Why India’s Mars probe was so cheap

Alan Boyle has some interesting thoughts on why it cost India so little, less than the budget of the movie Gravity, to build and send its probe Mangalyaan to Mars.

The $74 million Mars Orbiter Mission, also known by the acronym MOM or the Hindi word Mangalyaan (“Mars-Craft”), didn’t just cost less than the $100 million Hollywood blockbuster starring Sandra Bullock. The price tag is a mere one-ninth of the cost of NASA’s $671 million Maven mission, which also put its spacecraft into Mars orbit this week. The differential definitely hints at a new paradigm for space exploration — one that’s taking hold not only in Bangalore, but around the world. At the same time, it hints at the dramatically different objectives for MOM and Maven, and the dramatically different environments in which those missions took shape.

Read it all. It gives us a hint at the future of space exploration.

The Great Space Race

Yesterday the private commercial launch company SpaceX broke ground on its own private spaceport near Brownsville, Texas.

“This feels great. It feels like the future,” [SpaceX founder Elon] Musk said at the ground-breaking. … He intends to have the first launch in late 2016, with an initial 12 launches a year. Ultimately, “thousands of launches,” he projected. Furthermore, “when we start doing commercial crew activities, I would expect us to launch a crew from here,” he said.

The significance of this construction is not trivial. This will be the first spaceport built by a private company that will be used to launch its privately-built commercial rockets, and will do it for profit. Other spaceports have been established in the last decade for the purpose of private space tourism, but none have seen anything fly, and all those spaceports were some form of quasi-government operation.

SpaceX’s Brownsville spaceport, rumored to be dubbed Mars Crossing, is not a government-run operation, however. It will be wholly owned and operated by the company, and is being built to allow them to launch commercial satellites unconstrained by the rules that make launches from the government controlled spaceports at the Kennedy Space Center as well as Vandenberg Air Force Base in California difficult and complicated.

This ground-breaking also comes on the heels of last week’s announcement that SpaceX and Boeing have been chosen by NASA to build spacecraft to ferry human astronauts to and from the International Space Station.

It also comes at the same time the Russian government has reorganized its entire aerospace industry to place it under government control, committed billions for the accelerated construction of a new spaceport on Russian territory, and launched the first test flight of its own new rocket, Angara, designed to compete for commercial market share while also reenergizing the entire Russian space effort.

Nor is that all.
» Read more

India inks space deal with China

The competition heats up: India has signed a cooperative agreement with China to work together on several space projects.

Asked about the areas of focus, [Isro chairman K Radhakrishnan] said: “Right now, broadly speaking, it will be natural disasters and remote sensing, which are natural choices. But by March-April 2015, the joint working team would have prepared a roadmap, chalking out various options and opportunities for concentrated efforts in space exploration.”

This article is among a lot of articles from India this week about space and the upcoming orbital insertion of their Mars Orbiter Mangalyaan. As I’ve said repeatedly, this emerging prosperous and capitalist nation is space happy!

Also, when you click on the link make sure you scroll down to read the secondary sidebar piece at the bottom titled “After Mars, Kathakali beckons Isro chief.” There they describe the other culture interests of the head of India’s space agency, and how he plans to spend his time after he steps down in December. It will give you a flavor of India’s culture and how it differs from ours, even as it strives to emulate us.

Falcon 9 launch puts Dragon in orbit

The competition heats up: SpaceX’s Falcon 9 rocket has successfully put its fifth Dragon cargo freighter into orbit, with a docking at ISS scheduled for Tuesday.

Spaceflight Now’s status update above also noted that this is the 13th launch of a Falcon 9 rocket since 2010. All these flights have successfully put their primary payloads into orbit as promised, an amazing track record for a new rocket built by a new company only in existence for less than a decade.

Extending ISS to 2024

An inspector general report released today has outlined some issues that NASA needs to address in order to keep ISS operational through 2024.

In this audit, the Office of Inspector General (OIG) found that while NASA has identified no major obstacles to extending ISS operations to 2024, it must address several areas of risk to ensure continued safe operations. Specifically, the ISS faces a risk of insufficient power generation due in part to faster-than-expected degradation of its solar arrays. Second, although most replacement parts have proven more reliable than expected, sudden failures of key hardware have occurred requiring unplanned space walks for repair or replacement. Third, with the retirement of the Space Shuttle fleet NASA has a limited capacity to transport several large replacement parts to the Station should they be needed. While the ISS Program is actively working to mitigate these risks, anticipating the correct amount of replacement parts and transporting them to the ISS present major challenges to extending Station operations 10 or more years beyond its original expected service life.

The report also noted concerns about the budget and the lack of commitment from NASA’s international partners.

Blue Origin to build rocket engine for Atlas 5

The competition heats up: Jeff Bezos’s company Blue Origin has signed a contract with the United Launch Alliance to build a rocket engine for the Atlas 5 rocket so that it will no longer have to depend on Russian engines.

Neither executive [of either company] would discuss a dollar figure, although it’s likely somewhat less than $1 billion. Bruno said a typical liquid-fueled rocket engine takes seven years and $1 billion to develop, but Blue Origin is already several years along on the BE-4. Bruno said the engine could be ready within four years to serve as the main engine on the company’s Atlas V rockets.

This is excellent news, because it shows that ULA is being pro-active in solving this problem, rather then waiting for Congress to act.

Another contest where you can win a ticket to space

Spaceship Earth Grants (SEG) has launched a contest where it will give away one space flight ticket to fly on any available launch service for every 50,000 applications it receives.

The winner (or winners) will receive a trip aboard a spaceflight provider flight available at the time of the award announcement. In other words, should the likes of space tourism companies like Virgin Galactic or Space Adventures be capable of offering trips into space at the time, then the winning candidate would be booked aboard one of their flights. Subject, of course, to availability and the various restrictions one or all of these companies may impose, along with the rider that no promise is made to be able to fly on a particular carrier.

Be warned however, the application is not free. SEG will charge you from $15 to $90, the amount “dependent upon the relative wealth of the nation in which you live.”

NASA has chosen Boeing and SpaceX to build manned spacecraft to ferry crews to ISS

The competition heats up: NASA has made a decision and has chosen two companies to ferry astronauts to and from ISS, and those companies are Boeing and SpaceX.

I am watching the press conference on NASA television. Some quick details from NASA here.

This is a reasonable political and economic decision. It confirms that SpaceX is ready to go and gives the company the opportunity to finish the job, while also giving Boeing the chance to show that it can compete while also giving that pork to congressional districts.

Some details: After NASA has certified that each company has successfully built its spacecraft they will have then fly anywhere from four to six missions. The certification process will be step-by-step, similar to the methods used in the cargo contracts, and will involve five milestones. They will be paid incrementally as they meet these milestones.

One milestone will be a manned flight to ISS, with one NASA astronaut on board.

One more detail. Boeing will receive $4.2 billion while SpaceX will get $2.6 billion. These awards were based on what the companies proposed and requested.

I will have more to say about this tonight on Coast to Coast, as well as on the John Batchelor show.

Air Force to decide SpaceX certification on December 1

The competition heats up: The Air Force has set December 1 for its deadline for certifying SpaceX as qualified to launch military satellites.

“I root for SpaceX to come into the competition,” Gen. John Hyten, head of Air Force Space Command, said during a speech Tuesday at the Air Force Association’s annual conference. But he warned that the company may not be ready in time. “The most important thing for this nation is assured access to space that works all the time,” he said. “That’s why the certification for SpaceX, hopefully by Dec. 1, is a big event. But if they’re not ready on Dec. 1, we have to stand up and say that, and that’s going to be difficult because I want competition.”

It sounds like the Air Force is setting this date as when it will decide one way or the other, regardless of anything SpaceX has done. I also suspect that, because of politics, this decision will hinge on what NASA decides today concerning its commercial crew contract.

No first stage landing attempt on next Falcon 9/Dragon launch

SpaceX has decided not to attempt a soft splashdown of the Falcon 9 first stage during Saturday’s launch of the Dragon capsule to ISS.

In a change of plans, the Falcon 9 booster stage set to launch Saturday will not carry landing legs, according to Hannah Post, a SpaceX spokesperson. She said SpaceX does not plan to attempt a water landing of the first stage after its job during launch is completed.

SpaceX initially planned to program the rocket’s first stage to fly back to Earth after completing its work to boost the Dragon spacecraft off the launch pad, but engineers swapped out the Falcon 9 booster with a first stage originally assigned to another flight, officials said.

The reason for the changeout was not disclosed.

I suspect this decision is in connection with the Falcon 9R failure last month, but admit I am speculating with no inside knowledge.

I should also note that if Saturday’s launch goes as planned, it will set a new SpaceX record for the fastest turn-around between launches, less than two weeks. If they succeed, I think they will prove once and for all to most of their remaining naysayers that they are a serious, reliable, and well-run launch company.

The competition in space continues to heat up

Two news stories today indicate that things are going to get increasingly interesting in the exploration of space in the coming years.

First there is this story from Joe Abbott of the Waco Tribune, who routinely reports on SpaceX news because their McGregor test facility is nearby. In it Abbott reports that SpaceX has scheduled its next Dragon supply mission to ISS for no early than September 20.

This news item however is not Abbott’s most interesting news. He also notes several twitter reports coming out a commercial satellite conference in Paris that indicate that SpaceX has closed 9 deals, including several more for its as yet unflown Falcon Heavy.

But even that is not the most interesting news. Abbott also reports that a replacement for the destroyed Falcon 9R test vehicle will be shipped to McGregor for testing in less than two months. Considering how long it takes governments to build and fly test vehicles, getting this replacement in shape for flight mere months after the failure a few weeks ago is quite impressive.

But even that was not Abbott’s most interesting SpaceX news item. » Read more

An update on the status of NASA manned commercial competition

Jason Davis at the Planetary Society blog has put together an excellent summary of the status for all three companies competing for NASA’s contract to ferry astronauts to and from ISS.

Key paragraph:

From a quantitative standpoint, Boeing is the leader. Since the first quarter of 2013, the company has been ahead in percentage of milestones completed and percentage of funding awarded. Plus, there’s the simple fact that they’ve finished all of their milestones, while SpaceX and Sierra Nevada asked for extensions. But from a qualitative standpoint, things are less straightforward. SpaceX has already proven they can fly missions to the ISS. And they’re the only CCiCap participant with a pad abort test and an in-flight abort test among their milestones.

It is very clear just looking at the actual milestones that what Boeing has done so far is not that impressive. Almost everything on their list is a paperwork review, not construction or testing of actual hardware. Meanwhile, SpaceX and Sierra Nevada are building and testing spacecraft. That they have not yet completed their milestones is hardly a big deal in this context.

Russia to match SpaceX launch prices

The competition heats up: The head of Russia’s United Rocket and Space Corporation (URSC), which now controls that country’s entire space industry, said today that they intend to compete with SpaceX’s Falcon 9 much cheaper launch prices.

They intend to do it with both the Proton rocket as well as their new family of Angara rockets. The heavy version of Angara will allow them to compete with SpaceX’s Falcon Heavy, and in fact might even put more payload into orbit for less.

Europe’s satellite makers want Ariane 6

Europe’s six biggest satellite makers have written Arianespace to demand that the company build its next generation Ariane 6 rocket by 2019 or face a significant loss of business.

Given the advent of electric propulsion and the dramatic launch-cost reduction offered by Space Exploration Technologies Corp., the operators say, the new Ariane 6 needs to be in service by 2019 or face the risk that Europe’s Arianespace launch consortium will be permanently sidelined. The letter was signed by six members of the European Satellite Operators Association. Signatories included the chief executives of Intelsat, SES, Eutelsat, Inmarsat, Hispasat and HellasSat.

This letter is clearly intended to help prod Arianespace into making a decision on whether to build a new rocket, Ariane 6, or upgrade Ariane 5. Right now the company’s partners have been unable to come to an agreement about what to do.

Another delay at Virgin Galactic

In an interview with David Letterman this week, Richard Branson admitted that his first flight on SpaceShipTwo will not be in December 2014 but early next year.

Watch the interview at the link. It is very clear that Branson is getting uncomfortable with the situation. He has made these claims too many times without showing any results. Also note the incredible ignorance exhibited by Letterman. A good interviewer has to ask some basic questions, but a good interviewer also needs to have a basic understanding of the subject. Letterman shows us here that he doesn’t know squat.

Another launch contract for SpaceX

The competition heats up: In a deal to build Bulgaria’s first communications satellite, Space Systems/Loral has contracted SpaceX’s Falcon 9 as launch vehicle.

The article makes a point of noting that the deal was financed by the U.S. Export-Import Bank, a detail that has in the past almost never been mentioned. The Ex-Im Bank however faces almost certain shutdown because of opposition in Congress, so this mention might be part of a vain attempt to save it.

Arianespace signs four new contracts

The competition heats up: As a result of lowering its prices to compete with SpaceX, Arianespace on Monday announced four new launch contracts for lighter weight commercial satellites.

At a press briefing here during the World Satellite Business Week conference, organized by Euroconsult, Arianespace said the contracts illustrate the company’s ability to win business in head-to-head competition with what has become its principal competitor, Space Exploration Technologies Corp. and the Falcon 9 rocket. Individual satellite operators choose satellite and rocket suppliers using a range of criteria including schedule, price, recent launch record and export credit-agency financing.

It was not immediately clear how many of the latest satellite wins for Arianespace followed competitions in which SpaceX offered bids compatible with customer specifications and still lost.

These satellites will be launched in the lower berth of the Ariane 5 rocket, which launches two satellites with each launch. Thus, these contracts — while encouraging for Arianespace — still leave the company with the need to find customers to fill that upper berth.

The first suspension bridge connecting mountain peaks

Switzerland is about to open the first suspension bridge ever built between two mountain peaks.

The bridge, suspended 9,700ft in the air, will also have a partial glass floor to allow visitors a once in a lifetime view of the 6,500ft drop between the Glacier 3000 and Scex Rouge.

It is scheduled to open in November, and is being built in an effort to attract more tourists to the Swiss Alps.

1 196 197 198 199 200 247