be the first to reuse a first stage.

The first stage assigned to SES 10’s launch first flew April 8, 2016, with a Dragon supply ship on a logistics launch to the International Space Station. After detaching from the Falcon 9’s second stage, which continued into orbit, the 15-story first stage booster descended to a vertical landing on SpaceX’s offshore platform a few minutes after liftoff, making the first time the company recovered a rocket intact at sea.

The landing on SpaceX’s barge, or drone ship, last April came four months after the first-ever touchdown of a Falcon 9 first stage on land at Cape Canaveral. That vehicle is now on display outside SpaceX’s headquarters in Hawthorne, California.

This pace is calling for a launch every two weeks. It will spectacular if SpaceX can keep that up, but such a pace is not really unprecedented. The Soviets at their height managed it at times quite successfully.

Boeing obtains available seats on Soyuz as result of Sea Launch settlement

As part of Boeing’s settlement with Russia over the break-up of their Sea Launch partnership, the company has obtained rights to several manned Soyuz seats that are available because the Russians have cut back on the number of astronauts they are flying to ISS.

In turn, Boeing is offering these seats to NASA.

[John Elbon, vice president and general manager of space exploration at Boeing] said he expects NASA to make enter into negotiations with Boeing about the 2017 and 2018 seats shortly after a Jan. 27 deadline for companies to respond to the sources sought statement, a requirement when a government agency proposes a sole-source procurement. “Assuming that goes well, I think we would sit down and, in relatively short order, negotiate the details of this kind of arrangement,” he said.

He didn’t specify how much Boeing was proposing to charge NASA for the seats. The agency announced an agreement with Roscosmos in August 2015 for six Soyuz seats in 2018 at a total cost of $490 million, or $81.7 million per seat. “It’s a good value for NASA and the taxpayer,” Elbon said of Boeing’s proposed deal with NASA. “We wouldn’t ask them to pay more than they would have been paying before.”

What is happening here is that Boeing is trying to use these Soyuz seats as a way to recoup its losses from Sea Launch. The problem is that NASA doesn’t really need the manned flights in 2017 and 2018. They might need them in 2019, should the manned capsules that SpaceX and Boeing are building get delayed, but I am not sure that this deal will allow them to be used at that time.

Private Chinese rocket company gets launch contract

The competition heats up: A private Chinese rocket company, Landspace, has signed a launch contract with a Danish firm to launch an unstated number of satellites.

The article does not provide much information, but from it I suspect this is a smallsat operation, similar to Rocket Lab and Vector Space Systems. I also think that its private nature in China and the timing of its announcement, only a few weeks after China released its five year space plan which seemed to lend support to the development of a private space industry, provides confirmation of that support.

Japan’s SS-520 launch a failure

Japan’s attempt to launch a payload into orbit with the smallest rocket ever ended in failure today.

[A]ccording to the Japan Aerospace Exploration Agency (JAXA), communication systems malfunctioned after the rocket launched, causing the ignition of the second booster to be terminated. The rocket fell into the sea southeast of Uchinoura.

My impression of Japan’s space effort in recent years is somewhat comparable to that of Russia’s: Significant quality control issues that cause too many failures. This is just one more example.

I must also note that the rocket was not a private effort, but a demo project of Japan’s government space agency, JAXA, designed to show off new technology but funded through coercive government funds, not monies provided voluntarily by customers. Thus, the pressure to succeed was much less, as no one’s job or business was at risk should it fail.

1 174 175 176 177 178 262