ISS: Breaking up is hard to do

According to this detailed article by Eric Berger at Ars Technica, it will be be very difficult if not impossible for Russia to detach its half from ISS and go its own way.

The article outlines both the technical and legal reasons, and concludes as follows:

In reality, during the coming years, we are more likely to see food riots in Moscow than we are to see a new Russian Space Station or a deep space scientific exploration mission. Some of this will be due to financial concerns, and some of it will come because of a loss of access to technology from the West.

Already, Russia’s main builder of tanks, Uralvagonzavod, appears to have stopped production due to a lack of components. Roscosmos’s big four companies—RKK Energia, RSC Progress, the Khrunichev Center, and NPO Energomash—will likely not be able to keep up production for long for the same reason as the tank factory.

While everything Berger notes is true, I think he underestimates the willingness of rogue nations, as Russia presently is, to break treaties. Also, the agreements Russia has signed expire in 2024, and Russia needs the next few years to launch more modules to have any chance of making its half workable. Whether it can do it is presently doubtful, but not impossible.

This partnership is ending, whether by choice or reality. Expect Russia’s participation in ISS to continually wind down over the next few years.

2 comments

Startup rocket company begins delivering engines

Capitalism in space: The startup rocket company, Ursa Major, announced today that it has completed qualification tests of its new Hadley rocket engine and has begun delivering flight worthy engines to two different companies.

Startup Ursa Major announced Wednesday that it had completed qualification of its Hadley rocket engine for use by both a space launch vehicle and a hypersonic launch system. The Colorado-based company said it has already started delivering flight-ready Hadley engines to two customers, Phantom Space and Stratolaunch, and plans to produce a total of 30 engines this year.

The engine is relatively small compared to most rocket engines. Phantom will use seven in the first stage of its smallsat Daytona rocket, designed to launch cubesats into orbit. What Stratolaunch will use the engine for is unclear.

1 comment

Blue Origin’s engine division manager leaves company; first BE-4 engines arriving in May

Capitalism in space: The head of Blue Origin’s rocket engine division has decided to leave the company, even as it was revealed that the first flight worthy BE-4 engines will not be delivered to ULA until May at the earliest.

According to company sources, the first two BE-4 flight engines are in final production at Blue Origin’s factory in Kent, Washington. The first of these engines is scheduled to be shipped to a test site in May for “acceptance testing” to ensure its flight readiness. A second should follow in reasonably short order. On this schedule, Blue Origin could conceivably deliver both flight engines to United Launch Alliance in June or July. Sources at Blue Origin and United Launch Alliance say development versions of the BE-4—which are nearly identical to the flight versions—have been performing well in tests.

Upon receiving the engines, United Launch Alliance plans to install two of the BE-4s on the Vulcan rocket for a debut launch as soon as possible. While at the Satellite 2022 conference in the District of Columbia, United Launch Alliance CEO Tory Bruno on Tuesday said he still anticipates that Vulcan’s debut launch will occur in 2022. However, a summertime delivery would be a very tight schedule for United Launch Alliance.

ULA was initially promised these engines more than three years ago. The delay not only put its Vulcan rocket three years behind schedule, it has delayed the development of Blue Origin’s own orbital rocket, New Glenn, by more than three years as well.

To supply the needed engines for both rockets Blue Origin will need to establish a production line that can churn them out at a much faster pace than indicated so far. Whether it can remains an unknown, with the exit now of the head of the company’s engine division making that unknown even more worrisome.

11 comments

Firefly raises $75 million, targets May for next launch attempt

Capitalism in space: In announcing that the company has raised $75 million more in private investment capital, Firefly officials also said that it is now targeted May for its next launch attempt of its Alpha rocket.

The launch was partly delayed because of the federal government’s insistence that a Ukrainian businessman, who had saved the company when it went into bankruptcy, divest his ownership. That has now happened, so Firefly has gotten approval to launch.

Firefly CEO Tom Markusic told CNBC that the company “worked methodically and cooperatively with the government” to both complete the divestment, as well as to add “security protocols” at the company.

With the move complete, Markusic said the company now has “full access to our facilities to go back and launch.” Firefly will next transport its second Alpha rocket from its headquarters near Austin, Texas, to California, and aims to launch as soon as it can.

“We think it’ll take us about eight weeks from here to launch — so in May is our target,” Markusic told CNBC.

The company is also aiming to complete its second test launch two months after the first, assuming all goes well.

0 comments

SpaceX switches to newer Starship and Superheavy for orbital test

Capitalism in space: According to Elon Musk, SpaceX has decided that the company will no longer use Starship prototype #20 and Superheavy prototype #4 for the rocket’s first orbital test flight.

Instead, the company will fly two more recently built and upgraded prototypes, rumored to be numbers #24 for Starship and #7 for Superheavy. The company has also decided to switch from the first generation Raptor engines to Raptor-2s.

All these changes likely explain Musk’s announcement that the first orbital launch will not happen sooner than May. The changes also further suggest that SpaceX has realized federal permission to launch from Boca Chica will be further delayed, and thus it might has well push forward in other ways as it waits for the right to launch.

I suspect that if the federal government hadn’t moved in to block operations, it would have flown prototypes 20 and 4 two months ago, just to get some data. Now such a flight seems pointless, as more advanced prototypes are now almost ready to fly.

This decision also reinforces my prediction that no orbital flights will occur out of Boca Chica before summer, and are more likely blocked through November. It also increases my expectation that the first orbital flight might not occur at all in Texas. The longer the Biden administration delays SpaceX’s operations there, the greater the chance the entire Starship/Superheavy launch program will shift to Florida.

6 comments

Local state legislators introduce bill to disband Camden spaceport authority

Two Georgia state legislators yesterday introduced a bill to disband the Camden spaceport authority, following a county special election that rejected the spaceport by a vote of 72% to 28%.

Whether the bill becomes law or not will likely not make much difference to the spaceport. It is dead, and the law will merely decide whether it dies quickly, or slowly.

This quote by one of the legislators who introduced the bill, however, should be carved in stone in every statehouse and in the Capitol in Washington:

“It’s hard to ignore how the people vote.”

Too many lawmakers nationwide have forgotten this fact.

0 comments

Starlink raises its prices

Capitalism in space: Starlink has now unveiled newer higher prices for getting its internet service, even for those who had previously put down a deposit for the service.

Originally, opting into Starlink required a $499 upfront purchase of a starter kit with all the necessary supplies, including a user terminal, or antenna, for connecting with SpaceX’s satellites. Customers would then pay a $99 monthly charge to keep the service running. Now, the new monthly price going forward will be $110. All new orders of the Starlink kit will now cost $599, and anyone who put down a deposit for the original $499 kit will have to pay $549 instead. The new monthly prices will come into effect at different times for different customers.

The price increase either indicates the lack of competition existing for those who want good internet service in the regions Starlink presently serves, or it suggests the cost of launching the system is higher than Starlink first anticipated. Either way, the higher cost gives an opportunity to others.

3 comments

Today’s blacklisted American: Emmett Till opera canceled because lyrics were written by a white

Emmett Till, censored by anti-white bigots
Emmett Till, a black murder victim banned again for associating
with whites.

The new dark age of silencing: More than 12,000 students at the City University of New York (CUNY) have signed a petition to have an opera about the lynching of 14-year-old Emmett Till cancelled because its lyricist, Clare Coss, happens to be white.

John Jay College of Criminal Justice student Mya Bishop created the Change.org petition in an attempt to halt the continuation of ‘Emmett Till, A New American Opera’ at the school’s Gerald W. Lynch Theatre. In the petition’s description, she wrote that the show is all about playwright Clare Coss’ ‘white guilt’ rather than the appalling killing of Till, 14, for allegedly flirting with a white woman.

This petition is unmitigated bigotry, trying to get the opera cancelled simply because Coss is white. What makes it even more indicative of our new dark age of ignorance is that the composer, Mary Watkins, is black. As she notes:
» Read more

12 comments

The unbelievably rough and wind-swept surface of Mars’ Greenheugh pediment

Gator-back terrain on Mars
Click for full image.

Since my last update on the travels of the Mars rover Curiosity on February 22, 2022, the rover has been been creeping ever so slowly westward across a plateau that scientists have dubbed the Greenheugh pediment.

Scientists have known for years that the surface of the pediment was going to be rough going. This panorama taken by Curiosity when it first climbed up to the pediment in March 2020 to take a peek before retreating revealed that roughness starkly.

In truth, since beginning its traverse of that pediment in February, the Curiosity team has found the ground not only as rough as expected, but beautiful in a strange sort of way, as illustrated by the March 20, 2022 photo to the right, reduced to post here. As Lauren Edgar, Planetary Geologist at USGS Astrogeology Science Center, noted yesterday in a Curiosity update that featured this image:
» Read more

4 comments

NASA: Europa Clipper’s cost rise; Mars sample return delayed

At a meeting this week NASA officials admitted that the cost of its Europa Clipper mission has risen by three quarters of a billion dollars, and that the sample return mission to bring back Perseverance’s core samples will be delayed, as well as now require two landers, not one.

NASA revealed significant changes to two of its flagship planetary science missions at today’s Space Science Week meeting at the National Academies of Sciences, Engineering and Medicine. The cost for Europa Clipper, which will gather data as it makes multiple swingbys of Jupiter’s moon Europa, has grown from $4.25 billion to $5 billion. Separately, NASA and ESA are replanning the Mars Sample Return mission. Two landers are needed instead of one to retrieve samples from the surface of Mars and boost them into orbit for their trip back to Earth. The launches will be in 2028 instead of 2026.

The sample return mission itself is also growing in complexity:

A Sample Fetch Rover will be sent to collect them and take them to a Mars Ascent Vehicle — a rocket — that will shoot them into Martian orbit where they will be transferred to an Earth Return Orbiter for the trip back to Earth.

Initially the plan was for the fetch rover and ascent vehicle to be launched together in 2026, and the Earth Return Orbiter in 2027. But Zurbuchen decided to convene an Independent Review Board in 2020 to get an impartial assessment of the plan by outside experts. The Board cautioned that 2026 was “not achieveable” with 2028 a more realistic date, and that the “program’s schedule and cost are not aligned with its scope.”

Consequently, NASA now has replanned the mission with two landers — one each for the fetch rover and ascent vehicle — instead of one. Both landers will launch in 2028. The Earth Return Orbiter will still launch in 2027. The samples will get back to Earth in 2033.

Prediction: The launch of this fleet of sample return spacecraft will be further delayed, and its overall cost will rise, by a lot. In fact, it is very possible that SpaceX’s Starship will have already returned samples from Mars before NASA’s mission gets off the ground.

1 comment

Scientists: Enceladus’ tiger stripes come from underground ocean

The uncertainty of science: Using a new computer model, scientists now think they have shown how on the Saturn moon Enceladus pressure from an underground ocean can push through cracks to produce geysers on the surface.

Rudolph and his colleagues ran a physics-based model to map the conditions that could allow the cracks from the surface to reach the ocean and cause the eruptions. The model accounts for cycles of warming and cooling that last on the scale of a hundred million years, associated with changes in Enceladus’ orbit around Saturn. During each cycle, the ice shell undergoes a period of thinning and a period of thickening. The thickening happens through freezing at the base of the ice shell, which grows downward like the ice on a lake, Rudolph said.

The pressure exerted by this downward-expanding ice on the ocean below is one possible mechanism researchers have proposed to explain Enceladus’ geysers. As the outer ice shell cools and thickens, pressure increases on the ocean underneath because ice has more volume than water. The increasing pressure also generates stress in the ice, which could become pathways for fluid to reach the surface 20-30 kilometers away.

You can read the paper here.

Be warned: This is only a model. Moreover, its conclusions suggest that this mechanism will not work on Jupiter’s moon Europa, which has many planet-wide crack-like features that suggest (as yet unconfirmed) a bubbling up from below.

0 comments
1 793 794 795 796 797 2,927