A more positive conservative take on the budget deal

Link here. I think Lambo nails it. The deal might not be ideal, but it is only the beginning, and was written when Republicans only control one house of Congress, and still pushes back at many Democratic-passed initiatives.

Next year that changes. If we do not see significant cuts in the budget from Republicans when they control both houses of Congress I will then join the many conservatives who justly distrust the Republican leadership and want their heads.

NIH panel recommends cancelling multi-billion dollar study

An government advisory panel has recommended the NIH cancel a controversial nationwide study to track the health of 100,000 children.

The study has already cost one billion, has had two scientists resign because they didn’t like how the study was being run, and has as yet only enrolled 4,000 children.

Update: The NIH officially cancelled the study later the same day the panel’s report was released.

Science spending steady in proposed Congressional budget

The proposed budget deal announced by Congress yesterday essentially leaves level the overall spending on science.

I have a spreadsheet where I track the budgets of the various science agencies in the federal government, and from this I can say that since the Republicans took control of the House in 2010 the funding has remained very steady. Despite the partisan screams from the left that Republicans are destroying science, all these science agencies have pretty much gotten stable funding in the past four years.

Nonetheless, much of this funding could be trimmed significantly, as there is enormous featherbedding and pork among these science agencies. That won’t have a chance of happening until next year, when the Republicans control both houses of Congress. Even then, Obama and much of the Republican leadership will oppose significant cuts, Obama because he wants to see increases and the Republican leadership because they wish to maintain the status quo.

The unending growth in these budgets, routine from the 1970s through the 2000s, has definitely ceased. I also expect the political pressure to cut these budgets to grow with time. The newer Republican members of Congress tend to be much more radical than their leadership, and are much more willing to slash budgets radically.

NSF accused of misuse of funds in giant ecological project

The National Science Foundation (NSF) and a contractor have been accused by both an audit and by Congress of a significant misuse of funds in a major ecological monitoring project costing almost a half a billion dollars.

With a construction budget of $433.7 million, NEON is planned to consist of 106 sites across the United States. Arrays of sensors at each site will monitor climate change and human impacts for 30 years, building an unprecedented continental-scale data set. Although some initially doubted its merits, the allure of big-data ecology eventually won over most scientists.

But a 2011 audit of the project’s proposed construction budget stalled three times when, according to the independent Defense Contract Audit Agency (DCAA), NEON’s accounting proved so poor that the review could not be completed. Eventually, DCAA issued an adverse ruling, concluding that nearly 36% of NEON’s budget proposal was questionable or undocumented.

When the NSF green-lit the project, the agency’s inspector-general ordered the audit released on 24 November, which found unallowable expenses including a $25,000 winter holiday party, $11,000 to provide coffee for employees, $3,000 for board-of-directors dinners that included alcohol, $3,000 for t-shirts and other clothes, $83,000 for “business development” and $112,000 for lobbying.

Republican members of Congress have since been attacking NSF for this lax management. And though the amount of funds apparently misused does not seem very large compared to the size of the entire contract, I am willing to bet that this audit only uncovered a tiny portion of the misuse. Based on the recent behavior of federal agencies, I would expect this to only be an indicator of much worst abuse that is still buried behind stone-walling.

A side note: Remember how only a few weeks ago the NSF head was claiming that a shortage of funds was the reason they were unable to cure ebola. What really happened was that they were too busy spending money having parties to do their job.

Launch abort system installed on Orion for December test flight

Engineers have installed a test version of the launch abort system (LAS) for the first test flight of the Orion capsule in December.

The LAS will not be active during the uncrewed EFT-1 mission, but during future missions it will be equipped to act within milliseconds to pull the spacecraft and its crew away from its rocket so that Orion could parachute safely back to Earth.  While the abort motors  are inert and not filled with solid fuel, the LAS will have an active jettison motor so that it can pull itself and the nose fairing away from the spacecraft shortly before Orion goes into orbit. The flight test will provide data on the abort system’s performance during Orion’s trip to space.

Based on what I know of the Orion/SLS launch schedule, I don’t think NASA ever intends to test it during a full launch of the SLS rocket. For one thing, the rocket is too expensive and NASA can’t afford to waste a launch just to test this one component. For another, the rocket’s development is too slow as it is, with the first launch not scheduled until 2018 and the first manned flight not until 2021, at the earliest. If they add a launch test of the abort system, NASA might not fly an SLS manned mission until late in the 2020s.

Meanwhile, NASA is sure insisting that SpaceX do such tests. And they will, since their capsule and rocket is affordable and quick to launch. What does that tell us about the two systems? Which would you buy if you were the paying customer?

Oh wait, you are the paying customer! Too bad you your managers in Congress don’t seem interested in managing your money very wisely.

Army can’t track spending on $4 billion system to track spending

Our government in action: An inspector general has found that the Army was unable to track the spending on a project designed to help the Army track spending.

As of this February, the Army had spent $725.7 million on the system, which is ultimately expected to cost about $4.3 billion. The problem, according to the IG, is that the Army has failed to comply with a variety of federal laws that require agencies to standardize reporting and prepare auditable financial statements. “This occurred because DOD and Army management did not have adequate controls, including procedures and annual reviews, in place to ensure GCSS-Army compliance with Treasury and DOD guidance,” the IG report concludes.

And some people wonder why I am always skeptical of giving the federal government any job you need done.

New York dumps NASA contract because of cost overruns.

New York Mayor de Blasio has fired a team of NASA consultants that had been hired by the previous mayor to lead the overhaul of the city’s 911 system after costs skyrocketed and the project fell far behind schedule.

Up to 20 NASA consultants had spent the past two years working on the project, at average annual salaries of $250,000. They’ve conducted technical designs for new radios and computer dispatch systems. That technology will eventually link police, FDNY and emergency medical system dispatchers and field units to the city’s main emergency call center in downtown Brooklyn, and to a still-unfinished backup call center in the Bronx.

City officials did not say they were dissatisfied with NASA’s performance. They simply believe the work can be done cheaper in-house.

Why does this sound familiar?

Current Congress sets record for fewest laws passed

Now this is a trend I like: The current Congress has passed the fewest laws in history.

The divided House and Senate have managed to pass just 163 laws that garnered President Obama’s signature since the two-year term began in January 2013. At this rate, Congress will have no problem beating the previous record set during the 2011-2013 session in which 284 laws were passed. That was down from 385 laws passed in the 2009-2011 session.

The less the better. And the legal areas that desperately need addressing are those areas, like Obamacare, that are best handled by repeal, not new laws.

Air Force requests info for new engine

Corporate welfare: The Air Force on Thursday issued a request for information from industry for the replacement of the Russian-made engines used by ULA’s Atlas 5 rocket.

Companies are being asked to respond by Sept. 19 to 35 questions. Among them: “What solution would you recommend to replace the capability currently provided by the RD-180 engine?” Air Force officials have told Congress they only have a broad idea of how to replace the RD-180. Estimates of the investment in money and time necessary to field an American-built alternative vary widely. Congress, meanwhile, is preparing bills that would fund a full-scale engine development program starting next year; the White House is advocating a more deliberate approach that begins with an examination of applicable technologies.

In the request for information, the Air Force says it is open to a variety of options including an RD-180 facsimile, a new design, and alternative configurations featuring multiple engines, and even a brand new rocket. The Air Force is also trying to decide on the best acquisition approach. Options include a traditional acquisition or a shared investment as part of a public-private partnership. [emphasis mine]

The Atlas 5 is built by Lockheed Martin. This is really their problem, not the Air Force or ULA. In addition, the Air Force has other options, both from Boeing’s Delta rocket family as well as SpaceX’s Falcon 9 rocket. For the government to fund this new engine is nothing more than corporate welfare, at a time when the federal government is swimming in debt and is essentially bankrupt.

IRS lets contractors rummage through taxpayer data

Does this make you feel secure? An inspector general report found that the IRS allowed contractors access to personal taxpayer information without doing the required background checks required by IRS policy.

Contractors who have access to sensitive information, which also includes employee and law enforcement data, must undergo a background check if they’re with the IRS for more than six months.

But the inspector general’s audit found five contracts where contractors had not had any background checks out of the 28 total contracts reviewed. In one of those cases, a contractor working on printing and mailing tax forms was given a disk containing 1.4 million taxpayer names, Social Security numbers and other personal information. A separate contract, for couriers, had given a daily route to an ex-convict who served more than 20 years for arson, the report added. In another 12 cases, IRS staffers had started background checks for contractors, but contractors were allowed to start working before those investigations had concluded.

NASA headquarters staff votes to unionize.

NASA’s bureaucracy marches on: The staff at NASA headquarters today voted to unionize.

“This successful vote will allow us to work with management to improve working conditions for NASA support and administrative staff here at NASA headquarters, thereby improving operations, saving money, and retaining an engaged and professional workforce,” said Tifarah Thomas, a program specialist within NASA’s Office of the Chief Health & Medical Officer. Professional support specialists at NASA headquarters include budget analysts, policy analysts, administrative specialists, secretaries, and others.

NHPA currently represents nearly 200 engineers and scientists at NASA in Washington. The combined unit, including the professional support specialists who voted today for IFPTE representation, will now represent more than 500 workers at the headquarters of America’s space agency. IFPTE also represents engineers and scientists at NASA labs and research facilities from coast-to-coast.

Anyone with the slightest objectivity knows that the working conditions for federal employees in Washington is glorious, with pay about double what everyone else in the country makes and benefits far exceeding even the best private packages. In addition, the hours are great and just slightly longer than what my generation would have called bankers’ hours. Moreover, if I can be blunt, these engineers are mostly paper pushers. They are not the one’s designing and building anything that might fly in space. Their only reason to unionize now is because they see a threat to their cushy jobs with the advent of private space and are organizing to secure their unneeded positions.

NASA admits that it is struggling to meet the 2017 launch date for SLS

Delays in the construction of Orion’s European-built service module as well as cracks in the spacecraft’s heat shield are threatening the planned 2017 launch date for Orion’s first test flight, unmanned, beyond Earth orbit.

Note that this program, costing anywhere from $10 to $20 billion, is only building a handful of capsules for flying three or four test flights. Beyond that, there is no money.

I have predicted this before, and I will predict it again: SLS will never take any humans anywhere. The cost is too high, the bureaucracy too complex, and the schedule is too slow. It will vanish when the new private companies begin flying humans into space in the next three years.

Orion first test flight scheduled

NASA has set December 4 for the first test flight of Orion.

In related news, the Navy has successfully completed a splashdown recovery test of Orion.

I haven’t labeled these stories “The competition heats up” because I have serous doubts Orion or SLS will survive the next Presidential election, even if this test flight on a Delta 4 Heavy rocket is a complete success. And if you want to know why, just read the first article above. It lists the long troubled ten-year long history of this capsule, with the following punchline describing the schedule for further launches with the actual SLS rocket:

While the first SLS/Orion mission, known as EM-1, is still officially manifested for December 15, 2017 – internally that date has all-but been ruled out. Internal schedules shows EM-1 launch date as September 30, 2018, followed by the Ascent Abort (AA-2) test – required for crew launches – on December 15, 2019, followed by EM-2 on December 31, 2020.

I find also find it interesting that in describing the many problems Orion has had in development, the article fails to mention the cracks that appeared in the capsule that required a major structural fix. Nor does the article mention the ungodly cost of this program, which easily exceeds $10 billion and is at least four times what NASA is spending for its entire program to get three different privately built spaceships built in the commercial program.

Free gym memberships for Homeland Security desk jockeys

It’s good work if you can get it: Homeland Security is spending almost a half a million dollars to provide free gym memberships to bureaucrats in Washington.

TSA also announced more gym memberships for its employees in Phoenix.

What this tells us is that the Washington elite still consider the federal budget a blank check designed to make their lives wonderful, even as the rest of the general public struggles to make ends meet and federal government and the general economy goes bankrupt.

An Amtrak train abandons all of its passengers

Government-run transportation: An Amtrak high-speed train left New York City this weekend without its passengers, who were instead waiting to board on a different platform where railroad employees had sent them.

“They literally sent us to the wrong platform, and the conductor took off without any passengers,” Damien Miano, a stranded passenger told The Daily News. “The right hand didn’t know what the left hand was doing. It’s just so bizarre.”

Amtrak might make believe that it is a private company, but it has been a government entity for decades. Like the post office, it has no real incentive to make a profit and operate efficiently since all losses get covered by the federal government.

Coming soon to a hospital near you!

CIA admits it hacked the Senate’s computers

These people should be fired, then imprisoned: The CIA today admitted that illegally hacked into the Senate’s computer system.

Oh wait, I have a better idea! Let’s put them in charge of our healthcare and patrolling the borders and our tax system and space exploration and climate research and any number of other important issues of the day in which we need honesty, ethics, reliability, and competence!

A Democrat speaks, and lies spew out

We never tried to impeach Bush, says Democratic lawmaker who co-sponsored Bush impeachment bill.

What really depresses me about this story is not that the Democrat lied so blatantly but that she did so because she knew that her supporters are so wedded to her and her party that they will accept what she says without question. She knows she can get away with it.

In related news: “Want to see what liberals are really like? Then read our uncensored hate mail from the last three weeks.”

Congress restores most VA bonuses

After the House voted 421-0 in June to eliminate all bonuses at the Veterans Administration in response to the scandals there, a compromise bill with the Senate has restored most of those bonuses.

The compromise bill announced Monday by the chairmen of the House and Senate Veterans’ Affairs Committees says VA bonuses will be capped at $360 million annually for the next ten years. But that cap is just 10 percent below the $400 million in bonuses the VA has distributed in recent fiscal years, and will allow up to $3.6 billion in bonuses to be awarded over the next decade.

“In each of fiscal years 2015 through 2024, the Secretary of Veterans Affairs shall ensure that the aggregate amount of awards and bonuses paid by the Secretary in a fiscal year… does not exceed $360,000,000,” the bill says. A description of the bill adds that members expect the VA to implement this cap in a way that does not “disproportionately impact lower-wage employees,” although the legislation itself does not include any restriction on how to award the money.

More evidence that our elected officials don’t represent us, but the employees of the government instead.

SLS needs more money!

Surprise, surprise! A GAO report finds that SLS is over budget and that NASA will need an additional $400 million to complete its first orbital launch in 2017.

NASA isn’t meeting its own requirements for matching cost and schedule resources with the congressional requirement to launch the first SLS in December 2017. NASA usually uses a calculation it calls the “joint cost and schedule confidence level” to decide the odds a program will come in on time and on budget. “NASA policy usually requires a 70 percent confidence level for a program to proceed with final design and fabrication,” the GAO report says, and the SLS is not at that level. The report adds that government programs that can’t match requirements to resources “are at increased risk of cost and schedule growth.”

In other words, the GAO says SLS is at risk of costing more than the current estimate of $12 billion to reach the first launch or taking longer to get there. Similar cost and schedule problems – although of a larger magnitude – led President Obama to cancel SLS’s predecessor rocket system called Constellation shortly after taking office. [emphasis mine]

I want to underline the current $12 billion estimate for the program’s cost to achieve one unmanned launch. That is four times what it is costing NASA to get SpaceX, Boeing, and Sierra Nevada to build their three spaceships, all scheduled for first manned launch before 2017. SLS not only can’t get off the ground before 2017, it can’t even get built for $12 billion.

If this isn’t the definition of a wasteful, boondoggle designed merely as pork, I don’t know what is. And what I do know is that there is no way SLS is going to ever get the United States back into space. It should be shut down, now.

Free paid vacations for House lawmakers

Who says they’re conservatives? The House Ethics committee, run by Republicans, has quietly eliminated the requirement that elected officials list any privately sponsored travel they receive in their annual financial-disclosure forms.

The move, made behind closed doors and without a public announcement by the House Ethics Committee, reverses more than three decades of precedent. Gifts of free travel to lawmakers have appeared on the yearly financial form dating back its creation in the late 1970s, after the Watergate scandal. National Journal uncovered the deleted disclosure requirement when analyzing the most recent batch of yearly filings. “This is such an obvious effort to avoid accountability,” said Melanie Sloan, executive director of the watchdog group Citizens for Responsibility and Ethics in Washington. “There’s no legitimate reason. There’s no good reason for it.”

Once again more evidence that we the voters must replace as many of these crooks, from both parties, as we can.

Senator Bill Nelson (D-Florida) today expressed concern on the Senate floor over the budget language inserted by Richard Shelby (R-Alabama) that many think will cripple the new commercial manned space companies with high costs and extensive paperwork.

Senator Bill Nelson (D-Florida) today expressed concern on the Senate floor over the budget language inserted by Richard Shelby (R-Alabama) that many think will cripple the new commercial manned space companies with high costs and extensive paperwork.

Sen. Bill Nelson (D-Fla.) took to the Senate floor June 18 and tapped the brakes on a powerful appropriator’s plan to subject NASA’s commercial crew program to strict federal accounting standards the agency waived when it solicited bids for crew transportation in November. Nelson, the chairman of the Senate Commerce science and space subcommittee, said NASA’s commercial crew program to fly astronauts to and from the international space station aboard commercially designed spacecraft needs “the right mix of oversight and innovation” to start ferrying crews by NASA’s target date of late 2017.

The senior senator from Florida was alluding to a directive Sen. Richard Shelby of Alabama, the top Republican on the Senate Appropriations Committee, personally fought to include in a report appended to a spending bill now awaiting debate on the Senate floor, and which would if signed into law require NASA to either comply with section 15.403-4 of the Federal Acquisition Regulations, or risk a legal mandate to do so. Nelson said he wanted to work with Shelby “as the bill goes to the conference committee to make sure that we have the right mix of oversight and innovation in how NASA contracts for this competition.”

While Nelson was apparently very careful in how he stated his public criticism of Shelby, he also made it clear that he wants the language changed. As the article noted, this gives opponents of Shelby a powerful ally in the Senate. Expect the Shelby language to be significantly watered down.

Richard Shelby’s poison pill in the Senate NASA budget bill that will double the cost of manned commercial space.

Senator Richard Shelby’s poison pill in the Senate NASA budget bill that will double the cost of manned commercial space.

Essentially Shelby wants to require the commercial companies to follow the older paperwork requirements used by NASA in the past. Presently, the contract arrangements NASA has used for these new companies have been efficient and relatively paperwork free, allowing them to build their cargo freighters (Dragon and Cygnus) and their manned spacecraft (Dragon V2, CST-100, and Dream Chaser) for relatively little.

The older contract rules are what NASA has used for Constellation and SLS as well as all past attempts to replace the shuttle. In every case, the costs were so high the replacement was never finished. In the case of SLS, the costs will be so high it will never accomplish anything.

Why has Shelby (R-Alabama) inserted this language? He wants pork, and SLS is the way to get it. Rather than cut the cost of SLS to make it more competitive (and which will reduce the pork in his state) Shelby instead wants to make the new commercial companies more costly, thus making SLS appear more competitive. It will still cost too much and will not accomplish anything, but this way he will be able to better argue for it in congressional negotiations.

Shelby illustrates clearly that the desire to waste the taxpayers’ money is not confined to the spendthrifts in the Democratic Party. Republicans can do it to!

House and Senate budgets for NASA give almost full funding to manned commercial space while boosting SLS.

House and Senate budgets for NASA give almost full funding to manned commercial space while boosting SLS.

The bill would provide $1.7 billion for the heavy-lift SLS rocket, some $350 million more than the White House requested for 2015, and $100 million more than the House has proposed. SLS is being built at the Marshall Space Flight Center in Huntsville, Alabama. Sen. Richard Shelby (R-Ala.), ranking member of the Senate Appropriations commerce, justice, science subcommittee, is an ardent defender of the center.

The bill also provides $805 million for NASA’s Commercial Crew Program, under which the agency is funding work on three competing astronaut transportation systems with the goal of having at least one delivering crews to and from the international space station by the end of 2017. The White House requested $850 million next year for Commercial Crew, its top human spaceflight development priority. The House proposed $785 million, which would represent a high water mark on a program that has never received the full funding sought by the White House.

That the proposed budgets made only tiny cuts to commercial space indicates that the political clout of this program is growing, since in previous budget years Congress had trimmed this program’s budget much more significantly. That Congress continues to also feed gobs of money to SLS, even though it won’t be able to fly more than 1.5 missions because of a lack of a European service module, indicates that these legislators are really only throwing pork at whatever they think will buy them votes, without any concern for the overall federal budget, instead of using their brains to pick and choose the smartest projects to fund.

Short of money for astrophysics because of the overruns on the James Webb Space Telescope as well as federal budget woes, NASA has decided to shut down the Spitzer Space Telescope.

Short of money for astrophysics because of the overruns on the James Webb Space Telescope as well as federal budget woes, NASA has decided to shut down the Spitzer Space Telescope.

Other missions, such as Kepler, Chandra, Hubble, NuStar, and Swift got extensions, however.

NASA reveals that the second flight of SLS in 20210 might not be manned.

Pigs in space: NASA reveals that the second flight of SLS in 20210 might not be manned.

This project officially started in 2010, which means this second flight will come more than a decade later. They will have spent more than $20 billion by that time, not counting the money spent on Orion. They will have also spent billions developing one engine for the upper stage, only to shelve it to develop another which they will need to test. Hence, the possibility that the second flight will be unmanned. NASA has also admitted that the third flight of SLS won’t come until 2024 at the earliest.

What kind of crap is this? This isn’t a space program or a project to explore the solar system. It is pure pork, a boondoggle designed to spend as much taxpayer dollars as possible for as long as possible. It is time to shut it down.

A GAO report says that NASA has been hiding the true and very expensive cost of the SLS/Orion projects by specifically excluding the cost of any actual missions that go anywhere.

It is nothing but pork: A GAO report says that NASA has been hiding the true and very expensive cost of the SLS/Orion projects by specifically excluding the cost of any actual missions that go anywhere.

NASA so far has put only two SLS missions on the manifest: a late-2017 test launch of an unmanned Orion into lunar space followed by a repeat of the mission in 2021 with crew onboard. NASA officials told GAO auditors it expects to have spent at least $22 billion on SLS and Orion through 2021, an estimate that does not include the cost of building the SLS launcher for the second mission. … Moreover, NASA provided no cost estimate for the more powerful SLS rocket NASA would need to mount a crewed Mars expedition the Obama administration envisions happening in the 2030s. According to NASA’s early plans, such a mission would entail multiple SLS-Orion launches.

The cost estimates NASA has offered so far “provide no information about the longer-term, life cycle costs of developing, manufacturing, and operating the launch vehicle, crew capsule, and ground systems” the agency has identified as crucial to the eventual Mars mission, the GAO wrote in its report.

In other words, they are going to spend $22 billion to launch the thing once. Meanwhile, NASA’s commercial manned space effort is producing three different spacecraft for about $3 billion total. If anyone in Congress had any brains, picking between these two programs would be easy, a no-brainer. Sadly, they have no brains, and really aren’t making their budgetary decisions with the needs of the nation in mind.

1 73 74 75 76 77 85