Air Force willing to use re-used Falcon 9 first stages

Capitalism in space: The head of the Air Force’s space division said yesterday that they would be willing to launch satellites using Falcon 9 used first stages.

“I would be comfortable if we were to fly on a reused booster,” General John “Jay” Raymond told reporters at the U.S. Space Symposium in Colorado Springs. “They’ve proven they can do it. … It’s going to get us to lower cost.”

Suborbital promises

Capitalism in space: Two stories today highlight the contrasts that presently exist within the still unborn suborbital tourist industry:

In the first, Richard Branson made another one of his bold predictions, the same kind of prediction he has been making about Virgin Galactic now for almost a decade. Again and again he claims, based on nothing, that his spaceship will be carrying people into orbit in mere months. It never happens. It won’t happen here.

In the second, Jeff Bezos announces that he hopes to fly people on his New Shepard suborbital spacecraft by 2018, but at the same time he also announces that the program is delayed.

Bezos, speaking in front of the company’s exhibit at the 33rd Space Symposium here that features the New Shepard propulsion module that flew five suborbital spaceflights in 2015 and 2016, backed away from earlier statements that called for flying people on test flights later this year. “We’re going to go through the test program, and we’ll put humans on it when we’re happy,” he said. “I don’t think it’s going to be 2017 at this point. It could be.”

Bezos has been very careful, from the beginning, to make no bold or specific predictions about when his spacecraft will fly manned. Here, he is once again making it clear that any previously announced schedules were very tentative, and should not be taken too seriously.

Which person would you trust with your life on a suborbital flight?

ULA prepares to choose engine for Vulcan

Capitalism in space: ULA’s CEO Tory Bruno announced at a space conference this week that should Blue Origin’s BE-4 engine pass its testing phase his company will be prepared to select it for their Vulcan rocket.

Bruno also said that no decision has yet been made, and that Aerojet Rocketdyne’s AR1 engine remains an option, though it is 18 to 24 months behind in development.

Orbital ATK developing new rocket

Capitalism in space: Orbital ATK is developing a new rocket, based on the solid rocket technology it provided for the space shuttle, to compete with SpaceX and ULA.

Two versions of the rocket are planned. The medium-lift variant will have a two-segment, solid-fuel first-stage motor and a single-segment, solid second. The heavy lifter will have a four-segment first stage and a single-segment second. Both versions can be outfitted with strap-on boosters for extra lift capacity, Orbital representatives said.

To complete the rocket’s development the company says it needs to win a follow-up contract that the Air Force has been issuing to help ween the U.S. from the use of Russian rocket engines.

ULA reduces workforce at Vandenberg

Capitalism in space: In an effort to save costs ULA is reducing its workforce at Vandenberg by 48.

The company has been aggressively trying to streamline its operations to better compete against SpaceX. This reduction was expected, and based upon what I saw when I toured Vandenberg a few years ago, entirely justified. While SpaceX’s operations then looked lean and simple, ULA’s set up appeared a bit inefficient.

ULA gets three launch contracts

Capitalism in space: ULA last week won three launch contracts, two from the Air Force and one from NASA.

Both rockets are part of the existing EELV Block Buy between the Air Force and United Launch Alliance. The mission assignments were announced Friday by the Pentagon. The missions exceed the lift performance of the SpaceX Falcon 9 rockets that has been certified by the Air Force for national security payloads, making ULA the only provider available to execute these heavy launches.

In other government-launch news, NASA said last month that the second satellite in the next-generation era of U.S. civilian weather observatories will be launched atop an Atlas 5-401 rocket. The Atlas 5 beat out the Falcon 9 in a competition to win the rights to launch the Joint Polar Satellite System spacecraft No. 2 in 2021 from Vandenberg Air Force Base.

For SpaceX to truly compete with ULA they need to get the Falcon Heavy flying.

Russia responds to SpaceX reused booster success

A bunch of stories from Russia today appear to express that country’s political response to SpaceX’s success yesterday in launching a commercial satellite using a previously flown first stage.

It appears that these stories are quoting a variety of Russian officials who apparently did not get their stories straight. Also, it appears that much of what they are saying here is pure bluster. For example, in the third link the official makes the silly claim that the ability of their rocket engines to be started and then restarted repeatedly proves they are dedicated to re-usability. And the first two links don’t provide much back-up for the claims that they can complete with SpaceX, especially since SpaceX presently charges a third less than they do per launch, and that is using new boosters. With reused boosters SpaceX’s launch fees will be less than half what Russia has been charging for a Proton launch ($90 million vs $40 million).

Similarly, the claim that they will complete 30 launches this years is absurd. They won’t be able to launch Proton until May, at the soonest, because of the need to remove defective parts from all of their in-stock engines. Soyuz launches are similarly delayed while they check its engines also. To complete 30 launches in only seven months seems very unrealistic to me, especially since the best they have done in a full year this century is 34 launches, with an average slightly less than 30 per year.

Nonetheless, this spate of stories and statements by Russian officials shows that they are feeling the heat of competition, and also feel a need to respond. The first story has this significant statement:

Russia’s State Space Corporation Roscosmos is responding to the challenges with available possibilities, he added. “It has announced a considerable reduction in the cost of Proton rocket launches. The commercial price of this rocket’s launch is considerably higher than its prime cost and we have the potential for the price cut. But customers are giving up our services because the number of payloads [satellites] remains unchanged and does not grow. Correspondingly, a new player on the market snatches away a part of orders,” the expert noted.

Because of Russia’s low labor costs they have always had a large profit margin on their Proton launches. The $90 million they charged was set just below what Arianespace charged for its launches. It appears they are now planning to lower their prices further to match SpaceX.

Posted from the south rim of the Grand Canyon.

First Falcon Heavy demo launch to include two used boosters

The competition heats up: SpaceX plans to use two already flown first stage boosters when it does its first demo flight of Falcon Heavy later this year.

Musk said the rocket cores for Falcon Heavy’s first flight are two to three months away from completion. He emphasized that the first launch will carry a lot of risk, and as such, SpaceX doesn’t plan to carry a valuable payload or payloads with it. “We will probably fly something really silly on Falcon Heavy because it is quite a high risk mission,” he said.

SpaceX will seek to recover all the boosters from the first Falcon Heavy flight, assuming all goes according to plan. Musk said the two side boosters would land back at Cape Canaveral Air Force Station, followed by the center core returning to a drone ship in the Atlantic.

They will also try to recover the upper stage, but are not hopeful this will succeed. The article also notes that they hope to fly an additional four used boosters in 2017. SES is eager to use them on its three scheduled flights this year.

The company has also said that the booster that was successfully reused this week will not fly again, but will instead be put on display in Florida.

Posted from the south rim of the Grand Canyon.

SpaceX recovers fairing of upper stage of Falcon 9

The competition heats up: Even as SpaceX made history yesterday in its successful use and recovery of a used first stage, it also recovered for the first time the fairing that protected the satellite.

For the first time, SpaceX also recovered the payload fairing, the conical shaped structure on top of the rocket that surrounds and protects the spacecraft during launch. The fairing separates from the spacecraft in two sections during the launch sequence — in this case, 3 minutes and 49 seconds after launch — and usually falls into the ocean and breaks into pieces. SpaceX outfitted these two fairing sections with parachutes so they could be recovered, which apparently will become standard practice.

Musk also indicated that they are now going to begin an effort to recover the second stage. “What’s the worst that could happen? It blows up? It would anyway.”

Rush – Countdown

An evening pause: The video focuses on a shuttle launch, but I think the words apply to all launches, and especially to those that break new ground.

Excitement so thick you could cut it with a knife
Technology…high, on the leading edge of life

Hat tip Commodude.

A tour of Vector Space Systems

Jim Cantrell and cars

[UPDATE: I have been informed by Vector’s PR department that they have recently changed the company’s name, dropping “Space Systems” from the title. I can’t really change the title here, but I thought I note this fact for my readers.]

Today I got a quick tour of Vector Space System’s very blue collar but active rocket factory in Tucson, Arizona. My tour guide was Jim Cantrell, the CEO of the company.

Cantrell, shown on the right in front of one of his side businesses fixing and refurbishing race cars and rare luxury sports cars (also located in this factory), started out with a love of race cars, which he still builds and races. As he said to me, “Long endurance car racing is still my thing.”

However, he has also spent his life in the space business. He has worked for government agencies and numerous private businesses, including SpaceX at its very beginning. Vector Space Systems is an effort put together by him and several other people to capture the smallsat market, a market he truly believes is going to explode with activity in the coming years. If things go as he wishes, they hope to launch at least one hundred times a year, from multiple launch sites. Their goal is simplicity and quick turnaround at an inexpensive cost.

The company is presently in the testing phase leading up to their first orbital launches, which they hope to start in 2018. Right now they are building a series of full scale versions of their Vector-R rocket with a dummy second stage. The idea is to do a string of suborbital test flights, the first of which will fly in about a week from Mohave in California, with the second flying from the Georgia spaceport in Camden County. The image below is the first stage of that first test rocket.

Vector test first stage

Vector first stage engine

second test rocket

For this flight their main goal is to test the engine, which Cantrell is showing me in the picture to the right. I was astonished at how small and simple the engine was. In fact, the rocket itself was amazingly small. It looked like it could almost fit inside a typical moving truck.

Below and to the right is the first stage for their second test flight, presently being assembled. They hope it will be ready for flight in only a few weeks after the first flight. They plan five suborbital test flights, with the last capable of getting about 90% to orbit. Along the way they will test their avionics, the rocket’s balancing systems, and its computer and tanks. Once these tests are complete they will then move to testing the orbital version in 2018.

Obviously, all this depends on every test flight being successful. But then, even if something goes wrong they will learn something and move on. For example, they recently transported an engineering version of the rocket to the visitor center at Kennedy. As Cantrell explained, “We learned things new just making that move.”

bumper sticker

In the end, I think the bumper sticker to the right, attached to the window of Vector Space System’s office, sums everything up. The people at Vector want to make money in space, but they — like everyone in the space business — also love making rockets and engines and going fast. What better combination from life could you ask for?

Atlas 5/Cygnus launch delayed until mid-April

ULA has delayed its next Atlas 5 launch to send a Cygnus cargo capsule to ISS until mid-April.

Gatens said NASA was now expecting the Cygnus to launch to the station no earlier than the middle of April. “The Orbital launch, the next launch, has slipped due to an investigation of a hydraulic leak in the booster engine compartment that’s in work,” she said. “There are some components being replaced. The investigation is going on and we’re currently targeting no earlier than, probably, a mid-April launch.”

ULA spokeswoman Jessica Rye said March 28 that a new launch date has not been set yet for the mission. “Additional information will be provided once testing to resolve the booster hydraulic issue is complete,” she said.

The launch was initially planned for mid-March. This delay has forced NASA to delay a spacewalk because it involves installing equipment that the Cygnus capsule is bringing to ISS.

Washington Bubble fights back against Capitalism in Space

The response to my policy paper, Capitalism in Space, has been not surprisingly mixed. Eric Berger at Ars Technica wrote a reasonable analysis that focused on the absurdly high overhead costs of SLS/Orion. There have also been a number of critical reviews, one in Forbes and a second today in the print edition of Space News.

Both have tried to discredit the facts I have put forth about the ungodly cost of SLS/Orion, when compared to commercial space, without actually citing any incorrect facts in my paper. The truth is that everything I have written is true. This graph from my paper remains fundamental:

Table 5 from Capitalism in Space

SLS/Orion is costing four times as much, is taking more than twice as long to build, and is producing one tenth the operational flights. It is essentially a pork-laden jobs program that has no ability to get the United States anywhere in space. It might be an engineering marvel, but the cost is so high and its operational abilities so slow (one flight per year, at best) that it will never be a reliable and effective tool for exploring the solar system.

Meanwhile, private enterprise is getting innovative new rockets off the ground, for far less money, and repeatedly. If we want to settle the solar system, they are providing us the only viable way to do it.

People must recognize that these attacks are essentially the bubble of Washington working to protect its financial and intellectual interests. A lot of people in DC depend on keeping the faucet of government spending flowing to SLS/Orion, even if those projects accomplish nothing. In the case of the attacks from academics, they don’t like the fact that I am an outsider and not beholden to them. Moreover, they are instinctively appalled by the idea of allowing capitalism and freedom to operate freely, without their guiding hands controlling things. Such thoughts must be attacked and squelched (if possible), in order to protect their interests.

That they don’t seem to care that much about the interests of the American people and the country is quite revealing however. As some have said repeatedly, this is how you got Trump.

Vector signs deal with Georgia spaceport

Vector Space Systems has signed a deal with a Georgia spaceport to conduct one suborbital test flight there of its Vector-R rocket.

The agreement covers only one flight, but considering that Vector is also planning to launch from Kennedy, I think they are doing this to test their rocket’s ability to easily launch from multiple launch sites. It is a small mobile rocket, and they are probably designing its launch systems to be very mobile as well.

A look at Blue Origin’s upcoming plans

Two stories today give us a peek at Blue Origin’s future plans.

The first outlines how the company plans to launch its orbital rocket, New Glenn, from Florida. The second provides a photo tour of the company’s suborbital New Shepard capsule, as designed for tourist flights.

I must mention that I have been disappointed at the lack of test flights for New Shepard in recent months. Their last flight was in October, almost six months ago, when their test of the capsule’s launch abort system was supposedly a success. No tests since, even though they have said they planned the first manned test flights this year. I am beginning to wonder if they have decided to shift resources to the orbital system and thus slow the suborbital program down.

Reused first stage static fire dress rehearsal today

Update: The countdown and static fire test has been completed, apparently successfully. The launch however is now set for Thursday.

SpaceX today plans to do the first static fire dress rehearsal countdown of a Falcon 9 rocket using an already used first stage.

The static fire process for SpaceX and its Falcon 9 rocket is one of the last critical components in the pre-launch flow ahead of liftoff. For SES-10, the Falcon 9 and mated second stage will be moved to the launch pad on top of the TEL (Transporter Erector Launcher) and will be taken to vertical at historic launch complex 39A. Once the Falcon 9 is vertical, technicians and engineers will complete all of the connections between the TEL/launch mount and LC-39A and proceed into countdown operations on Monday morning.

For this particular static fire, SpaceX has up to an eight-hour window.

If all goes well, they plan to do the actual launch on Wednesday.

The article by the way also provides a nice detailed history of the first stage.

Next Proton launch tentatively set for May

The Russians have tentatively scheduled their next Proton launch for May, contingent on the repair work being done on the rocket’s engines.

The engine repairs are required because of corruption in the factory that made them. Previously, the Russians had hoped to get Proton off the ground by April. That is no longer likely.

The link above includes a manifest of Russian launches through next year. Interestingly, it only includes three commercial launches. A quick review of the launches listed at this site only includes another three or so commercial launches much farther in the future. All in all, it appears that the Russians are getting less business for this rocket. I also suspect this will remain the case until they get things fixed and begin launching again, though they will need to cut their prices significantly to match SpaceX’s.

SSL sues Orbital ATK over proprietary in-space servicing technology

Space Systems/Loral has filed a lawsuit against Orbital ATK over that company’s improper access to proprietary information concerning its in-space servicing plans.

At least four confidential SSL documents were viewed and distributed by an Orbital ATK employee working at NASA’s Langley Research Center in Hampton, Virginia, where the data is stored as part of an ongoing SSL partnership with the U.S. space agency, according to the complaint filed in U.S. District Court for the Eastern District of Virginia.

Orbital declined to comment.

SSL, a subsidiary of Canada-based MacDonald, Dettwiler and Associates Ltd., said it was informed of the data breach by NASA in December 2016. Orbital acknowledged the unauthorized access of SSL’s data and fired the employee, but did not respond to questions about the scope of the breach or about five other Orbital employees whom NASA said may have read the SSL documents, the lawsuit said.

The two companies are in direct competition for doing in-space robotic servicing of satellites. Last month Orbital ATK sued DARPA for its contract with SSL for this work, claiming the contract violated U.S. policy that forbids DARPA from competing directly against commercial companies. It appears that this new lawsuit is a bit of tit-for-tat.

1 196 197 198 199 200 306