The Air Force has hired the Aerospace Corporation to evaluate how long it will take to replace the Russian engine used by the Atlas 5 rocket.

Government dithering: The Air Force has hired the Aerospace Corporation to evaluate how long it will take to replace the Russian engine used by the Atlas 5 rocket.

“I see numbers all over the map,” [Ray Johnson, vice president at Aerospace] said May 14 during the World Space Risk Forum here. “Some people say they could do it in five years. Others estimate it’s going to be longer than that, and that it could be eight.” Aerospace Corp. work evaluating what it would take to develop a hydrocarbon engine to replace the RD-180 — if U.S.-Russia relations sour to the point where the engine is no longer available or wanted — “is literally just a few weeks old,” Johnson said.

Time is critical on this issue. It seems to me a better thing to do would be to immediately issue of Request for Proposals, which would quickly tell the Air Force what the American aerospace industry has to offer. They could then proceed right to construction, rather than studying the issue endlessly beforehand.

Moreover, why isn’t Lockheed Martin doing something about this? It is their rocket that is dependent on the Russians. Why is it the Air Force’s responsibility to save them?

Want to fly into space? All you have to do is “build the future” and win the Hackaday Prize.

Want to fly into space? All you have to do is “build the future” and win the Hackaday Prize.

You’re probably wondering what you’re actually supposed to build? We’ve been vague up to this point on purpose, because spouting specific categorization stifles creativity. We want you to Build the Future — not fit inside of a tiny box made of disqualifying restraints. … The only requirements you really have to hit are quite simple:

  • You must actually build something
  • It must involve some type of electronics that are connected to something
  • Our main requirements have to do with documentation. This includes lists of parts, schematics, images, and videos. Remember, Openness is a Virtue.

The winner gets just under $200K to buy a ticket on the commercial space carrier of their choice. Or they can cash it in. Numerous additional prizes will also be awarded.

Hat tip to commenter Eric who says he has entered, is not building a rocket engine “that seems to be in demand all of a sudden,” but is building something that is “out there” nonetheless.

In a sweeping election victory on Friday India voted a new pro-business party and prime minister into power.

India goes capitalist: In a sweeping election victory on Friday India voted a new pro-business prime minister into power.

The victory was a landslide, including a major sweep in parliament.

The long entrenched but now defeated Congress Party had begun moving away from socialism back in 1991, which produced a booming economy for India.

Prime Minister Singh launched reforms in 1991 as finance minister that opened India’s socialist economy to global capital, but his spell in the top job ended marred by corruption and a floundering economy amid mounting policy paralysis. He has already bid farewell to his staff after ten years in office.

The new leader, Narendra Modi, is expected to accelerate this effort.

Debris from the Proton launch failure yesterday has been found in China.

Debris from the Proton launch failure yesterday has been found in China.

The vagueness of yesterday’s Russia reports suggested to me the possibility that the rocket might have fallen into another country’s territory, something the Russians would normally not like to advertise. It appears, however, that most of the satellite and rocket has burned up before hitting the ground.

This report clarifies some details about the failure. It was the Proton’s third stage that failed, not the Briz-M stage that has caused failures in the past. This is also the 6th failure of a Proton since December 2010, a poor launch record that strongly indicates serious quality control problems in the manufacture of this rocket.

Update: Inmarsat, one of the Proton rocket’s biggest customers, is considering dumping the Proton for future launches. To do so will be expensive and will likely delay the launch of their next two satellites, both of which were scheduled for launch on a Proton in 2014. Nonetheless, it appears they are considering it.

A Russian Proton rocket crashed today nine minutes after launch.

When it rains it pours: A Russian Proton rocket crashed today nine minutes after launch.

Considering the tensions between the U.S. and Russia over space, combined with the increasing competition for the launch market created by SpaceX’s lower prices, another Proton failure now is something the Russians could do without. Moreover, the Russians were planning a lot of Proton launches in the next few months to catch up from last year’s launch failure. Many of these scheduled launches were commercial and were going to earn them hard cash. This failure definitely hurts, and will certainly be used as justification by their government in increase its control over that country’s aging aerospace industry.

In an effort to reassure its ticketholders, Virgin Galactic sent them email on May 10 disputing the story that they have discovered cracks in WhiteKnightTwo.

In an effort to reassure its ticketholders, Virgin Galactic sent them an email on May 10 disputing the article that said there are cracks in WhiteKnightTwo’s wings.

The email was interestingly sent before the article was published, which of course meant that it could not directly address any of its findings.

The story above also has a link to an article detailing the many predictions by Virgin Galactic about when they will begin commercial flights, going back to 1999. To put it mildly, their track record has not been good.

On Tuesday Virgin Galactic rolled WhiteKnightTwo out of its hanger “as part of a gearing up process.”.

Is it cracked or not? On Tuesday Virgin Galactic rolled WhiteKnightTwo out of its hanger “as part of a gearing up process.”.

Though the above article is very vague about what is being done, this article explains that they are doing taxi tests of new landing gear. The timing, however, makes me suspect that this is also a public relations ploy to counter yesterday’s reports about cracks in the vehicle’s wings.

Though they really don’t need it, a private effort to reactivate a 1970s spacecraft has now gotten NASA’s okay.

Though they really don’t need it, a private effort to reactivate a 1970s spacecraft has now gotten NASA’s okay.

This piece of paper from NASA is a definite nice-to-have, given that “a private entity cannot legally salvage U.S. government property in space,” according to Mike Gold, a space law expert and attorney who works full time as the head of Washington operations for Bigelow Aerospace, the North Las Vegas, Nevada, company developing inflatable space habitats with technology licensed from NASA.

But practically speaking, it appears NASA could have done little to stop the ISEE-3 Reboot project from moving ahead with its plan to take over the old spacecraft — an Earth-Sun observatory that launched to the gravitationally stable Earth-Sun Lagrange point 1 in 1978 and is now swinging back toward the home planet in the heliocentric orbit NASA nudged it into in 1982 to chase comets.

What is really more important is that their effort to raise the necessary private funds for this project has largely succeeded.

Russia fights back

Much has been made about the sanctions the Obama administration has imposed on any cooperation with Russia due to the situation in Ukraine and how those sanctions might damage the commercial and manned space efforts of the United States.

So far, all evidence has suggested that the sanctions have little teeth. The Obama administration exempted ISS from the sanctions. It also appears to be allowing the shipment of all commercial satellites to Russia for launch. Even a court injunction against using Russia rocket engines in U.S. military launches was lifted when the Obama administration asked the judge to do so.

The Russians now have responded. Why do I take their response more seriously?
» Read more

A news story today reports that cracks have been discovered in the wings of WhiteKnightTwo.

More problems for Virgin Galactic: A news story today reports that cracks have been discovered in the wings of WhiteKnightTwo.

Sources tell me the cracks are along the spars that run the length of the wings. Specifically, they are located where the spars connect with the fuselage. My sources tell me the cracks have caused quite a bit of concern among the engineers at Virgin and Scaled. One particularly worrisome aspect is that nobody knows why or when they occurred.

I’m told there is some comfort in the repairs being made based on previous Scaled experience in patching composites. However, since the cause of the cracks is uncertain and WhiteKnightTwo is unique in terms of its size and the stresses placed on it by SpaceShipTwo, the engineers are in uncharted territory. They don’t know if they have addressed the root cause, or whether the problem will reoccur.

If this story turns out to be trie, it will likely be a disaster for Virgin Galactic. Not only can they not yet fly SpaceShipTwo because of engine issues, the mother ship that puts the spacecraft into the air can’t fly either.

Does the auction sale of an Excalibur Almaz capsule signal the end of this manned space commercial company?

Does the auction sale of an Excalibur Almaz capsule signal the end of this manned space commercial company?

It certainly looks that way, which is tragic in that the company had a very smart and viable idea: Use already built Soviet-era manned space equipment to launch a space hotel and provide a ferry to it for a relatively low cost. The development was already done and the hardware already built. All they had to do is refurbish and update things.

Ground tests of SpaceShipTwo’s engines continue.

Ground tests of SpaceShipTwo’s engines continue.

No flight tests have occurred in four months, however, which suggests that they have decided to abandon their first engine design and are now doing these new ground tests to prove the reliability of the new engine before proceeding to flight tests. The lack of flight tests also suggests that Richard Branson’s most recent announcement that he will definitely fly as a passenger this year is most likely hogwash.

Building a scale model of the International Space Station — using matchsticks!

Building a scale model of the International Space Station — using matchsticks!

Recently completed by Acton, the wooden ISS is as impressive in size as it is in detail. Comprised of 282,000 matchsticks, the 1/26 scale model required 8 gal (30 L) of glue and took roughly 1,950 hours to complete. Whereas the actual ISS measures out at 108.5 m (356 ft) wide and 72.8 m (239 ft) long, Acton’s scaled down version measures out at an impressive 4.1 m (13.5 ft) and 2.8 m (9.2 ft) wide. Solar arrays, trusses, communication components, and even the Space Shuttle Atlantis, are all there in intricate detail.

With pictures.

Fact checking Elon Musk’s statements about his company’s efforts to reuse the Falcon 9 first stage reminds us of some space history and one of Musk’s chief competitors.

Fact checking Elon Musk’s statements about his company’s efforts to reuse the Falcon 9 first stage reminds us of some space history and one of Musk’s chief competitors.

The bottom line: Bringing the first stage back to Earth safely and vertically is doable, and has been done before.

How to turn an American spacecraft ferrying astronauts to ISS serve as a lifeboat as well.

How to turn an American spacecraft ferrying astronauts to ISS serve as a lifeboat as well.

A very interesting read, as it outlines the specific technical problems faced by engineers that one wouldn’t normally consider. The capsule has to be able to remain functional and reliable after months in orbit, but it also has to become functional at a moment’s notice, should an emergency happen.

SpaceX continues to acquire land in Texas for its planned spaceport in Brownsville.

The competition heats up: SpaceX continues to acquire land in Texas for its planned spaceport in Brownsville.

Elon Musk’s Dogleg Park LLC picked up an additional five lots in late April, bringing the total number of lots it has acquired in Cameron County to 95. The total land area that SpaceX now owns is roughly 38 acres of land, public records show. This is in addition to 56.5 acres that SpaceX has under lease at the site of what would be the world’s first private and commercial vertical launch site.

Compared to the acquisitions made by the federal government when it established its space centers in Florida and Wallops Island, these purchases are small. Nonetheless, they are likely sufficient for what the company plans to do.

SpaceX releases spectacular footage of another vertical take-off and landing test of their Falcon 9R rocket.

The competition heats up: SpaceX releases spectacular footage of another vertical take-off and landing test of their Falcon 9R rocket, this time flying over 3,000 feet in the air.

Video below the fold. What I think everyone, including me, has missed so far about both the Grasshopper and the Falcon 9R test flights is that the test vehicle not only was able to land safely using its rockets, both vehicles were quickly turned around and flown again. This certainly lends weight to the feasibility of the company’s plan to make their first stage reusable.

» Read more

The porksters arrive!

A draft bill in Congress is proposing the Pentagon develop an engine for the Atlas 5 engine to replace the Russian engine now used.

The legislation passed by a House subcommittee Wednesday calls for up the U.S. military to spend up to $220 million next year to kick off full-scale development of the engine, which could be ready for flights no later than 2019. The bill states the Defense Department “should develop a next-generation liquid rocket engine that is made in the United States, meets the requirements of the national security space community, is developed by not later than 2019, is developed using full and open competition, and is available for purchase by all space launch providers of the United States.”

There is no reason for this funding gift to the aerospace industry. For one thing, there are two rockets that already exist that use all U.S. parts, the Delta family of rockets and the Falcon 9. For another, if Congress stays out, the private sector will take care of this need and do it for a lot less and far quicker, while costing the taxpayers relatively little. By making this a government project we guarantee it will be expensive and take forever, thus keeping the pork flowing to Congressional districts without solving the problem.

And speaking of keeping pork flowing to Congressional districts, pork king Senator Richard Shelby (R-Alabama) today ripped into NASA for trying to trim a little from the budget of SLS (which sends a lot of cash to Alabama). He also condemned NASA’s manned commercial effort.
» Read more

A gigantic forest fire threatens Russia’s new spaceport under construction in Vostochny.

A gigantic forest fire threatens Russia’s new spaceport under construction in Vostochny.

[Spaceport construction chief Konstantin] Chmarov reportedly characterized the fire-fighting effort in the region as “chaos.” Fueled by hot weather and strong winds, the fire approached the airport in Svobodny and was also moving toward Vostochny. In the meantime, satellite images showed heavy smoke blanketing the future space center.

The Putin government has been giving the completion of this spaceport a high priority. Having it burn down before completion is not what they want.

SpaceX has won an injunction from a federal judge, preventing ULA from buying any further Russian engines.

SpaceX has won an injunction from a federal judge, preventing ULA from buying any further Russian engines.

Federal Claims Court Judge Susan Braden said her preliminary injunction was warranted because of the possibility that United Launch Alliance’s purchase of Russian-made engines might run afoul of the sanctions. NBC News’ past coverage of the issue was cited in Braden’s ruling.

Wednesday’s injunction prohibits any future purchases or payments by the Air Force or United Launch Alliance to NPO Energomash, unless and until the Treasury Department or the Commerce Department determines that the deal doesn’t run counter to the U.S. sanctions against Russian officials. Braden stressed that her ruling does not affect previous payments to the Russians, or purchase orders that have already been placed. United Launch Alliance says it already has some of the engines on hand.

This injunction is not directed specifically at the Air Force’s bulk buy from ULA, nor does it address the cartel-like nature of the ULA monopoly for Air Force launches that SpaceX is challenging. However, it does put a serious crimp, if temporary, on the use of Lockheed Martin’s Atlas 5 rocket, which depends on the engine for all its launches. Though the company has engines in stock, they will quickly run out with no way to immediately replace them.

1 204 205 206 207 208 248