NASA awards SpaceX deal to provide cargo to Gateway

Capitalism in space: Should NASA ever decide to build its proposed Gateway space station in orbit around the Moon (the odds of which have gone down recently), it announced today that it has signed a deal with SpaceX to use its Falcon Heavy rocket and an upgraded larger version of its Dragon capsule to ship cargo to that station.

The deal calls for at least two missions, and is SpaceX’s first deal in NASA’s Artemis program.

This deal is a major blow to SLS and Boeing, which up to now had a monopoly on all launches to supply and launch Gateway. In fact, Gateway was invented by Lockheed Martin, Boeing, and NASA (not Congress) in order to justify SLS’s existence. That NASA has now decided it is better off using the much cheaper and already operational Falcon Heavy for some Gateway missions suggests that SLS is increasingly vulnerable to cancellation. NASA is making it obvious that other commercial options exist. No need to wait years and spend billions for SLS, when they can go now, for much less.

NASA confirms May target date for first manned Dragon flight

Capitalism in space: In announcing today it is beginning media accreditation for SpaceX’s first manned Dragon flight to ISS, the agency confirmed earlier reports from SpaceX that they are now aiming for a mid-to-late May launch.

Much can change before then. COVID-19 could get worse, shutting down all launches. The engine failure on yesterday’s successful Falcon 9 launch could require delays.

However, right now, things look good for May, which will be the first time since 2011 that Americans will launch from American soil on an American-built rocket, an almost ten year gap that has been downright disgraceful. Thank you Congress and presidents Bush and Obama! It was how you planned it, and is also another reason we got Trump.

The last cargo Dragon to berth with ISS using robot arm

Astronauts yesterday used the robot arm on ISS to berth SpaceX’s cargo Dragon freighter, the last time a Dragon capsule will be berthed to the station in this manner.

The successful supply deliver marked the 20th time a SpaceX Dragon cargo capsule has arrived at the space station since May 2012. The mission, known as CRS-20 or SpaceX-20, also the final flight of SpaceX’s first-generation Dragon spacecraft, which the company is retiring in favor of a new Dragon capsule designed to dock directly with the space station without needing to be captured by the robotic arm.

I could put this another way that is more embarrassing to NASA. After twenty flights, the agency has finally admitted that SpaceX can design a spacecraft that can do automatic dockings, and is now willing to allow it.

That of course is a gross simplification. Nonetheless, the successful unmanned demo flight last year of SpaceX’s crew Dragon, docking directly with ISS, has proven SpaceX can do it. And since that crew Dragon is essentially the same design for SpaceX’s future cargo Dragons, it makes sense to shift from robot-arm-berthing to direct docking for all future Dragon flights.

SpaceX successfully launches cargo Dragon to ISS

Capitalism in space: SpaceX tonight successfully launched a cargo Dragon freighter to ISS.

This is the third flight for this Dragon capsule. It was also the last flight of the company’s first generation Dragon capsules. The company also successfully landed the first stage, which was on its second flight. This was the fiftieth time they have successfully done this. I have embedded the launch video below the fold.

The leaders in the 2020 launch race:

4 China
4 SpaceX
2 Arianespace (Europe)
2 Russia

The U.S. now leads China 7 to 4 in the national rankings.
» Read more

Dragon capsule for first manned mission shipped to Florida

Capitalism in space: SpaceX yesterday shipped to Florida the Dragon capsule it will use for its first manned mission, now set for sometime between April and June.

No official word yet on any specific launch date, though there are reports that they are targeting May 7.

In that same story at the second link a NASA official admitted that one of the big issues is filling out the paperwork.

“Even though it sounds mundane, there is a load of paper that has to be verified, and signed off, and checked to make sure we’ve got everything closed out,” [said chief of human spaceflight Doug Loverro.] “It is probably one of the longest things in the tent to go ahead and do. It’s underappreciated but critically important. You’ve got to make sure you’ve done everything you need to do along the way.”

Properly documenting what you are doing is always essential, but if you over do it you raise costs unnecessarily while simultaneously delaying things. And isn’t it interesting that both of these issues — budget overruns and scheduling delays — have been systemic on all of NASA’s projects for decades?

Furthermore, while good documentation can help prevent problems and help you figure out what went wrong, when things go wrong, doing more of it will not further reduce problems or failures. If anything, too much paperwork will likely increase mistakes by focusing workers on the wrong things. This seems to be one of NASA’s problems in recent years.

Regardless, it does look like that first privately built launch will happen in mere months. The one decision remaining that could legitimately delay it would be if NASA decides to make it a longer mission, requiring more training for its astronauts.

Trunk from Dragon recovered intact

Capitalism in space: In recovering various pieces, including the capsule, dropped in the Atlantic during its January 19 launch abort test, SpaceX (and Elon Musk) were surprised to retrieve the capsule’s trunk section, normally attached below the capsule, largely intact and undamaged.

The recovery does not mean SpaceX will recapture and reuse this component in the future, since on an orbital flight the trunk would go into orbit. What it does suggest strongly is that SpaceX’s engineering is remarkably robust. To quote the old Timex commercial, “Takes a licking, keeps on ticking!” Kudos to them.

Dragon returns to Earth with mice and cookies baked in space

After several months docked to ISS SpaceX’s cargo Dragon returned to Earth today, bringing back forty mice send up in December for research and some cookies that were baked in space.

Researchers want to inspect the handful of chocolate chip cookies baked by astronauts in a special Zero G oven just in time for Christmas. The oven launched to the space station in November, so astronauts could pop in pre-made cookie dough provided by DoubleTree. A spokesman for the hotel chain said five cookies were baked up there, one at a time. The company plans to share details of this first-of-its-kind experiment in the coming weeks. “We made space cookies and milk for Santa this year,” NASA astronaut Christina Koch tweeted late last month from the space station, posing with one of the individually wrapped cookies.

Scientists also are getting back 40 mice that flew up in early December, including eight genetically engineered to have twice the normal muscle mass. Some of the non-mighty mice bulked up in orbit for the muscle study; others will pack it on once they’re back in the lab.

At the moment the only way to get experiments like this back from ISS is with cargo Dragon. Hopefully that will change when Sierra Nevada’s Dream Chaser mini-shuttle finally flies in the next few years.

SpaceX to test upper stage endurance as part of Dragon launch

Capitalism in space: SpaceX plans to perform a six hour orbital coast test of its Falcon 9 upper stage following the release of the Dragon cargo capsule tomorrow (scrubbed today due to high winds).

This is why the first stage will land on a drone ship rather than at Kennedy.

According to SpaceX the test is at the request of “other customers”, unnamed. The article adds this speculation:

Jensen says that the coast test will be performed for unspecified “other” customers, presumably referring to the US Air Force (USAF) and other commercial customers interested in direct-to-geostationary (GEO) launch services. Direct GEO launches require rocket upper stages to perform extremely long coasts in orbit, all while fighting the hostile vacuum environment’s temperature swings and radiation belts and attempting to prevent cryogenic propellant from boiling off or freezing solid. In simple terms, it’s incredibly difficult to build a reliable, high-performance upper stage capable of remaining fully functional after 6-12+ hours in orbit.

Although SpaceX said that the test was for “other” customers, that may well have been a cryptic way to avoid indicating that one such customer might be NASA itself. NASA is in the midst of a political battle for the Europa Clipper spacecraft’s launch contract, which is currently legally obligated to launch on NASA’s SLS rocket. Said rocket will likely cost on the order of >$2 billion per launch, meaning that simply using Falcon Heavy or Delta IV Heavy could save no less than ~$1.5 billion. Incredibly, that means that simply using a commercial launch vehicle could save NASA enough money to fund an entire Curiosity-sized Mars rover or even a majority of the cost of building a dedicated Europa lander. Such a launch would demand every ounce of Falcon Heavy’s performance, including a very long orbital coast.

These speculations could all be true. SpaceX might merely be doing what it always does, testing new engineering upgrades during operational missions. It will then be able to sell its rocket’s enhanced capability to all these customers.

December 17 officially set for Starliner unmanned orbital launch

Capitalsm in space: NASA and Boeing have now officially scheduled the launch of Boeing’s Starliner capsule on its first unmanned demo flight to ISS for December 17.

Boeing had announced this date earlier, but it is now official.

The next two months will be a very busy period for tests of the two privately built manned capsules being built by Boeing and SpaceX. Not only will Boeing fly Starliner on its first unmanned orbital mission, the company will also do a pad abort test of Starliner on November 4. SpaceX in turn will be doing a major parachute test campaign for Dragon, as well as a launch abort test, right now roughly scheduled for late November.

If all go well, both companies will be ready for the first manned flights of both capsules in the first quarter of 2020.

Bridenstine’s visit to SpaceX a non-story

Link here. Essentially he just reiterated his desire to have the private capsules being built by SpaceX and Boeing flying by early next year.

Essentially, the announcements in the last few days by Musk and Boeing about their upcoming testing and launch schedule for both Dragon and Starliner respectively took the steam out of his SpaceX visit.

In fact, I wonder what the politics were behind this. It is almost as if both companies wanted to take the steam out of his appearance here. Most intriguing.

Musk confirms: Dragon launch abort test in about 10 weeks

Captalism in space: According to a series of tweets by SpaceX head Elon Musk today, the company now expects they will be ready to fly their launch abort test of their Dragon capsule in about ten weeks, about the third week in December.

Musk noted that they need only do a static fire test and then “reconfigure for flight.”

Expect more detailed information at tomorrow’s press event at SpaceX in California with both Musk and NASA administrator Jim Bridenstine.

Capsule and booster for SpaceX launch abort test arrives in Florida

Capitalism in space: The Dragon capsule and Falcon 9 first booster for SpaceX’s launch abort test have both arrived in Florida and are being readied for flight.

SpaceX’s launch license suggests this test will occur no earlier than November 1, so it looks like the company is getting close. However, don’t hold your breath about the manned launch. It appears that NASA is still hassling SpaceX “with certification and safety reviews,” which in plain language is mostly paperwork and filling out forms that NASA’s safety panel can then rubber stamp.

NASA in negotiations to buy more Russian Soyuz astronaut seats

Collusion with Russia discovered! NASA has begun negotiations with Russia’s Roscosmos space agency to buy more astronaut flights to ISS using Russia’s Soyuz rocket and capsule.

According to the story at the link, NASA’s last purchased ticket will fly in March of 2020, and these negotiations would buy flights beginning in the fall of 2020 and beyond into 2021. The story also cites statements by NASA administrator Jim Bridenstine to CNN, confirming these negotiations.

Apparently NASA thinks the manned capsules being built by Boeing and SpaceX will not be ready by the fall of 2020, and needs to buy tickets from Russia because of this.

However, the only reason those American capsules will not have been approved and flown by then will be because NASA’s timidity in approving their launch. The agency’s safety panel as well as its management have repeatedly delayed these private American capsules, sometimes for very strange reasons, including a demand that lots of paperwork be filled out, and what I consider to be an unjustified demand for perfect safety.

Had NASA adopted a reasonable criteria for launch, SpaceX’s Dragon capsule could have flown three years ago.

Meanwhile, NASA seems quite willing to put Americans on a Soyuz rocket, launched by a foreign power whose safety record in the past half decade has been spotty, at best. In that time Russia has experienced numerous quality control problems, including mistakes that led to an Soyuz abort during a launch and a Soyuz parachute failure during a landing, corruption that forced them to recall all rocket engines and freeze launches for almost a year, and sabotage where someone drilled a hole in a Soyuz capsule prior to launch, a sabotage that Russia still refuses to explain.

It is unconscionable for NASA to favor putting Americans on a Soyuz with many documented safety issues, but block the launch of Americans on American-made capsules, for imagined safety issues that have mostly made no sense. In fact, the contrast makes me wonder about the loyalty of NASA’s bureaucracy. They certainly seem to favor Russia and Roscosmos over private American companies.

Progress on Dragon parachute tests

It appears that SpaceX’s parachute testing for its Dragon manned capsule is finally satisfying the concerns of NASA and its safety panel, based on a Sept 17 NASA blog post.

In fact, SpaceX’s success has even forced NASA “to reevaluate its own [parachute] standards and certification processes.”

The article at the link also notes quite correctly NASA’s tendency to miss the forest for the trees, which is why it has forced SpaceX to do so much additional parachute testing, even though the company apparently had a solid understanding of its parachutes a long time ago.

[T]he space agency has been focused on parachutes and COPVs [the tank issues that caused the 2016 launchpad explosion] for years. This is primarily a result of NASA’s notoriously reactive approach to safety: SpaceX suffered two COPV-related Falcon 9 failures in 2015 and 2016 and has experienced an unknown number (likely 1-3) of anomalies during Crew Dragon parachute testing.

As a result, NASA has focused extensively on these two stand-out concerns. To an extent, this is reasonable – if you know things have a tendency to fail, you’re going to want to make sure that they don’t. However, prioritizing reactive safety measures at the cost of proactive safety would be a major risk, akin to getting in a car crash because you didn’t use a turn signal and then prioritizing turn signal use so much that you forget to look both ways before making turns. Sure, you will probably never get in the same crash, but you are raising the risk of new kinds of accidents if you overcorrect your attention distribution.

Either way, it increasingly appears that a manned Dragon mission might finally be getting close to launch.

SpaceX launches used Dragon to ISS with used Falcon 9

Capitalism in space: SpaceX today successfully used a Falcon 9 rocket to launch a Dragon freighter to ISS.

The Dragon is making its third flight to ISS. The first stage, which landed successfully, was making its second flight, and will likely be used on the next Dragon cargo mission.

Video of the launch and 1st stage landing is below the fold. The launch is at about 15 minutes. The first stage landing is one of the most spectacular yet.

The leaders in the 2019 launch race:

10 China
9 Russia
9 SpaceX
5 Europe (Arianespace)
4 India

The U.S. now leads China 15-10 in the national rankings.
» Read more

SpaceX pinpoints cause of Dragon explosion during test

SpaceX today revealed that it has pinpointed the cause of the explosion that destroyed a Dragon manned capsule during an engine test in April.

The company believes that the problem originated with the Crew Dragon’s emergency abort system, which consists of a series of small thrusters embedded within the capsule. If all goes well during a mission, these tiny thrusters are never really meant to be used. But if there is some kind of failure during a future launch, the thrusters can ignite and carry the Crew Dragon safely away from a disintegrating rocket.

SpaceX says that a leaky valve caused the propellant needed for these thrusters to cross into another system — one of really high pressure. When this contamination occurred, the high forces slammed the liquid around, causing valuable components to fail and leading to the ultimate loss of the capsule.

Koenigsman said that this contamination definitely was not anticipated, though the kind of valve that leaked has been known to have some internal leakage problem. Ultimately, he acknowledged that, to some extent, this was a design issue. “It’s something that the components should not have done,” Koenigsman said. “But at the same time, we learned a very valuable lesson on something going forward, one that makes the Crew Dragon a safer vehicle.”
““it was a huge gift for us.” ”

SpaceX will replace all of these types of valves with another component known as a burst disk, which is supposed to be much more reliable, according to Koenigsman.

The company is still hoping to fly before the end of the year, but admits that this may not be possible. Right now they have a tentative launch date in November.

Schedule for Dragon/Starliner manned flights revised

Capitalism in space: NASA has released a new updated planning schedule for the manned flights of both SpaceX’s Dragon and Boeing’s Starliner manned capsules.

Boeing’s first unmanned demo flight of Starliner is now set for September 17, 2019. This will be followed by SpaceX’s first manned Dragon flight, scheduled for November 15, 2019. Boeing will then follow with its first manned Starliner flight on November 30, 2019.

These are considered target dates. I have great doubts that the Starliner schedule will proceed as described, while SpaceX’s schedule is more likely.

The article also had this interesting tidbit about the upcoming launch schedule of Sierra Nevada’s unmanned reusable cargo ship Dream Chaser:

According to the document, the first flight of Dream Chaser will take place in a planned September 2021 timeframe and will see the vehicle remain berthed to the International Space Station for up to 75 days before returning to Earth to land on a runway for reuse.

There are clearly issues with all these commercial projects. For example, the GAO today released a new report citing the numerous delays in this commercial manned program and calling for NASA to come up with a more complete back-up plan.

Nonetheless, the 2020s have the potential to be the most exciting decade in space exploration since the 1960s. If all goes even close to these plans, the U.S. will have three operating manned spacecraft (Dragon, Starliner, Orion), two reusable cargo spacecraft (Dragon, Dream Chaser), one non-reusable (Cygnus), and a plethora of launch companies putting up payloads of all kinds, from planetary missions to basic commercial satellites numbering in the thousands.

Much could happen to prevent all this. Keep your fingers crossed that nothing will.

SpaceX reschedules manned Dragon demo flight to November

Capitalism in space: SpaceX has now apparently rescheduled its first manned Dragon demo flight to ISS to no earlier than November 1, 2019.

The information comes from a SpaceX application with the FCC, listing the launch window as sometime between November 1, 2019 and April 30, 2020.

This now gives us the time frame when both NASA and SpaceX expect to complete their investigation into the Dragon test explosion in March as well as institute changes as a result. It also suggests they now have a much better idea what happened and what they need to do, thus allowing them to create this time frame.

Bigelow announces four tourist bookings to ISS using Dragon

Capitalism in space: The private space station company Bigelow Aerospace announced yesterday that it has booked four tourists to spend from one to two months on ISS.

The bookings will fly to ISS using SpaceX’s Falcon 9 rocket and Dragon capsule. Though the company did not say how much these tourists have agreed to pay, it said that it intends to charge $52 million per ticket.

This announcement follows directly from NASA’s announcement last week that it will allow commercial tourist flights to ISS. Previously Bigelow had said it would fly tourists to its own space station using Boeing’s Starliner capsule. Now it is going to take advantage of NASA’s new policy to send the tourists to ISS, and it will use Dragon, probably because Dragon is closer to becoming operational.

I also suspect that Bigelow’s long term plans are to add its own hotel modules to ISS for these flights, and then later follow-up by building its own independent space station.

Dragon cargo capsule successfully returns to Earth

Capitalism in space: After a month docked to ISS SpaceX’s seventeenth Dragon cargo freighter successfully splashed down yesterday.

I think that makes eighteen successful splashdowns. While NASA keeps demanding SpaceX do more tests of its manned Dragon parachute system, which has been made even more robust than the cargo capsule in that it includes four chutes, not three, for greater redundancy, the company keeps demonstrating that they already know how to do this.

SpaceX investigation into test explosion ongoing

A NASA update yesterday into SpaceX’s investigation into the test explosion that destroyed a manned Dragon capsule revealed that while the company is still working to launch humans by the end of the year, this schedule remains tentative until the investigation is completed.

The update included two important details. First, SpaceX is going to use for its launch abort test the Dragon capsule it had previously planned to fly on its first manned demo mission, and for that mission will use the capsule intended for the first operational manned flight. That first operational flight will then use a new capsule from their assembly line.

Second, the update confirmed that the anomaly that caused the explosion occurred as they were activating the SuperDraco thruster system, but prior to the firing of the thrusters. While this suggests once again that the failure might have not have involved the capsule but the test procedures, we will not know for sure until they release their investigation conclusions.

Are Boeing and SpaceX having parachute issues with their manned capsules?

There appears to be a significant conflict between what NASA has been saying about the parachute development tests for both SpaceX’s Dragon capsule and Boeing’s Starliner capsule and what the companies have reported.

The head of NASA’s manned program, Bill Gerstenmaier, has said that both programs have had “anomalies” during their tests. Both companies have said otherwise, with both companies claiming that all their parachutes have been successful. The article looks into this, and what it finds tends to support the companies over Gerstenmaier. There have been issues, but not as terrible as implied by Gerstenmaier.

So what is going on? I suspect that Gerstenmaier is overstating these issues as part NASA’s game to slow-walk the private capsules in order to make SLS not look so bad. He would of course deny this, but that denial won’t change my suspicions, in the slightest. I’ve seen NASA’s bureaucracy play too many games in connection with getting these capsules approved for flight to be generous to Gertenmaier or NASA. I don’t trust them. I’ve seen them make dishonest accusations against SpaceX and Boeing too many times already.

Russia to launch two more American astronauts on Soyuz

A news report from Russia today announced that NASA has extended its contract with Roscosmos so that two more American astronauts will fly to ISS using a Soyuz rocket and capsule.

Russia and the United States have agreed on two additional places on board of Soyuz carrier rockets for journeys of NASA astronauts to the International Space Station (ISS), Roscosmos Executive Director for Manned Programs Sergei Krikalyov told TASS. “The documents have been approved,” Krikalyov said adding that it the procedure to sign the papers took place before a recently reported incident with Crew Dragon spacecraft.

According to Krikalyov, there was no new draft of the document as it was “Simply an update to the previously signed contract, everything was in work order and there was no solemn ceremony to mark the signing of the documents.”

This agreement practically guarantees that there will be no Americans flying on American-built spacecraft in 2019. Rather than push SpaceX and Boeing to get their technical problems solved quickly so they can start flying, NASA can continue to slow-walk their development by going to the Russians. For NASA bureaucrats, using the Russians is to their advantage. Any failures can be blamed on the Russians, not NASA due diligence, which would be the case if an American privately-built capsule failed.

Moreover, slow-walking the American spacecraft helps NASA avoid further embarrassment with its own manned system, SLS/Orion, which is years behind schedule. By slowing the private capsules, the delays with SLS/Orion won’t seem so bad.

In other words, NASA’s approach here favors itself and the Russians over the interests of our country and American private companies. It is too bad no one in the Trump administration notices, or cares.

April parachute test for manned Dragon had problems

In testimony yesterday before Congress NASA’s chief of human spaceflight, Bill Gerstenmaier, revealed that during a test of the parachute system SpaceX will use on its manned Dragon capsule there was a problem.

The test appears to have occurred last month at Delamar Dry Lake in Nevada, where SpaceX was conducting one of dozens of drop tests it intends to perform to demonstrate the safety of its Crew Dragon spacecraft. This was a “single-out” test in which one of Dragon’s four parachutes intentionally failed before the test. “The three remaining chutes did not operate properly,” Gerstenmaier said.

…The test sled, Gerstenmaier confirmed, was “damaged upon impact with the ground.”

The cause of the failure, which might have been parachute design or a failure in the test equipment (such as the release from the airplane) is still being investigated.

This news, combined with the failure during Dragon thruster tests, also in April, likely guarantees that SpaceX will not launch in 2019. If it were up to SpaceX, I think they could get these issues dealt with and fly, but their customer is NASA, and NASA is notoriously slow at investigating and fixing engineering test problems like these.

My next post above underlines this conclusion.

Partial power outage on ISS today delays Dragon cargo mission

A partial power failure on the International Space Station has forced NASA to delay for at least two days the Dragon cargo mission that had been scheduled to launch early tomorrow morning.

The delay will allow time for NASA flight controllers at the Johnson Space Center in Houston to continue troubleshooting an issue with a distribution box in the space station’s electrical power system. Engineers detected an issue with the Main Bus Switching Unit on Monday morning, and ground teams plan to replace the component later this week, ahead of the SpaceX cargo launch. “Teams are working on a plan to robotically replace the failed unit and restore full power to the station system,” NASA said in a statement Tuesday. “The earliest possible launch opportunity is no earlier than Friday, May 3.”

The Main Bus Distribution Unit is one of several that routes power from the space station’s U.S. solar arrays to the research outpost’s electrical channels. The suspect unit distributes power to two of the eight electrical channels on the station, including a power supply for the space station’s robotic arm, which the station astronauts will use to capture the Dragon cargo craft as it approaches the complex.

While the robotic arm remains powered through a separate channel, NASA flight rules require redundant power supplies for the arm during critical operations, such as the grapple of a free-flying spacecraft.

Since the cargo Dragon freighter is berthed to the station using the robot arm, they want to get this fixed before launching Dragon. Right now the new launch date will occur no earlier than the wee hours of Friday, May 3.

NASA safety panel on SLS schedule, Dragon explosion

NASA’s safety panel held a long scheduled meeting to review NASA’s on-going manned projects, and had the following to say:

The first story describes very little new information about the explosion on April 20th that destroyed the Dragon crew capsule during engine tests, other than it occurred in connection with the firing of the Dragon’s eight SuperDraco engines. I am being vague because they were.

The second story describes the panel’s strong objection to any effort by NASA to trim the test program for SLS in order to meet the Trump administration’s 2024 deadline for returning to the Moon. It also confirms officially for the first time that NASA will not be able to fly the first unmanned mission of SLS in 2020. That flight is now expected in 2021, a decade after NASA began development of SLS, and seventeen years after George Bush Jr first proposed NASA build this heavy-lift rocket.

That’s practically one person’s entire career at NASA. Seems pretty shameful to me.

While I actually agree with the panel’s advice in both of these stories, both stories however do reflect the overall culture of this safety panel: Go slow, take no risks, be patient. This culture is in fact so cautious that it has served to practically make impossible any American exploration of space, on our own rockets.

Based on what I expect now during the investigation of the Dragon explosion, I would not be surprised if the panel successfully delays the first manned Dragon launch another year or two or three.

1 4 5 6 7 8 15