Blue Origin to begin flight tests of new rocket engine

The competition heats up: The rocket engine that Jeff Bezos’ Blue Origin company has been building is now ready for suborbital flight tests.

Blue Origin says the BE-3 is the first new hydrogen-fueled engine to be developed in the United States in more than a decade. It can be continuously throttled between 20,000 and 110,000 pounds of thrust. “Liquid hydrogen is challenging, deep throttling is challenging, and reusability is challenging,” Bezos said. “This engine has all three. The rewards are highest performance, vertical landing even with a single-engine vehicle, and low cost. And as a future upper-stage engine, hydrogen greatly increases payload capabilities.”

They hope to begin flight tests by the end of the year. Even as they develop this suborbital hydrogen engine, they are also developing an bigger engine for orbital flights in ULA’S next generation rocket that will replace the Atlas 5 and Delta.

Build a satellite of your own for less than $30K

The competition heats up: An industry of new cubesat builders can now build satellites for anyone for any reason for very little money.

The miniaturisation of technology allows people to do more with less hardware, said Chad Anderson, the managing director of Space Angels Network, an investment house specialising in the space industry. That industry, he said, was worth $300bn (£200bn) last year. Constellations of smaller satellites, like those suggested as tracking devices for planes over oceans, are now a possibility. “The launch costs are coming down and people leveraging today’s technology are able to do more with less and launch less mass to orbit. The price point has come down to where start-ups and entrepreneurs can really make an impact on the scene for the first time,” he said.

When the first tiny satellite launch companies arrive, expect this industry to blossom at an astonishing rate.

Sierra Hull – River Of Jordan

An evening pause: On this Good Friday evening, which is also the beginning of Passover when Jews worldwide sit down to retell the story of their exodus from slavery and the giving of the law, I think this lovely American bluegrass gospel song captures that same sentiment, from another time and place.

If you can’t watch the embedded video below, go here instead.

ESA and Airbus Safran in budget dispute over Ariane 6

The competition heats up: The deal between ESA and Airbus Safran to build Europe’s next generation rocket, Ariane 6, to compete with SpaceX for the launch market is now threatened because Europe wants the company to pay more for development than the company expected.

[ESA launch director Gaele] Winters acknowledged that Airbus Safran Launchers has not agreed with ESA’s assessment that industry’s share of the development cost is around 400 million euros. “They told us they have not signed off on the 400 million [euros], and this is correct,” Winters said. “It is an assumption we made, which we will look at next during the full Program Implementation review scheduled for mid-2016. Industry is prepared to invest in the program, and one important condition is that we need to be sure they have a fair rate of return on their investment.”

Winters said ESA is sensitive to the fact that additional costs borne by industry will find their way into the Ariane 6 pricing structure, which would undermine the vehicle’s competitiveness on the international commercial market.

If Airbus Safran wants to own the rocket, they must be willing to pay for some of its development, as have SpaceX and the other new American commercial space companies. This is the price for having the right to make money from the rocket outside of its European government customers. It seems, however, that Airbus Safran is balking at that reality. They are used to having everything covered by ESA, and are now unhappy they might have to lay out some bucks themselves.

China’s first reusable shuttle?

On Monday China launched the first of a new generation of GPS satellites using a secretive new upper stage they call Yuanzheng-1 (“Expedition-1” in English).

The first article describes Yuanzheng-1 as follows:

The Yuanzheng-1 (“Expedition-1″) uses a small thrust 6.5 kN engine burning UDMH/N2O4 with specific impulse at 3092 m/s. The upper stage should be able to conduct two burns and has a 6.5 hour lifetime. It will be adapted for use on the CZ-3A/B/C series mainly for direct MEO/GEO insertion missions (mostly for the navigation satellites of the Beidou GNSS).

This description make it appear that Yuanzheng-1 is nothing more than a typical upper stage, capable of bringing its cargo to the appropriate orbit.

The second article, however, has a concept picture of Yuanzheng-1, a shuttle-like craft that looks to me to strongly resemble the X-37B. Nothing in the second article however contradicts the first, which leaves us with a mystery. Is this upper stage capable of returning to Earth after it deploys its cargo? The fact that the Chinese were unusually secretive about the launch itself suggests that there was definitely something unusual about the rocket itself.

If the Chinese have made their upper stage reusable they have taken a big step to reducing costs in a way that will allow them to compete with SpaceX, should that company succeed in returning its first stage so that it can be reused.

U.S./Russian deal on space cooperation past 2024?

Russian news sources today described a news conference in Russia where it was announced that NASA and Roscosmos have come to an agreement about extending ISS until 2024, establishing common standards for manned vehicles, and to work together on building a new space station to replace ISS after 2024.

It appears that NASA head Charles Bolden is in Russia right now as part of the start of the year-long mission on ISS, and he has negotiated some agreement with Russia. If these reports are accurate, then it means that Russia has decided to work with the U.S. rather than go it alone on their next station.

All this assumes that future presidents and Congress agree with this proposal, a very big assumption indeed.

A photo tour of Vandenberg Air Force Base

Yesterday, as part of my visit to Vandenberg Air Force Base to give a space history lecture to the local section of the American Institute of Aeronautics and Astronautics, I was given a short tour of these west coast launch facilities. While Kennedy is used for launches that circle the equator, Vandenberg, with its southern-facing coast, launches rockets that head south over the ocean for a polar orbit.

We only had time to go inside one launchpad, where unfortunately I was not permitted to take pictures. However, the images I did get will give you a reasonable sense of the layout for this spaceport, which is increasingly becoming a spaceport for private launch companies like ULA and SpaceX. Though the bulk of business for both companies here might be military and government payloads, the future is still going to include a lot of private payloads. The images also help to highlight the differences between these two companies, as well as some past history, as one of these launchpads was once intended for the space shuttle, though never used for that purpose.
» Read more

Air Force subsidies to ULA to end

The competition heats up: Because it has concluded that they make it impossible to have a fair competition for contracts, the Air Force has decided to phase out the subsidies it has been paying to the United Launch Alliance (ULA).

The specific amounts of these subsidies have been effectively buried by the Air Force in many different contracts, so we the taxpayers really don’t know how much the are.

Nonetheless, this decision, combined with the military report released yesterday that criticized the Air Force’s over-bearing and restrictive certification process with SpaceX indicates that the political pressure is now pushing them hard to open up bidding to multiple companies, which in turn will help lower cost and save the taxpayer money.

Air Force demanded too much in its SpaceX certification process

In the heat of competition: A military review of the Air Force’s certification process of SpaceX has found that the Air Force has demanded far more changes from the company than were justified or proper.

The report, prepared by former Air Force Chief of Staff General Larry Welch, said the Air Force treated the process like a detailed design review, dictating changes in SpaceX’s Falcon 9 rocket and even the company’s organizational structure. That approach resulted in over 400 issues that needed to be resolved, which was “counterproductive” to a national policy aimed at encouraging competition in the sector.


In fact, the process was intended to show that SpaceX met overall requirements to launch military satellites, not carry out the more detailed review required for each launch on a case-by-case basis, he said.

The review also concluded that SpaceX was too resistent to any proposed changes.

SpaceX might have been too resistent, but this report confirms my suspiciion that the Air Force purposely created hoops for SpaceX to jump through because the Air Force really didn’t want to have to deal with SpaceX and wanted to make it too difficult for them to be approved.

Stay tuned for photo tour of Vandenberg

I am presently at Santa Barbara Airport waiting for my flight home to Tucson after spending the day at Vandenberg Air Force Base. After Steve and Jessica Tullino of the Vandenberg Section of the AIAA gave me a tour of the base, including a close look at one launchpad, I then was their speaker at their section’s luncheon meeting.

Anyway, I took a bunch of pictures and plan to post these sometime tonight or tomorrow. Stay tuned.

Sierra Nevada makes deal with Houston airport authority for Dream Chaser landings

Sierra Nevada has made an agreement with Houston’s airport authority to use Ellington Airport there to land its Dream Chaser spacecraft.

This announcement is part of the public relations push going on right now as NASA prepares to award its next round of cargo freighter contracts to two private companies. Sierra Nevada has bid to use an unmanned version of Dream Chaser to launch that cargo.

A photo tour of Vostochny

The Siberian Times has posted a very interesting photo tour of Russia’s new spaceport, Vostochny, presently under construction.

The article is very much a propaganda piece pushed by the Russian government (some photos were actually taken by Russian First Deputy Prime Minister Dmitry Rogozin himself), but it still gives you a sense of the scale and size of the project.

It is quite instructive to compare how the Russians do things, with a giant public works project costing $5 billion and taking more than a decade to build, with how the Americans do things, with a small privately-built space port being constructed by SpaceX in Brownsville for mere millions and in only a few years.

Test flight of rail-guided launcher delayed to October

The competition heats up: The first test flight of a rail-guided military small satellite launcher has been delayed until October 2015.

“Launch delays of the new launch system were driven primarily by technical development challenges on the first stage motor including design and delivery of the rocket motor case and the integrated rocket motor,” Anttonen said in a response to written questions from Spaceflight Now. “This motor is now complete along with the rest of the launch vehicle, and the launch is on hold pending an opening in the range schedule,” Anttonen said.

The launch system is designed to provide launch capability for small satellites like cubesats, with a launch cost of $12 to $15 million. If successful, it will be a direct competitor to Virgin Galactic’s LauncherOne, except that it appears it might be operational first.

Russian tourism flights to resume in 2018

The competition heats up: Faced with the loss of income from NASA in 2017, when private commercial ferries take over the job of bringing Americans to ISS, Russian officials today revealed that they plan to resume launching tourists to the station in 2018.

The problem the Russians will have then is that they will have competition from the American companies, who will likely be able to compete in price with them, and will be easier to work with.

Further SLS delays loom

A report by NASA’s inspector general finds that the planned first launch of the SLS rocket in November 2018 is threatened with delay because the ground facilities at Kennedy might not be ready.

In a report released Wednesday, NASA’s Office of Inspector General warned that Ground Systems Development and Operations, or GSDO, may be hard-pressed to have Kennedy Space Center’s launch facilities ready on time. Ground systems are a critical piece of the SLS-Orion infrastructure. All three elements are tightly integrated, with ground systems requiring significant input from the rocket and capsule designs. “GSDO cannot finalize and complete its requirements without substantial input for the other two programs,” said Jim Morrison, the assistant inspector general for audits. “And NASA is still finalizing the requirements for those programs.”

Gee, I guess SLS isn’t getting enough money, as its budget is only about $3 billion per year (about six times what the commercial space program gets per year, a program that has already created two freighter systems for ISS and is now creating two manned ferry systems for ISS). Why don’t we give them more, so that even more won’t be done with the money we spend?

1 277 278 279 280 281 341