SpaceX has reported that they have found the cause of the Falcon 9 launch abort this morning.

In an email update, SpaceX reports that they have found the cause of the Falcon 9 launch abort this morning.

During rigorous inspections of the engine, SpaceX engineers discovered a faulty check valve on the Merlin engine. We are now in the process of replacing the failed valve. Those repairs should be complete tonight. We will continue to review data on Sunday. If things look good, we will be ready to attempt to launch on Tuesday, May 22nd at 3:44 AM Eastern.

If this is true, than this entire exercise is an unqualified success and illustrates a certain robustness to SpaceX’s engineering on Falcon 9. Their control computer during the launch process spotted the problem before it caused a complete loss of the vehicle and payload. They can now locate the problem, fix it, and proceed with launch.

Senator Bill Nelson (D-Florida) on Monday attacked the House version of NASA’s budget that required the agency to make a quick decision on its commercial manned launch company.

Senator Bill Nelson (D-Florida) on Monday attacked the House version of NASA’s budget that required the agency to make a quick decision on its commercial manned launch company.

Nelson faces a difficult election campaign from the right. Thus, I suspect he has realized that he is better off promoting free enterprise than local pork. It is unfortunate that the Republicans in the House haven’t yet realized this.

The assembly of the first test vehicle of XCOR Aerospace’s Lynx suborbital craft has begun.

The competition heats up: The assembly of the first test vehicle of XCOR Aerospace’s Lynx suborbital craft has begun.

I will admit to great deal of skepticism about this particular space company. Somehow XCOR always manages to get a great deal of coverage in the space community press, despite what I see as lack of any actual space-related results.

I could be wrong however, and if so, I will be the first to celebrate. This article suggests they might finally start test flights by the end of this year.

SpaceShipTwo to resume flight tests in June after a nine month hiatus.

SpaceShipTwo to resume flight tests in June after a nine month hiatus.

The long pause in flight tests, as well as the apparent delays in flying the ship with its rocket engine, suggest that there have been engineering issues with the ship and engine that Scaled Composites hasn’t revealed. Hopefully the resumption of testing is an indication that these issues have been overcome.

ATK today announced that it is building its own manned capsule for its Liberty solid rocket.

The competition continues to heat up: ATK today announced that it is building its own manned capsule for its Liberty launch system.

The capsule’s first two flights are scheduled in 2014, both abort tests, followed in 2015 by an orbital flight and, finally, a crewed orbital flight. The spacecraft is designed for ten flights each, and ATK plans to build a minimum of four capsules. All flights will be launched by the Liberty launcher, and ATK is not actively exploring adapting the capsule for other [launch vehicles].

Liberty is based on the upgraded shuttle solid rocket boosters that were developed for the Ares rocket, now cancelled.

An Australian billionaire is building a full scale replica of the Titanic.

Want to relive history? An Australian billionaire is building a full scale replica of the Titanic.

When fully built, the Titanic II will be 270 meters (886 feet) long and capable of holding 1,680 passengers. By modern standards, this is actually fairly small for a cruise ship, especially when compared to newer passenger liners like the behemoth Oasis of the Seas, which measures 360 meters (1,180 feet) long and can hold 5,400 guests.

The Titanic II is set to make the same maiden voyage as the original, traveling from England to New York, by late 2016.

SEC documents have revealed that the total development costs for Orbital Sciences’ Antares rocket have increased to $472 million, $184 million more than what NASA is paying them.

SEC documents have revealed that the total development costs for Orbital Sciences’ Antares rocket have increased to $472 million, $184 million more than what NASA is paying them.

That the company has been willing to commit these extra funds to develop Antares suggests to me that they see a commercial value for the rocket that will exceed these costs. Or to put it more bluntly, they see a market for their rocket that will pay for their investment, and then some.

Killing private space

The financial foolishness in Congress, by Republicans this time, continues. In making its budget recommendations for NASA, the report [pdf] of the House Appropriations Commerce, Justice, Science, and Related Agencies subcommittee also demands that NASA immediately choose one commercial company for its commercial space program. (Hat tip to Clark Lindsey for spotting this.)

The number of ways this action is counter-productive almost can’t be counted.
» Read more

To mine the asteroids, first build small cheap space telescopes.

To mine the asteroids, first build small cheap space telescopes.

The space telescope will be based on the same design Planetary Resources will eventually use for its asteroid-prospecting spacecraft: a 30-kilogram to 50-kilogram flier packed with imaging sensors and a laser-optical communication system the company is developing to avoid encumbering its spacecraft with large antennas. The company, which says it has about two dozen employees, will market these spacecraft as cheap but effective telescopes for both astronomical and Earth-observing applications. Sales would provide cash for the company’s core work on asteroid mining, Eric Anderson, co-founder and co-chairman of Planetary Resources, said.

The telescope slated for launch sometime in the next two years “would be something, let’s say, a university buys [for astronomical observations], or a commercial company that wants to monitor shipping traffic or something like that,” Anderson said in a phone interview. The cost for the telescope, which Planetary Resources is calling Arkyd-101, would be “millions of dollars, including launch.”

At the Planetary Resources press conference today, there was a lot of talk about the benefits and profits to be gained from mining the asteroids. However, this ain’t gonna happen for quite a few years. In the meantime, the company plans to make money building space telescopes which scientists and others can use, for a fee, to do research.

In other words, the government and astronomers dropped the ball on replacing the Hubble Space Telescope. Now, private enterprise is going to pick it up and run with it.

1 241 242 243 244 245 259