New smallsat rocket company obtains financing

The competition heats up: A new rocket company, Vector Space Systems, has announced that it has obtained seed money to begin the development of a new rocket for launch very small satellites.

Vector is designed to provide dedicated launches of very small spacecraft. The vehicle is capable of placing satellites weighing up to 45 kilograms into a basic low Earth orbit, and 25 kilograms into a standard sun synchronous orbit. Those launches will cost $2–3 million each, with the higher price reserved for “first class” launches reserved as little as three months in advance.

This rocket would compete with Virgin Galactic’s LauncherOne and Rocket Lab’s Electron for the smallsat and cubesat business.

Congress micro-manages rocket engineering again

In an effort to funnel money to Aerojet Rocketdyne at the cost of every other rocket company in the nation, the House Armed Services Committee has written a bill that tells the Air Force exactly how it will build its future rockets.

“The Committee shares the concern of many members that reliance on Russian-designed rocket engines is no longer acceptable,” the committee said April 25. “The Chairman’s Proposal, as recommended by Chairman Rogers of the Subcommittee on Strategic Forces, denies the Air Force’s request to pursue the development, at taxpayer expense, of new commercial launch systems. It instead focuses on the development of a new American engine to replace the Russian RD-180 by 2019 to protect assured access to space and to end reliance on Russian engines. The Mark also holds the Air Force accountable for its awards of rocket propulsion contracts that violated the FY15 and FY16 NDAAs.”

…“The funds would not be authorized to be obligated or expended to develop or procure a launch vehicle, an upper stage, a strap-on motor, or related infrastructure,” says a draft of the 2017 defense authorization bill.

As presently written, the bill would leave the Air Force only one option: use engines built by Aerojet Rocketdyne.

If anything demonstrates the corruption or foolishness of our elected officials, it is this proposal. Not only are they telling the Air Force how to design rockets, they are limiting the options so much that they are guaranteeing that it will either cost us more than we can afford, or it won’t be doable at all. As I say, either they are corrupt (working to benefit Aerojet Rocketdyne in exchange for money), or they are foolish, (preventing the Air Force from exploring as many inexpensive future options as possible).

First Long March 5 begins assembly

The competition heats up: China has begun assembly of its first Long March 5 rocket, set for launch in September.

Yang Hujun, vice chief engineer, has spoken about the next steps for the Long March-5 project. “After the assembly is finished in the first half of this year, it will take a little more than a month to test it to ensure that the product is in good shape. The first launch will be made after it is out of the plant in the latter half of the year. “

The rocket will be able to put about 25 tons into orbit, making it one of the most powerful rockets in the world. They plan to use it on its first launch to put their next space station into orbit.

Problems at Stratolaunch?

In the heat of competition: Vulcan Aerospace, the company building the giant Stratolaunch airplane designed launch orbital rockets from its underbelly, does not yet have a rocket for this purpose.

Originally that rocket was to be built by SpaceX, but that partnership ended in 2012.

Stratolaunch then contracted out its rocket work to Orbital Sciences Corp. (now Orbital ATK). The company also contracted with Aerojet Rocketdyne for six RL10C-1 rocket engines with an option for six more for use in the launch vehicle’s third stage.

The agreement with Orbital ended without the production of a launch vehicle, with Beames saying the rocket was not economical. Stratolaunch officials said they were reassessing the project in light of the shift in the market recently toward smaller satellites.

In 2015, Beames said that Stratolaunch was examining more than 70 launch vehicles for use with the Stratolaunch aircraft. He indicated that the company might use multiple launch vehicles to serve different payload classes. Beames said the company would announce its launch vehicle strategy in fall 2015, but that time came and went with no announcement. [emphasis mine]

It is very worrisome for them to be hunting for a rocket at this point of design. I am reminded of Virgin Galactic and SpaceShipTwo, which changed engine designs midstream, causing them enormous engineering problems and delays.

New images of failed Beagle 2 on Mars

By carefully improving the resolution of images taken by Mars Reconnaissance Orbiter of the landing site of the 2003 European Mars lander Beagle 2, scientists think the lander might have successfully landed but failed to deploy its solar shields completely.

Showing a bright blip in dusty terrain, the new picture is four times the resolution of previous images. The image adds weight to the theory that the diminutive spacecraft – just under a metre in diameter – landed as planned on Mars in 2003, but failed to fully unfurl its solar panels. “Given the size of Beagle 2, even with super-resolution images you are not likely to see more than a series of blobs because it is so small,” said Mark Sims, of the University of Leicester and former mission manager for Beagle 2. “What it does show is that it is on the surface and it is at least partially deployed.”

The technique they have developed for improving image resolution will also be useful to tease out new details about the Martian surface.

Soyuz rocket launch scrubbed due to faulty IMU

Uh-oh: A Soyuz rocket launch from French Guiana was scrubbed an hour before launch on Sunday because of detected problems with the inertial measurement unit (IMU) in its navigational system.

Arianespace chief executive Stephane Israel tweeted Sunday that the faulty inertial measurement unit, or IMU, will be replaced overnight in time for a launch attempt Monday. The IMU is located on the Soyuz rocket’s third stage and is used to determine the heading and orientation of the vehicle in the first nine minutes of its mission, feeding critical attitude data to the launcher’s guidance computers, which transmit steering commands to the engines.

The venerable Soyuz booster flies more often than any other launcher in the world, and delays due to technical causes are rare. [emphasis mine]

This is not good news for Russia’s aerospace industry, as it suggests that the quality control problems Russia has experienced with the company that manufactures its Proton rocket are now beginning to appear with the different company that manufactures the Soyuz rocket.

If true, this is also very bad news for American astronauts, who must use this rocket to get to and from space.

Avoiding the period in space

New research has outlined the techniques available to female astronauts to prevent menstruation in space.

Rather than researching the consequences of women having a period in space, the researchers are recommending that women avoid them completely, something that appears to have been the policy of NASA on ISS. This is a big mistake. The whole point of having a space station is to find out the consequences to the human body imposed by weightlessness. Future space explorers will need to reproduce. We need to know now if that will be possible.

China to launch full space station in 2018

The competition heats up: China has announced that it will launch the first module of its full space station, named Tianhe-1, in 2018.

The article also gives an short summary of China’s space plans in 2016:

2016 will also be a busy and crucial year for China. Assembly of its second space lab, Tiangong-2, has been completed and the space station prototype will launch in September. This is set to be followed a month later by the Shenzhou-11 crewed mission with two Chinese astronauts. It will also debut new launch vehicles, the Long March 5 and 7, which will greatly increase the country’s launch capabilities.

Long March 5 is capable of putting 25 tons in orbit, making it comparable to Boeing’s Delta 4 Heavy, the most powerful rocket presently operational.

Evidence of water on Ceres?

water on Ceres?

New data from Dawn suggests that there is significant water locked in surface of Ceres’s north polar regions.

These data reflect the concentration of hydrogen in the upper yard (or meter) of regolith, the loose surface material on Ceres. The color information is based on the number of neutrons detected per second by GRaND. Counts decrease with increasing hydrogen concentration. The color scale of the map is from blue (lowest neutron count) to red (highest neutron count). Lower neutron counts near the pole suggest the presence of water ice within about a yard (meter) of the surface at high latitudes.

Note that the data has not detected water. The blue areas on the image to the right suggest an increased amount of hydrogen, which could only be held to the surface if it was locked in some molecule, with water being the most likely candidate. Like the Moon, until we actual capture some samples, it will be difficult to confirm with certainty the presence of water.

Orbital ATK negotiating lease for part of VAB

The competition heats up: Orbital ATK has begun negotiations with NASA for possibly leasing part of the Vehicle Assembly Building (VAB) for use in connection with a military rocket.

Virginia-based Orbital ATK is one of two rocket companies that launch resupply missions to the International Space Station, but this deal would not involve those missions or that rocket, the company’s Antares. The Antares launches from NASA’s space port at Wallops Island, Va., carrying the Orbital ATK Cygnus capsule.

The new rocket that Orbital ATK hopes to develop and one day assemble in the VAB would be a medium- to heavy-lift rocket.The planned rocket currently referred to by the name the Air Force set for it, the Evolved Expendable Launch Vehicle-class rocket.

It sounds like Orbital ATK is putting together a bid to compete for the Air Force rocket contract, and needs to get a handle on the costs for using the VAB at Kennedy in order to make the offer credible.

China grows mouse embryos in space

During a two week unmanned biology satellite mission, Chinese scientists successfully demonstrated that mouse embryos can develop in weightlessness.

The team developed an embryo culture system and placed it within a small enclosed chamber [on the spacecraft] that provides the ideal conditions for the embryos to develop in space. While the chamber was in orbit, a camera attached to the experiment took photographs of the embryos as they developed in microgravity, and sent these images back to Earth. With the aid of their imaging technology, the researchers were able to observe how the mammalian two-cell stage embryos developed into blastocysts under microgravity after four days. Blastocysts are structures formed in the very early development of mammals. In humans blastocysts begin to form five days after fertilization.

The researchers will now compare their space-developed embryos to those cultured in normal laboratory environments on Earth to see what differences there are between the two at both a cellular and molecular level.

None of this proves that life can be conceived and grow in weightlessness. It does however suggest that it might be possible.

50 year old time capsule in Houston reveals space artifacts

In opening a time capsule from 1966 at a Houston library, workers discovered a flag flown in space by Pete Conrad on Gemini 5, and a model of the Gemini capsule and Titan rocket that launched it.

The capsule unfortunately had gotten water-logged, so that many of the paper items inside were damaged.

I must admit it seems strange to me to open a time capsule when people are still alive (like myself) from the time the capsule was sealed, as the basic purpose of the capsule should be to pass information on to future generations, long after its builders are gone.

Liver damage from weightlessness?

The uncertainty of science: Mice flown for almost two weeks on the last space shuttle mission in 2011 have shown evidence of the early symptoms of liver disease.

The mice spent time orbiting the Earth on the final space shuttle flight in 2011. Once they returned home, teams of scientists were allowed to share and study their internal organs.

Jonscher’s team found that spaceflight resulted in increased fat storage in the liver, comparing pair-fed mice on Earth to those on the shuttle. This was accompanied by a loss of retinol, an animal form of Vitamin A, and changes to levels of genes responsible for breaking down fats. As a result, mice showed signs of nonalcoholic fatty liver disease (NAFLD) and potential early indicators for the beginnings of fibrosis, which can be one of the more progressive consequences of NAFLD. “It generally takes a long time, months to years, to induce fibrosis in mice, even when eating an unhealthy diet,” Jonscher said. “If a mouse is showing nascent signs of fibrosis without a change in diet after 13 ½ days, what is happening to the humans?”

This result doesn’t prove that weightlessness causes liver damage. It only suggests that more research is needed, though the data from six month to year long missions suggest that the liver harm to humans is either non-existent or temporary.

Largest jet engine ever test fired

The competition heats up: General Electric has completed the first test firing of the largest airplane jet engine ever built.

With a front fan spreading a full 11 ft (3.35 m), the GE9X is a world record holder and generates thrust in the order of 100,000 lb. To accommodate the aeronautical behemoth, the Peebles facility was recently upgraded with a larger air intake, extra fuel tanks to feed the giant engine, and high temperature gear to deal with the hotter, more efficient design.

GE says that the GE9X is currently undergoing its first Full Engine To Test (FETT). This is the next level of the test series, which began in 2011 at the component level, and marks the first test of the complete system, which comes only six months after the engine design was finalized. GE says that this relatively early testing was to ensure that the test data was available as soon as possible for the certification engines, which are scheduled to be installed in GE Aviation’s flying test bed for certification of flight testing in 2018.

OneWeb satellite factory coming to Florida

The competition heats up: OneWeb officially announces its plan to build its satellite factory in Florida.

OneWeb Satellites LLC prepares to break ground on its new estimated $85 million high volume satellite manufacturing factory in Exploration Park, Florida. Announced during a ceremony with Florida Governor Rick Scott and OneWeb founder Greg Wyler, the factory near NASA’s Kennedy Space Center is set to open in 2017, with delivery of initial satellites later that year or early the next. OneWeb Satellites is a joint venture between OneWeb, a satellite based internet provider, and Airbus Defence and Space, the world’s second largest space company.

I think this news report of the press conference notes the most important aspect of this satellite factory, its assembly-line approach:

Typically, communications satellites take four to five months to assemble, Brian Holz, chief executive of OneWeb Satellites, a joint venture of OneWeb and Europe’s Airbus Group’s Defense and Space said during an event near the future location of the factory. “We’re going to build one in an eight-hour shift,” he said. He did not give details but said the factory would be highly automated.

If all goes right, they should begin launch satellites in large numbers within two years, which will mean a lot of additional launch business for the smallsat rocket industry.

Video of recovered Falcon 9 first stage on the road

The competition heats up: SpaceX’s recovered Falcon 9 first stage was moved by road back to the company’s testing facility in Florida yesterday, a journey that was recorded by bystanders, including people in a Kennedy Space Center tour bus.

I have embedded the longest video below the fold, because it provides the best closeup view of the booster. Look especially at the booster’s top, where you can see practically no damage. This thing looks ready to fly.
» Read more

Problems with attitude system doomed Hitomi

A series of failures in the attitude system on Japan’s X-ray space telescope Hitomi led to its destruction.

The problem started when the satellite’s inertial reference unit detected Hitomi was rotating around its Z-axis at 21.7 degrees per hour. The spacecraft was actually stable at the time, mission managers from the Japan Aerospace Exploration Agency said Friday. The satellite’s attitude control system commanded Hitomi’s reaction wheels, rapidly-spinning devices which control the pointing of the spacecraft with momentum, to counteract the spin. The action caused the satellite to rotate in the opposite direction as the faulty inertial reference unit indicated, officials said. Momentum accumulated inside the reaction wheel system, and magnetic torquers aboard the satellite were unable to unload the building momentum, which neared the reaction wheels’ design limit.

Hitomi’s computers recognized the dangerous situation and put the satellite into safe hold a few hours later. The satellite tried to stabilize using the craft’s hydrazine-fueled rocket thrusters to aim its solar panels toward the sun. But the trouble was not over, and the spacecraft’s solar sensor was unable to find the sun. Struggling to correct the growing spin rate, small rocket firings inadvertently caused Hitomi to rotate faster due to a bad setting in the thruster system, JAXA officials said.

The commerical battle over U.S. surplus ICBM’s

Link here. The article provides a good summary of the conflict between Orbital ATK and Virgin Galactic over the Defense Department’s possible sale of surplus ICBM’s for commercial use.

While Orbital has been lobbying to get Congress to lift the ban on the Pentagon selling its surplus rockets to the private sector, Virgin Galactic has been harnessing the industry lobbying arm to convince Congress to keep the ban. They fear that if the missiles become available, their as yet unflown LauncherOne will not be able to compete.

I find it very revealing that Virgin Galactic wants to use regulation to hinder their competitors. To me, this is another sign that they are not very competitive or competent in actual rocket building. Rather than build and launch their rocket at a competitive price, they want to stifle an opportunity to lower launch costs.

A hearing on this issue is taking place today. Stay tuned.

Pakistan pulls out of India satellite project

This op-ed provides a revealing outline of how the political tensions in Islamic Pakistan have damaged efforts by India to work together on a satellite project.

In 2014, Prime Minister Narendra Modi had announced India’s decision to develop (and gift) a satellite to benefit all SAARC member countries [South Asian Association for Regional Cooperation] in different fields like weather data exchanges, disaster management, telecommunication and tele-medicine. The work on this satellite has already begun at the Indian Space research Organisation (ISRO), and the satellite is expected to be launched by the end of 2016. After remaining indecisive about this project for long, Pakistan has finally decided to opt out of the SAARC satellite project. Now, India would launch this satellite not as a satellite for SAARC, but as a South Asia satellite.

Pakistan’s decision may not be totally surprising given the current chill in the India-Pakistan relationship. The initial discussions on this project were progressing in a constructive fashion with Pakistan. However, Pakistan subsequently made a technical and financial help offer to India for the construction of the satellite. This was not accepted by India, which could be one of the main reasons for Pakistan opting out of this project. Obviously, Pakistan has missed an opportunity to develop ‘orbital cooperation’ with India in spite of having ‘terrestrial confrontation’.

The article, describing other cooperative efforts by India, including working with Russia and China to link the GPS systems of the three countries. once again indicates to me that India as a country is successfully becoming a first world nation.

An update on Philae

Link here. No big news. The lander remains silent, and has not yet been precisely located on the surface, though they have a pretty good idea where it is. They expect to get images of it on the surface sometime before September, when Rosetta’s mission will end with its own attempted touchdown on Comet 67P/C-G.

An update on SpaceX’s recovered first stage

Link here. The story not only gives a detailed description of the prep work done to get the stage, dubbed CRS-8 S1, ready for transportation to the test facility where it will undergo static fire tests, it also gives an update on the status of SpaceX’s upcoming launches. This one sentence sums it up:

The frequency of SpaceX launches is expected to pick up the pace in June with up to three launches planned, potentially including the historic reuse of the CRS-8 S1.

If SpaceX can get three rockets off the ground in one month, a first for the company, they will help ease their launch backlog while also demonstrating that they can launch at a fast and reliable rate.

OneWeb to set up operations in Florida

The competition heats up: The head of OneWeb confirmed today that his company is going to establish its base of operations in Florida.

The founder of OneWeb, Greg Wyler, confirmed to the Orlando Sentinel that his company is moving to Kennedy Space Center. Wyler plans to announce more details Tuesday morning in a news conference with Gov. Rick Scott, who will explain $20 million in state incentive dollars for the company. “It’s pretty exciting to see that Florida will be the base for a new satellite network that will extend high-speed access to 54 percent of the globe,” Wyler said in a phone interview.

OneWeb already has $500 million in funding to launch the new satellites, designed to boost internet access globally. It also has contracts with Virgin Galactic and French company Arianespace for launches. The company plans to hire at least 250 people.

The important part of this story for Florida is that OneWeb will be building its satellites there. Whether any are ever launched from Florida will depend on Virgin Galactic ever getting off the ground. Otherwise, most of these satellites will launch from French Guiana.

Privately-built inflatable module installed on ISS

The competition heats up: Bigelow Aerospace’s BEAM inflatable module, built in only three years for a mere $17 million, was installed on ISS this past weekend.

BEAM will allow Bigelow and NASA to demonstrate the capabilities of the inflatable habitat on ISS. It is expected to perform for at least two years of testing on the Station, providing a key shake out of the technology that is likely to play a major role in human deep space exploration. “(BEAM) will be a great way to test out the thermal characteristics of this new type of module, along with its radiation protection,” added Kopra. “It’s going to be a neat thing.”

Following its test period, the SSRMS will remove the module from the Station before releasing it Nadir (Earth-facing). The module will eventually re-enter around a year later.

The history of Falcon 9’s recoverable first stage

This is a beautiful short supercut of the history of SpaceX’s effort to develop a recoverable first stage. Hat tip Rand Simberg.

The video notes that it took less four years, from the first flight of Grasshopper to the first successful landing by a Falcon 9 first stage. This is the kind of pace I remember as a child in the America I grew up in. New ideas were fast and continuous, and things moved. I pray we are heading for a new renaissance where things will move again.

1 350 351 352 353 354 482