ISEE-3 engine burn

The major course correction burn for ISEE-3 was only partially successful today.

We managed to conduct the first segment (composed of 63 thruster pulses) but encountered problems with the second and halted the remainder of segment firings. Today’s burn was supposed to be 7.32987 m/s. We’re looking at data and formulating a plan for tomorrow. Our window tomorrow (Wednesday) at Arecibo opens at 12:39 pm EDT and extends to 3:26 pm EDT.

Russia to phase out use of Ukrainian-built Soyuz rockets

As part of a major upgrade of its Soyuz rocket family, Russia is also ending its partnership with Ukraine in building those rockets.

The older Soyuz rockets rely on a Ukrainian control system — a relic of the rocket family’s Soviet heritage that in the aftermath of Russia seizure of Crimea from Ukraine in March looks like a threat to Russia’s space program. The rockets are based on the same core design that launched Sputnik and Yury Gagarin into space at the dawn of the space age. “The Soyuz-U and Soyuz-FG control systems are analog [systems] made in Ukraine,” Alexander Kirilin, CEO of the Progress Rocket and Space Center in the Volga city of Samara told Interfax on Monday.

However, the Soyuz 2 rockets use a Russian-made digital control system. Aside from further moving Russia’s space industry away from its reliance on Ukrainian components, the digital control system allows the rockets to handle a wider variety of payloads — making the tried-and-tested Russian rocket more versatile than ever before.

It is Russia’s plan to complete the transition to the new wholly Russian Soyuz 2 rockets for ISS missions within the next three years.

ISEE-3 engine burn tomorrow

The private effort to resurrect the 1970’s sun-observing space probe ISEE-3’s will attempt its first full engine burn on July 8.

They hope to get the spacecraft back into one of the Earth-Sun Lagrangian points where it can be controlled reliably from Earth and can thus resume its study the solar wind, as originally designed. They have most of July to make the burn that will shift the orbit appropriately, so if this first attempt fails they can still make it happen.

Buran moved to new exhibition location

After sitting in Gorky Park since 1995, the prototype of Russia’s space shuttle, Buran, was moved this past weekend to Moscow’s official outdoor exhibition center.

Back in 2003, when I was in Moscow interviewing people for Leaving Earth, my apartment was within walking distance of Gorky Park. I went over there to take a look. You could get to within a few feet of the prototype, which was sitting with no display signs or security other than a simple fence. It looked quite dilapidated (I would post the photographs I took but this was the last time I used my film camera, and they are all slides.)

The article above has some nice details describing the history of Buran, and why it only flew once. Definitely worth reading.

Problems with the European Gaia space telescope

Shades of Hubble: The first data from Europe’s Gaia space telescope, launched to map a billion Milky Way stars, will be delayed 9 months while engineers grapple with several problems.

Gaia managers started taking test images early this year, but soon noticed three issues. For one, more light than anticipated is bending around the 10-metre sunshield and entering the telescope.

Small amounts of water trapped in the spacecraft before launch are being released now that the telescope is in the vacuum of space, and more ice than calculated is accumulating on the telescope’s mirrors. In addition, the telescope itself is expanding and contracting by a few dozen nanometres more than expected because of thermal variations.

Mission managers say the number of stars detected will remain the same even if these complications remain untreated, but the accuracy in measurements of the fainter stars will suffer.

Unlike Hubble, however, there is no way to send a shuttle and a team of astronauts to Gaia to fix it. And it sounds like these issues will have an impact on the telescope’s abilities to gather its intended data.

This story raises my hackles for another reason. Gaia was a very technically challenging space telescope to build, but it was far easier and less cutting edge than the James Webb Space Telescope. It also cost far less. What will happen when Webb gets launched later this decade? How likely is it to have similar issues? Based on a story I just completed for Sky & Telescope on the difficulties of building ground-based telescopes, I’d say Webb is very likely to have similar problems, with no way to fix them. The American astronomy community could then be faced with the loss of two decades of research because they had put all the eggs into Webb’s basket, and thus had no money to build anything else.

Angara to fly July 9?

The first test flight of Russia’s new Angara rocket is now tentatively scheduled for July 9.

The story confirms that the problem was a faulty valve, which it appears they can replace at the spaceport, rather than return the rocket to the manufacturer. The story also had this line, which tells us that Russia is still struggling with quality control problems: “The valve’s malfunctioning was a result of sloppy assembly.”

Plastic bags do not kill birds and fill the oceans

Another environmental claim turns out to be vastly exaggerated: The scientist who claimed that islands of plastic bags were filling the oceans has found that his claim was bogus.

The scientist whose findings environmentalists used to shame us into bringing our own reusable bags to the grocery store now says that his estimate of one million tons of plastic floating in the ocean may have been off by a factor of perhaps 143. His latest estimate ranges from 7,000 to 35,000 tons, and even most of that has biodegraded into granules. …

Also doubtful: The environmentalist claim that 1.5 million marine animals choke to death each year on plastic bags that ran away from home for a life at sea. They’ve revised their estimates downward to 6.6 percent of that, but even the new figure has no empirical support.

But remember, Barack Obama says the science is settled, and that anyone who questions him or expresses any doubt is the equivalent of a Holocaust denier.

Space junk damages ISS coolant radiator?

According to the Russian Interfax news agency, a piece of space junk has hit a coolant radiator on the U.S. portion of ISS.

The source says that no coolant has escaped from the system and that NASA engineers are analyzing images to assess the damage.

Readers should be aware that I have tried without success to find the NASA website the story claims is the source for this information. Moreover, this story is reported nowhere in the U.S. press, and it is strange for a NASA website to report something like this and it not be quickly picked up by the U.S. press.

Thus, I am not entirely convinced yet that this story is accurate.

Update: a commenter below has provided this link to a subsequent post at nasaspaceflight about the impact.

Corvette Museum preserves sinkhole

Turning lemons into lemonade: The sinkhole that swallowed eight prized cars at the National Corvette Museum in Kentucky in February has become such an attraction that the museum intends to preserve it.

Attendance was up nearly 60 percent from March to the start of this week, compared to the year-ago period, museum officials said. Sign-ups for museum memberships are up sharply, as are merchandise and cafe sales at the museum. The museum sells sinkhole-related shirts, post cards and prints.

Museum board members considered three options for the sinkhole: fill it in, preserve the entire sinkhole or keep a portion of it. They opted to maintain about half the 40-foot-wide, 60-foot-deep sinkhole, Strode said. There’s a “strong probability” that one or two of the damaged cars will be put back in the hole, he said.

ISEE-3 fires its thrusters for the first time since 1987.

The private team resurrecting the 1970s space probe ISEE-3 successfully fired its thrusters for the first time since 1987.

It took several attempts and days to perform the roll maneuver because ISEE-3 was not responding to test commands. But this time, controllers got in touch. They increased the roll rate from 19.16 revolutions per minute to 19.76 RPM, putting it within mission specifications for trajectory corrections.

The spacecraft is now prepped for the big burn that will change its trajectory.

Telescope teamwork produces spectacular galaxy image

M106

Combining images from a host of space and ground-based telescopes, astronomers have created a spectacular image of the galaxy M106.

This galactic fireworks display is taking place in NGC 4258 (also known as M106), a spiral galaxy like the Milky Way. This galaxy is famous, however, for something that our Galaxy doesn’t have – two extra spiral arms that glow in X-ray, optical, and radio light. These features, or anomalous arms, are not aligned with the plane of the galaxy, but instead intersect with it.

The anomalous arms are seen in this new composite image of NGC 4258, where X-rays from NASA’s Chandra X-ray Observatory are blue, radio data from the NSF’s Karl Jansky Very Large Array are purple, optical data from NASA’s Hubble Space Telescope are yellow and blue, and infrared data from NASA’s Spitzer Space Telescope are red.

A new study of these anomalous arms made with Spitzer shows that shock waves, similar to sonic booms from supersonic planes, are heating large amounts of gas – equivalent to about 10 million Suns. What is generating these shock waves? Radio data shows that the supermassive black hole at the center of NGC 4258 is producing powerful jets of high-energy particles. Researchers thinkthat these jets strike the disk of the galaxy and generate shock waves. These shock waves, in turn, heat some of the gas – composed mainly of hydrogen molecules – to thousands of degrees.

The astronomers also used the Herschel Space Observatory to confirm the data from Spitzer.

Gigantic underground trampoline about to open

Want to have some fun? An amusement park in Northern Wales is about to open a gigantic underground trampoline ride to the public..

Battle Below is located deep within a 100 ft (30.5 m) deep and 60 ft (18.3 m) wide disused mine. The new site features three large trampolines stretching across the cave-like mine walls and are positioned at varying heights. The trampolines are linked together by 60 ft (18.3 m) slides and a spiraling staircase. Adding to the atmosphere, multi-colored LED lights have been installed throughout the mine, which project onto the walls of the cavern.

It took over a kilometer of nett and 4,500 man hours to complete the underground trampolines, which can accommodate 100 bouncing visitors at a time. Patrons are required to wear protective gear, including overalls and a helmet before gaining access to the site via an old mining train. They’re also encouraged to bounce as high as they dare, potentially reaching a maximum height of 80 ft (24 m).

Bounce Below opens on July 4, with tickets starting from £15 (about US$25) per person.

NASA and Boeing finalize contract to build the SLS rocket

NASA and Boeing today signed a $2.8 billion contract for Boeing to build the core stage of the SLS rocket

Scheduled for its initial test flight in 2017, the SLS is designed to be flexible and evolvable to meet a variety of crew and cargo mission needs. The initial flight-test configuration will provide a 77-ton capacity, and the final evolved two-stage configuration will provide a lift capability of more than 143 tons.

It would be nice for the U.S. to have this heavy-lift rocket, but I fully expect the funds to run out immediately after it makes its inaugural flight, despite the wonderful pork it provides to so many Congressional districts. It just costs too much per launch.

Russia abandons Sea Launch

Running from competition: The Russian space agency Roskosmos has decided not to spend the money necessary to buy Sea Launch and make it part of its consolidated United Rocket and Space Corporation (URSC).

Part of the reason the Russians are abandoning Sea Launch is that the rocket the ocean-going platform uses is the Ukrainian-built Zenit rocket, and Russia wants URSC to a wholly Russian operation. Rather than partner with Ukraine for profit, they will let the business die.

SpaceX’s Falcon Heavy rocket gets a customer

The competition heats up: The commercial satellite company Inmarsat has booked SpaceX’s Falcon Heavy rocket for one firm launch and two additional options.

The firm contract is for the launch, scheduled perhaps aggressively for late 2016, of a satellite being built for both Inmarsat and Arabsat of Riyadh, Saudi Arabia. Arabsat will use the satellite for conventional telecommunications services for its wholly owned Hellas-Sat fleet operator of Greece. The Inmarsat payload uses S-band to provide mobile communications in Europe as part of a satellite-terrestrial broadband network, which is a new business line for Inmarsat.

Inmarsat’s launch contract is for a rocket that has not even yet been tested once, which tells us something about the faith they have in SpaceX. While I would be shocked if they didn’t have an option to pull out should there be significant delays or problems in launching Falcon Heavy, that they are willing to commit to it now is a convincing endorsement of SpaceX.

A streamlined Arianespace to build Ariane 6?

The competition heats up: The merged Airbus/Safran rocket division has surprised the European Space Agency with a proposed new design for Ariane 6.

The Airbus-Safran proposal, if carried to its logical end, would mean a single company building Ariane vehicles, with fewer subcontractors and much less government oversight. It would likely mean the end of the CNES launcher division as industry takes more control of Ariane design and operations.

In other words, the contractors who build the rockets for ESA want more power over that construction. They want less government oversight, and more ownership of the rocket they build.

Sounds like what’s happening in the U.S., doesn’t it? Giving ownership to the rocket builders means they not only have more flexibility and thus can be more efficient, it makes it easier for them to innovate in both construction and sales.

Another launch success for India

The competition heats up: Using its Polar Satellite Launch Vehicle rocket (PSLV) India successfully launched a French Earth-observation satellite on Monday.

The PSLV continues to be a very reliable commercial rocket for India’s government. That this launch was also witnessed by India’s new prime minister Narendri Modi — who also endorsed his country’s space effort in a public tweet — suggests that India’s space effort has a very bright future.

Update on the LDSD partly successful test flight

Another eleven news stories were published today on the LDSD test flight (go here to find them all), but only two gave an honest and informative appraisal of the parachute failure and the program’s future. This CBS report clarified the results well with these two quotes:

The Low-Density Supersonic Decelerator then fell toward impact in the Pacific Ocean northwest of Hawaii. The carrier balloon apparently came apart after the LDSD’s release and it was not immediately clear what recovery crews standing by in the landing zone might be able to retrieve.

and this:

Two more LDSD vehicles are being built for “flights of record” next summer.

Another report from Space Insider also provided this key information, something I would have expected every journalist in the world to have considered essential to their report.

Sadly, not one of the other news stories saw fit to mention that the test vehicle might have been destroyed because of the failure of the chute, nor did any of them bother to report that two more such test vehicles are under construction, allowing program to continue anyway.

That so many news stories were published on this test flight indicates the interest that exists in it. Too bad most reporters writing these stories were only interested in providing us propaganda and pro-NASA cheer-leading.

First test flight of Angara is officially postponed

It’s official: The first flight of Angara has been postponed for at least a week or more.

“The rocket will be removed from the launchpad and transferred to a technical stand for comprehensive analysis,” RIA quoted the Khrunichev center as saying, adding the new launch time would only be decided after the checks.

Though no information was released that describes the cause of the scrub, that they are going to give the rocket a major look-over suggests that at least one of the problems reported by Anthony Zak at Russianspaceweb are likely true. To quote him again:

According to a veteran of Baikonur Cosmodrome and the Russian space historian Vladimir Antipov, the scrub at that moment could indicate a failure in the pneumatic and hydraulic system activating the rocket’s propulsion system. A screenshot of the launch countdown clock, which had surfaced on the Internet, indicated a scrub at T-1 minute 19.7 seconds. It then transpired that the loss of pressure in a flexible gas line of the propulsion system caused the delay.

It could take as long as a week to fix the problem, industry sources said on the Novosti Kosmonavtiki web forum. GKNPTs Khrunichev, the Angara’s manufacturer then posted a one-line press-release saying that the date of the next launch attempt would be announced later.

According to other sources, a valve on the oxidizer line failed, which could require to return the rocket to the assembly building, to cut out the device and weld in the new valve. Due to a built-in nature of the valve, the return of the rocket to the manufacturing plant in Moscow could also be required, likely postponing the mission for weeks.

A flawed first flight for NASA’s saucer for testing Mars landing techniques.

NASA’s Low-Density Supersonic Decelerator (LDSD), the saucer shaped system for testing new landing techniques on Mars, did its first flight today with mixed results.

A saucer-shaped NASA vehicle testing new technology for Mars landings rocketed high over the Pacific on Saturday and deployed a novel inflatable braking system, but its massive parachute failed to fully unfurl as it descended to a splashdown. Control room cheers that greeted successful steps in the complex test rapidly died as the parachute appeared to emerge tangled. “Please inform the recovery director we have bad chute,” a mission official ordered.

I have found two other stories on this test flight, one from nasaspaceflight and the second from reuters. Both the Huffington Post story above and these two fail entirely to tell us whether the test vehicle was damaged when its parachute failed to open and it hit the water. Worse, all three articles seem to ignore this significant detail in describing enthusiastically NASA’s future plans for the LDSD.

As a reader, I instead think: NASA’s future plans are not the story now. The story is whether this program can even continue.

An contract extension from NASA for SpaceX and Sierra Nevada

NASA has given SpaceX and Sierra Nevada six additional months, until March 2015, to complete their last contractual milestones for building their manned spacecraft.

An amendment signed by William Gerstenmaier, NASA’s associate administrator for human exploration and operations, on May 16 gives SpaceX until March 31, 2015, to complete the 14th and final milestone under its $440 million CCiCap agreement — a pad abort test of its Dragon capsule. The test originally was planned for April 2014.

On May 19, Gerstenmaier signed a similar amendment to Sierra Nevada’s $212.5 million CCiCap award to extend work associated with flight tests of the company’s Dream Chaser engineering test article until March 31, 2015.

NASA’s third Commercial Crew partner, Boeing, is on track to complete all its milestones, worth a combined $460 million, by the end of August,

The significance of this extension is that it reveals something about the dates for both SpaceX and Sierra Nevada’s next flight tests. The previously date for the pad abort test for Dragon had most recently been set for this summer. They are obviously not meeting that schedule and need more time. Sierra Nevada meanwhile wants to fly its Dream Chaser test vehicle some more, but apparently needs time to get it flight ready after it sustained damage during landing on its one and only flight test.

In addition, this extension suggests something about NASA’s assessment of the efforts of all three companies. The agency is supposed to down select to two companies by the end of the summer. The extension suggests that they are hoping to keep all three companies funded so that they all build their spacecraft.

1 419 420 421 422 423 520