NASA calls for the private sector to launch VIPER to the Moon

As a follow-up of its August request for suggestions on how to save its cancelled VIPER rover mission to the Moon, NASA has now issued a request for actual proposals from the private sector for flying the mission, due on March 3, 2025.

The Announcement for Partnership Proposal contains proposal instructions and evaluation criteria for a new Lunar Volatiles Science Partnership. Responses are due Monday, March 3. After evaluating submissions, any selections by the agency will require respondents to submit a second, more detailed, proposal. NASA is expected to make a decision on the VIPER mission this summer.

…As part of an agreement, NASA would contribute the existing VIPER rover as-is. Potential partners would need to arrange for the integration and successful landing of the rover on the Moon, conduct a science/exploration campaign, and disseminate VIPER-generated science data. The partner may not disassemble the rover and use its instruments or parts separately from the VIPER mission. NASA’s selection approach will favor proposals that enable data from the mission’s science instruments to be shared openly with anyone who wishes to use it.

Expect a number of companies to tout their proposals in press releases in the coming weeks.

3 comments

Boeing writes off another half billion dollars due to Starliner

In filing an annual report to the SEC, Boeing revealed that has written off another half billion dollars due to Starliner delays and technical problems, bringing the total the company has lost on the capsule to more than two billion.

In the company’s 10-K annual filing with the U.S. Securities and Exchange Commission Feb. 3, Boeing said it took $523 million in charges on Starliner in 2024. The company blamed the losses on “schedule delays and higher testing and certification costs as well as higher costs for post certification missions.”

Both Boeing and NASA remain utterly silent on the future of Starliner. It remains uncertified for operational manned flights, which means Boeing continues to earn nothing from it. Will it have to fly another manned mission on its own dime to get that certification? Or will NASA instead pay it to fly a cargo mission to ISS, as rumors have suggested, to prove the capsule is ready for manned flights?

No one knows. Nor do we know if Boeing will either sell off its space division or cancel Starliner entirely and thus free itself of the problem.

1 comment

Is SpaceX routinely stiffing its outside construction contractors in Boca Chica?

According to an article today in the San Antonio Express-News SpaceX has been routinely not paying its bills to construction contractors hired by it to build things in Boca Chica, and almost three dozen have had to file liens against the company to get their money.

A San Antonio Express-New review of Texas property records found at least 29 contractors — and six in San Antonio — have filed 77 liens against SpaceX since March 2022. Their total value is up from $2.5 million in May. Since then, SpaceX has settled at least six liens but gained another 44.

Though it’s unclear whether the money is owed by SpaceX, its general contractors or subcontractors, landowners are ultimately responsible for unpaid construction bills on their properties under Texas law. The liens are a legal mechanism for contractors and suppliers to secure their claims.

The article admits repeatedly that its information is incomplete, and that many of these liens might already be settled. It also admits that the failure to pay might not be by SpaceX, but as landowner with the most money, it is the biggest target capable of forcing payment by others.

It is also likely, with the amount of work and expansion that is going on at Boca Chica, such liens are somewhat expected, especially because they seem to be a relatively small amount compared to the billions that SpaceX is spending in the area.

Thus, though the article appears to suggest SpaceX is a deadbeat company, it also appears the article might also be part of the propaganda press’s effort to slander Elon Musk wherever it can.

Regardless, if SpaceX is behind in paying its bills, it needs to fix this issue now.

7 comments

Satellite startup Astranis awards SpaceX another launch contract

The satellite startup Astranis, which already has five small satellites placed in orbit by SpaceX, has announced a new SpaceX launch contract for launching its next five satellites later this year.

By making its geosynchronous satellites small, like cubesats, the company is challenging the recent trend away from these high orbits. In the past five years very few new big geosynchronous communications satellites have been built or launched, because they can’t compete with the cheaper low-orbit smallsats.

Astranis is bucking that trend, partly because of its small satellites, and partly because SpaceX’s launch costs are so much less than anyone else’s.

0 comments

British rocket start-up Orbex wins two-launch contract from Italian orbital tug company D-Orbit

The British rocket start-up Orbex, which hopes to complete its first test orbital launch of its Prime rocket this year, after years of regulatory delays, has gotten a two-launch contract from the Italian orbital tug company D-Orbit.

The contract appears to be part of Europe’s effort to have its European payloads launch on European rockets. Previously D-Orbit tugs have mostly been launched by SpaceX because the only available European rockets, Ariane-6 and Vega-C, have either not been operational or available. Moreover, all these rockets are too big for D-Orbit’s tugs, which thus have to fly as secondary payloads.

Orbex’s Prime rocket is small, and so the tugs can be launched as the primary payload. The rocket however is not yet operational, unlike for example Rocket Lab’s small Electron rocket. The decision to go with Orbex’s untested rocket suggests Europe is forcing D-Orbit to sign with a European rocket company.

2 comments

OneWeb is years behind schedule in activating its service in the Falklands

Despite contracts with the local government that said service would begin in 2023, OneWeb has still not activated its service in the Falklands, and that government is considering switching to Starlink as it considers legal action to recover its money.

Local reports say that the Falkland Islands government “wants its money back” from an agreement which it entered into with local telco SURE and which provides national and international fixed line, mobile data and broadband services as well as data centre and enterprise solutions to consumer and corporate customers. SURE is part of Bahrain’s Batelco Group and SURE’s coverage extends to the Ascension Islands and Saint Helena in the South Atlantic.

The problem is seemingly OneWeb. Mark Pollard, a member of the Falkland’s Legislative Assembly, speaking on January 30th, said that the telco had failed to introduce a promised service from OneWeb, which itself was supplied with capacity from Eutelsat and prime contractor Intelsat.

The article at the link does not provide any explanation for the delay. It is probably related to OneWeb’s requirement for ground stations to connect the local communications network with the satellites. There must be issues building those ground stations. Starlink meanwhile provides antennas to customers which connect directly to the satellites.

The article also notes the company’s stock value has been plummeting, dropping 62% in the past six months.

0 comments

SpaceX and Vast jointly request research proposals for first mission to Vast’s Haven-1 space station

Artist's rendering of Haven-1 interior
Artist’s rendering of Haven-1 interior.
Click for original.

With the launch of Vast’s single module space station Haven-1 still scheduled for August, SpaceX and Vast have jointly requested research proposals (here and here) for station’s first manned mission, expected to be a four person 30-day flight soon thereafter. From the Vast press release:

Building on their established partnership, the two companies seek high-impact research projects to support humanity on Earth and advance our capacity to live and work in Earth orbit and beyond. Submitted proposals will be evaluated based on scientific and technical merit, feasibility, and alignment with mission objectives. Approved research proposals will be able to leverage the capabilities of the Haven-1 Lab, Dragon spacecraft, and/or private astronaut missions to the International Space Station (ISS).

Haven-1 is the only one of four commercial space stations being designed or built that has taken no NASA money. It also appears it will be the first to launch, thus putting it an excellent position to win the larger space station contract from NASA to build its much larger Haven-2 station.

Though neither SpaceX nor Vast are offering any funding for these proposals, they offer researchers access to space quickly and with relatively little bureaucracy (something all scientists routinely face in working with NASA). Researchers who fly on that first mission will also become well positioned to win further NASA research space station contracts later on.

7 comments

NASA’s useless safety panel makes another useless announcement about Starliner

An official of NASA’s ineffectual and largely corrupt safety panel yesterday made another meaningless update on the work Boeing is doing to fix the thruster problems that occurred on the first manned flight of its Starliner manned capsule last summer, and as always told us absolutely nothing.

Paul Hill, a member of the Aerospace Safety Advisory Panel (ASAP), said at a Jan. 30 public meeting that the committee was briefed on the status of the investigation into Starliner’s Crew Flight Test (CFT) mission recently. That mission launched in June with NASA astronauts Butch Wilmore and Suni Williams on board, but the spacecraft returned to Earth three months later uncrewed because of agency concerns about the performance of spacecraft thrusters.

“NASA reported that significant progress is being made regarding Starliner CFT’s post-flight activities,” he said. “Integrated NASA-Boeing teams have begun closing out flight observations and in-flight anomalies.” He didn’t elaborate on the specific issues that the teams had closed out but stated that it did not include the thrusters, several of which shut down during the spacecraft’s approach to the station. The propulsion system also suffered several helium leaks. [emphasis mine]

In other words, this announcement was meaningless, because it included no information about the main problem. Hill’s comments were mostly empty blather, which is generally what this panel says in all its announcements. We still do not know when or if Starliner will fly again with astronauts on board.

Over the years the panel has bent over backwards to say positive things about Boeing, so that it missed all of Boeing’s design and construction failures from day one. At the same time it repeatedly slammed SpaceX, even though that company clearly had its act together and ended up fulfilling all of its contract obligations to NASA, even as Boeing has failed to do so.

If I was a member of Trump’s DOGE project, eliminating this safety panel would be very high on my list of things to do to make NASA’s more efficient. All it does is slow things down, often for exactly the wrong reasons.

3 comments
1 111 112 113 114 115 896