Microsoft and Facebook to lay Atlantic cable

Microsoft and Facebook have announced plans to lay a trans-Atlantic communications cable from Virginia to Spain.

Running from Virginia Beach, Virgina to Bilbao, Spain, MAREA (which is Spanish for “tide”), it will be the first cable to connect the US to southern Europe, over a distance of 6,600 km (4,100 miles). From Blibao, it will connect to network hubs in Europe, Africa, the Middle East and Asia, with the goal of improving speed and reliability. For Microsoft this means improvements for users of its cloud services, such as Bing, Office 365, Skype, Xbox Live, and Microsoft Azure, while for Facebook it means improvements for users of its eponymous social network.

I find this story very puzzling. The whole reason communication satellites exist is because they have historically been far cheaper to build and launch with far greater capacity than ocean cables. Thus, the decision of these companies to go with an undersea cable instead of satellites suggests that something has changed in that equation, though I can’t see what. Have undersea cables improved so much that they have a bigger capacity than satellites, so much bigger that it compensates for the higher cost of installation and maintenance?

Belize and Guatemala

During my caving trip to Belize last week, we reserved one day off to do some sightseeing. The goal that day was to visit the Mayan ruins of Tikal, across the border in Guatemala about three hours from our resort in Belize.

Arranging this trip was not straightforward. We couldn’t simply get in our rental car and drive off. Locals have found it a bad idea to drive Belizean vehicles in Guatemala, as they are more likely to be attacked. So, the resort arranged for a Belizean driver to take us to the border, where it also arranged for us to be met by a Guatemalan tour guide with her own car.

On the way, we drove through several small towns of both Guatemala and Belize, as shown by the two photos below, with Santa Elena, Belize on top.
» Read more

Antares static engine test scheduled

The 30-second static fire engine test of the Antares first stage and new Russian engine has now been scheduled for May 31.

The window for the engine test, or hot fire, is 5 p.m. to 8:15 p.m. EDT. Backup test dates run through June 5. Completion of the test will be noted on the Wallops’ Facebook and Twitter sites. During the test, the upgraded Antares dual RD-181 rocket engines will fire for 30 seconds at maximum 100% power (thrust) while the first stage of the test rocket will be held down on the pad. The hot fire will demonstrate the readiness of the rocket’s first stage and the launch pad fueling systems to support upcoming flights.

If all goes well, they hope to launch Antares with a Cygnus capsule in early July.

Anti-Trump protesters get violent at Trump rally

Brown-shirts: Protesters at a Trump rally tonight in New Mexico threw rocks, broke windows, and blocked exits.

More here. and here. There were some reports of gunfire, but these appear to not be true. Regardless, it is unconscionable for these protesters to act this way. They might think the Trump is a fascist, but the only ones acting like fascists here are the protesters themselves.

There has been a lot of anger and passion during this presidential campaign, but so far almost all the violence has come from the left.

Chito

An evening pause: Hat tip George Petricko, who noted, “Just when you think the whole world has gone rotten, you see someone like this.” I say, this is just one more testament to what is possible if you are humble and do the best you can, with what you have.

Iridium announces its own alternative to GPS

The competition heats up: Iridium has announced the availability of its own location technology comparable to GPS and using the company’s constellation of satellites.

Iridium Communications Inc. has introduced its Satellite Time and Location (STL) service, an alternative or complement to traditional indoor and outdoor location-based technologies, and declared it ready for use. STL’s position, navigation and timing (PNT) technology is deployed through Iridium’s 66 cross-linked, low-earth orbit satellite constellation. Through Iridium satellites and in GNSS receivers, STL technology can work to verify GPS, GLONASS, Galileo and other navigation services, and also can serve as an alternative for those services when GPS signals are degraded or unavailable. STL also can provide an alternative source of time when testing GPS signals.

Essentially, for practically nothing, using satellites and technology already in orbit, they have created their own system that can both compete and complement the expensive government-built GPS systems.

United Kingdom cancels spaceport competition

The competition heats up: The United Kingdom has cancelled its spaceport competition to chose one spaceport and instead has announced it will allow any one of the competing locations to operate if they can want and can meet some licensing requirements.

In other words, instead of the government dictating one location as the nation’s spaceport, it will allow different locations to compete for the space launch business.

The link has few details, though a closer look at subject of the British space effort can be found here.

SpaceX, Lockheed Martin, and Mars

Two stories this week illustrate the difference between lobbying the government to get anything accomplished, and doing it yourself with the goal of making money from it from private customers.

In the first case SpaceX is planning to fly a Dragon capsule to Mars, using its Falcon Heavy rocket, and do it by 2018. It would not be manned, but would do the initial engineering testing for later manned missions, using larger interplanetary spacecraft. SpaceX is not asking the government to help pay for it. They are only making sure they have dotted all the legal “I”s required. The goal is to build spacecraft that can take anyone to Mars who is willing to pay for the flight.

In the second case Lockheed Martin is proposing a big government program to put six astronauts in orbit around Mars, in 2028. They haven’t really built anything yet to do this, they merely are lobbying the federal government to pay for it.

Which do you think is more likely to happen? Anyone who reads Behind the Black knows that I choose SpaceX. For 40 years I have seen many different variations of Lockheed Martin’s proposal, all of which came to nothing. They are powerpoint proposals, not real engineering, designed to wow Congress and NASA and get funding for the company. Nothing will ever be built, since the actual construction is so far into the future and so untested that it is impossible to predict what will really happen.

SpaceX however is planning a real mission, which is being designed to lay the groundwork for later more complex attempts. Rather than propose something big for far in the future, they are building something reasonable and doable now. Moreover, they aren’t lobbying the government, they are advertising their skills to the entire world, with the goal of convincing everyone to buy their very real product.

UPDATE: I should add a link here to Orbital ATK’s proposal in Congressional hearings on Monday to use their Cygnus capsule to build a cislunar space station by 2020. Like Lockheed Martin, they are lobbying Congress to build a mostly powerpoint concept. Why don’t they instead make an investment of their own money, like SpaceX, to send some Cygnus capsules to lunar space and demonstrate the concept, while also learning what needs to be done? I would have greater faith in the reality of their concept if they did that.

Status of the third recovered Falcon 9 first stage

The recovered first stage from SpaceX’s last Falcon 9 launch experienced significant wear and tear during its high speed descent and landing.

They do not think they will be able to use the stage again, but will instead test it to determine the engineering tolerances that need to be met to make recovery and reuse in these situations more likely. The data will also help them increae the likelihood of reusability on launches that are less stressful.

Posted from Belize.

Airbus initiates smallsat launcher project

The competition heats up: Airbus has begun a project to develop a smallsat commercial launch rocket, competitive with Rocket Lab’s Electron and Virgin Galactic’s LaunchOne, aimed at the cubesat and nanosat satellite market.

The source for the story was unnamed, and also gave few details, so it is hard to know how real this is. What I gather however is that we might be seeing the beginnings of a long term split in the launch market, with one set of big rockets designed to launch human-related payloads, including humans, and a second set of small rockets focused on launching unmanned satellites.

ULA’s CEO explains why they are retiring Delta

Tory Bruno, the CEO of ULA, explained in an op-ed today why his company is discontinuing its use of Boeing’s Delta family of rockets and focusing exclusively on Lockheed Martin’s Atlas 5 and its eventual replacement, the Vulcan Centaur.

Delta is an amazing rocket, but it’s costly to produce. Its burnt-orange foam insulation has to be applied by hand. Its production line is bigger and more complex than Atlas’s. And its components are pricier.

Bruno’s purpose with this op-ed is to convince Congress to leave his company alone while they develop the new Vulcan rocket. Congress keeps proposing outlawing use of the Atlas 5 with its Russian engines, and Bruno does not want that, at least not until the Vulcan is flying. He is also trying to reduce his costs by discontinuing Delta, which in turn would allow him to lower prices for his Atlas 5 and compete more effectively with SpaceX.

Though I understand Congress’s concerns, I do find it sad that in modern America a private businessman has to lobby Congress for the right to run his company as he sees fit.

First manned Starliner flight delayed

Boeing has revealed that the first manned flight of Starliner will be delayed until 2018.

This delay for Boeing is not really a surprise. Unlike SpaceX, the company had done very little actual development work on the capsule before winning its contract from NASA. They therefore have a lot more to do to become flight worthy. My one worry is their contract. If the contract is fixed price, as with the original cargo contracts awarded SpaceX and Orbital ATK, Boeing will have no incentive to delay, as they won’t be paid anything until they achieve specific milestones and will get no additional monies to cover the added costs of the delay. If the contract is cost-plus, however, NASA’s traditional contract system used for SLS, Orion, and almost every other boondoggle since the 1960s, then Boeing will be paid regardless of the delay, and NASA will also be on the hook for paying the additional delay costs, thus giving Boeing an incentive to slow walk the construction.

I think the contract was fixed-price, but am not sure. Anyone out there have an answer?

Why I use Linux

Linux can be a pain sometimes, and it requires a bit more hands-on work by the user to make it function, but overall in the ten years since I abandoned Windows and switched to Linux (first with the Debian operating system and now with Kubuntu) I have found my work on my computer to be far more satisfying and successful. I can mostly get things done the way I like to do them, not as dictated by some software geek working at Microsoft’s headquarters.

Which is why this story interested me: “I thought my daughter clicked on ransomware – it was the damn Windows 10 installer.” It describes a number of stories where Windows 10 took control of a person’s computer and imposed an upgrade, against their will.

This story, among many others, only confirmed for me that my decision in 2006 was a wise one. I will never return to Windows, and if I was certain that computer projectors could read Linux laptops I’d switch the laptop to Linux as well.

It is just a shame however that so many people still stick with Windows, as it often makes doing their work difficult, if not impossible. When a product doesn’t work for you, you find another product. That’s how freedom and competition work.

SpaceX’s second first stage barge landing

Below is video of the Falcon 9 first stage landing last night. There isn’t really much to see, because this happened at night. However, I must repeat that this happened at night. In other words, SpaceX was able to bring its first stage down accurately in the middle of the ocean onto a tiny barge in the dark.

Who says the impossible is not possible?

During the live telecast, the audience broke out into a chant of “USA! USA!”, as they did after the previous first stage landings. Can you guess why?

Does Trump have the best space policy?

This opinion column looks at the three remaining politicians campaigning for president, and finds that Donald Trump probably has the most favorable position toward commercial space.

While all three candidates mouth favorable platitudes towards NASA and space exploration, all three also express reluctance to fund a giant government space program. Trump however was the only one to note the positive aspects of commercial space and express

…support for the government partnering with private space companies like Elon Musk’s SpaceX. “I think there needs to be a growing partnership between the government and the private sector as we continue to explore space,” Trump told AIAA. “There seems to be tremendous overlap of interests so it seems logical to go forward together.”

Obviously, one can’t and shouldn’t put much faith in what any politician says during the campaign. Nonetheless, this might be a hopeful sign that if elected, Trump would push to dump NASA’s SLS/Orion and have NASA instead focus on buying space exploration services designed and operated by private companies.

SpaceX lands the first stage again!

The competition heats up: In tonight’s launch, SpaceX not only put a commercial satellite into geosynchronous orbit, it successfully landed the first stage on a barge, a landing they did not expect to succeed.

Go here to watch a launch replay. The landing is at about 38 minutes.

With this success, I think they have demonstrated that they can recover that first stage in almost every circumstance. The next big challenge: Launch Falcon Heavy and recovering all three of its first stages.

Luxembourg signs deal with asteroid mining company

The competition heats up: As part of its outer space development program, the government of Luxembourg has signed a deal with asteroid mining company Deep Space, Inc. to build an orbital demonstration test satellite.

The inaugural project of this exciting new partnership is Prospector-X™, an experimental, low Earth orbit technology demonstration mission, designed to test the company’s innovative deep space technology. These key enabling technologies will be instrumental to the success of the company’s first deep space resource exploration missions in the near future. The Prospector-X spacecraft will be built at Deep Space Industries’ new European headquarters, in Luxembourg, in conjunction with the company’s international and American partners, including the Interdisciplinary Centre for Security, Reliability, and Trust (SnT) at the University of Luxembourg.

It essentially appears that Luxembourg is creating its own space program, focused entirely on profit by acting as the venture capitalist for private commercial companies. Most interesting.

Congressman proposes major changes to regulation of commercial space

Doug Messier has posted a detailed analysis of Congressman Jim Bridenstine’s (R-Oklahoma) proposed American Space Renaissance Act (ASRA) that is definitely worth reading.

Most of the changes appear aimed at organizing the regulation process of commercial space more completely under FAA control, rather than the hodge-podge of agencies that presently have responsibility. The bill also encourages NOAA and NASA to increase their use of commercial data for weather and Earth remote sensing.

At first glance, the bill looks good, but it also is not likely to be passed as written. Moreover, not surprisingly it calls for a hefty increase in funding for the FAA agencies being given more responsibilities, but I wonder if Congress will comparably reduce the funding of those agencies it takes responsibility from. My instinct tells me no, which means of course that the government and bureaucracy grows again.

SpaceX gears up for first Falcon Heavy flight

The competition heats up: SpaceX has already begun construction of one of the booster cores for its first test flight of Falcon Heavy, and expects to have all built by summer.

They have not yet decided on the payload or goal of that first test flight, though they appear to still be aiming for an November launch.

Meanwhile, they have a 1:21 am (eastern) Falcon 9 commercial launch tonight, in which they will also attempt another first stage barge landing.

NASA signs engineering test agreement with new launch company

The competition heats up: NASA has signed an agreement to provide testing facilities to Generation Orbit so it can do test flights of its air-launched rocket.

Generation Orbit Launch Services, Inc. (GO) is pleased to announce the signing of a Space Act Agreement with NASA Armstrong Flight Research Center (AFRC) to collaboratively pursue the flight test and envelope clearance for the GOLauncher 1 air launched rocket vehicle. Utilizing AFRC’s experience and capabilities in flight test engineering for air launch rocket systems, the two year program will demonstrate integration of the GOLauncher 1 Inert Test Article (GO1-ITA) with NASA’s Gulfstream III research aircraft, captive carry flight testing, and release testing. Further, NASA AFRC will continue the development of its store separation analysis capability, eventually validating the toolset through release flight testing of the GO1-ITA.

Like many similar past SAA agreements, NASA will provide no money, but will make its facilities available for testing at no charge. For a new company like this, this availability will help them enormously, and is more in line with what NASA was originally designed to do.

1 185 186 187 188 189 255