NASA selects experiments it wants to put on commercial lunar spacecraft

Capitalism in space: NASA has selected a dozen experiments/instruments it wants to put on private commercial lunar spacecraft, either landers or rovers.

According to the press release, some of these could fly as early as before the end of this year. If so, I suspect they will go on one of the finalists for the Google Lunar X-prize, some of whom are planning to fly this year.

Even as NASA announces schedule for SpaceX Dragon test flight, anti-American forces at NASA work to block that flight

There were two stories today impacting the future of American manned spaceflight. The first is positive, the second is downright hostile to that effort, and could literally be called treasonous by some.

The first story outlines in detail NASA’s press coverage and schedule leading up to and including the March 2nd SpaceX unmanned Dragon test flight. The key event will be the flight readiness review on February 22nd. NASA will televise a post review press conference no earlier that 6 pm (Eastern) that night. That review will determine whether the flight goes on March 2nd.

That NASA has made this announcement indicates that the agency is slowly being dragged, kicking and screaming, into allowing the test flight to finally happen, after years of bureaucratic delay.

The second story illustrates some of the ongoing kicking and screaming that is still going on inside NASA. It is also more disturbing. As far as I can tell from the story, some of the anti-American forces within NASA’s bureaucracy teamed up with Reuters today to publish this hit piece on the manned capsules of both SpaceX and Boeing.

Two people with direct knowledge of the program told Reuters that the space agency’s concerns go beyond the four items listed, and include a risk ledger that as of early February contained 30 to 35 lingering technical concerns each for SpaceX and Boeing. Reuters could not verify what all of the nearly three dozen items are. But the sources familiar with the matter said the companies must address “most” of those concerns before flying astronauts and, eventually, tourists to space. [emphasis mine]

Note that these are anonymous sources. Note that their attack, a bunch of unsubstantiated leaks, is directly aimed at discrediting the efforts of both companies. Note also that if they succeed the ultimate and only benefactor will be Russia, since NASA will then be forced to buy more Soyuz flights from them, on a rocket that has recently had a launch failure and in a capsule that someone in Russia actually sabotaged during assembly.

The last highlighted phrase, suggesting that NASA is going to use its power to block the ability of these free American companies from privately selling tourist flights on their capsules, is even more egregious. Once again, the only benefactors of this action would be the Russians, who will then be able to grab that tourist business.

It is for these reasons I call these sources, with the help of Reuters, anti-American.

Moreover, the issues that are outlined in this article are very dubious, to put it mildly. Suddenly, after years of reviews that never mentioned any issues with SpaceX’s parachutes as well as seventeen successful parachute test flights, NASA has suddenly deemed that the parachute design has “some design discrepancies.”

As for Boeing, the article mentions the valve leak failures during a engine test last year. In response Boeing has had the valves redesigned and reordered, but they still need further testing. While this is a legitimate issue, I suspect it is being used here as a sledge hammer against this American company, not as an issue that requires intelligent review.

Where is our “America-First” president in all this? Political forces in Washington and within NASA are actively working to block our country’s effort to fly in space, for the benefit of a foreign power. Why isn’t Trump doing something about this?

NASA to put humans on the Moon soon!

Wanna bet? According to NASA officials, the agency is accelerating its manned effort and expects to return to the Moon with humans by 2028 at the latest!

Jim Bridenstine, NASA’s administrator, told reporters Thursday that the agency plans to speed up plans backed by President Donald Trump to return to the moon, using private companies.

“It’s important that we get back to the moon as fast as possible,” said Bridenstine in a meeting at NASA’s Washington headquarters, adding he hoped to have astronauts back there by 2028.

“This time, when we go to the Moon, we’re actually going to stay. We’re not going to leave flags and footprints and then come home to not go back for another 50 years” he said.

Why does this announcement remind me of similar enthusiastic predictions made by Russia’s space agency, Roscosmos, all of which have never come true? In fact, why does Bridenstine’s prediction remind me of many past NASA predictions since the 1980s, all of which either never happened, or happened decades behind schedule and in a manner that was far from grand?

If NASA is the agency to run this program, this prediction will not happen, period. For NASA to get back to the Moon by 2028 would require them to somehow build Gateway (which Bridenstine labels as a key component in this program) while also accelerating the launch schedule of SLS, a rocket NASA has spent fifteen years building that it doesn’t expect to launch for at least two more years, and will not put humans on it until 2024, at the earliest.

Gateway has not even been funded. It provides no way to get to the lunar surface. If it is funded it will cost billions, and likely take as long to build as SLS. SLS itself is expensive, unwieldy, and incapable of providing launch services for such an ambitious program.

Bridenstine’s announcement though did contain a ray of hope. He and his associates made a big deal about how they wish to hire many different private companies to achieve their goals. If the agency gets out of the way and lets free Americans do the job, then maybe it will happen.

We shall see. NASA’s track record when it comes to letting privately-built manned commercial spacecraft do the job is dismal, and that’s being kind.

Rather than use American manned capsules, NASA is considering buying more Soyuz astronaut flights

Because of the delays imposed by its safety panel in the development of two American-made manned capsules, NASA is now considering buying more Soyuz astronaut flights from Russia.

Past experience has shown the difficulties associated with achieving first flights on time in the final year of development. Typically, problems will be discovered during these test flights. The consequences of no US crew on ISS warrant protection by acquiring additional seats. The absence of U.S. crewmembers at any point would diminish ISS operations to an inoperable state,” noted a procurement document published on February 13.

NASA is considering contracting with the State Space Corporation “Roscosmos” for these services on a sole source basis for two (2) Soyuz seats and associated services to the International Space Station (ISS) on the Russian Soyuz spacecraft vehicle. This transportation would be for one crewmember in the Fall of 2019 and one crewmember in the Spring of 2020.

Remind me again: What country does NASA work for? From this I think it is Russia, not the United States. The agency has no problem putting its astronauts on a Soyuz rocket, even though Russia has had chronic quality control problems that not only caused a Soyuz launch abort last year but also had someone drill a hole in a manned capsule, an act of sabotage that Russia has still not explained or solved.

Meanwhile, it slow-walks and delays in any manner it can the manned efforts of two American companies, so that it is forced to use Russian rockets. This is unconscionable. Where is Trump, the “America-First” guy? Why isn’t he stepping in and putting an end to this political gamesmanship that clearly favors a foreign power over American companies?

SpaceX protests NASA launch contract to ULA

Turf war! SpaceX has filed a protest against a NASA launch contract award to ULA for almost $150 million for the Lucy asteroid mission in 2023.

In a statement, SpaceX, the California company founded by Elon Musk, said it was the first time it had challenged a NASA contract.

“SpaceX offered a solution with extraordinarily high confidence of mission success at a price dramatically lower than the award amount,” the company said in a statement to The Washington Post. “So we believe the decision to pay vastly more to Boeing and Lockheed for the same mission was therefore not in the best interest of the agency or the American taxpayers.”

This protest might explain the politics of two other stories recently:

In the first case two California politicians are using their clout to pressure the Air Force for the benefit of SpaceX. In the second the Air Force inspector general office is using its clout to pressure the Air Force to hurt SpaceX.

All these stories illustrate the corrupt crony capitalism that now permeates any work our federal government does. In order to get government business, you have to wield political power, which means you need to kowtow to politicians and bureaucrats. Very ugly, and very poisonous.

NASA extends Soyuz contract to maintain ISS presence through 2020

Faced with self-imposed delays of the launch of the privately-built manned capsules of Boeing and SpaceX, NASA has now arranged to stretch out the launch schedule of its last few Soyuz manned missions in order to maintain a presence on ISS.

According to Russian sources:

“The following scheme is planned for now: two NASA astronauts will remain on the ISS for nine months instead of the usual six. So, Nick Hague starts his mission on March 14 [2019] on the Soyuz MS-12 and returns to Earth on 18 December on the Soyuz MS-13, while Andrew Morgan will travel to the orbital station on Soyuz MS-13 on 6 July and will return on Soyuz MS-15 in April 2020″, the source said.

In the end it does appear that NASA can no longer slow-walk these American commercial manned capsules. When April 2020 rolls around, they must be operational or we will have no astronauts on board our own space station.

NASA’s political and corrupt safety panel

After spending the last few years complaining about certain specific issues with the manned capsule efforts of SpaceX and Boeing, NASA’s safety panel this past weekend released its annual 2018 report. (You can download the report here [pdf].) Its position now on those certain specific issues can now be summarized as follows:

They make no mention of the parachute issues that forced Boeing to do numerous extra tests, causing probably a year delay in the program, though Boeing has had decades of experience with capsule parachutes and the entire American aerospace industry has never had a parachute failure.

The panel also admits that their concerns about SpaceX’s rocket fueling procedures is really not an issue.

The NESC [NASA Engineering and Safety Center] has independently studied the load and go procedure and provided a thorough report that identifies the hazards and available controls. Based on the NESC report, the CCP [Commercial Crew Program] has decided that the load and go concept is viable if subsequent analysis is adequate and if verifiable controls are identified and implemented for all the credible hazard causes that could potentially result in an emergency situation or worse.

As Emily Litela said, “Never mind!” Their concerns were never credible, as it really doesn’t matter if you fuel the rocket before or after the astronauts board, because in either case they are there when a lot of fuel is present. All the panel did was delay the first Dragon launch by at least a year by pushing this issue.

The panel is still holding onto its concerns about the installation blankets (COPV) used in SpaceX’s internal helium tanks, the location of the problem that caused the September 2016 launchpad explosion. Despite SpaceX’s apparent fixing of this problem, with 40 successful launches since that failure, they are listing further vague requirements:
» Read more

NASA to avoid SLS delays should another shutdown occur

Faced with an impending second government shutdown mere days away, NASA has been moving to avoid any delays in an upcoming planned Orion/SLS launch abort test should another shutdown occur.

What I find most fascinating about this article is how different the attitude seems to be at NASA between this SLS/Orion test flight and SpaceX’s Dragon test flight. With SpaceX, NASA has apparently made no effort to figure out ways for the test to go forward during the shutdown, even though the launch would be run by SpaceX employees on a SpaceX launchpad, and would only require NASA employees who are all considered essential.

With this Orion abort test, however, they have been and are planning to do everything they can to bypass the shutdown. Like SpaceX, the Air Force was free to operate during the shutdown, because its budget had already been approved.

“Then the shutdown kept going so I said ‘boy, let me see what I can do with these Air Force pieces.’ And it was very interesting, I had to work with lawyers here at Kennedy and Johnson [Space Center],” explained [Mark Kirasich, NASA Orion Program Manager.]

“The Air Force was not shut down, it was only NASA. So you had to write the legal justification — ‘hey the Air Force is not shut down, this is important work to do in this building’ and we were eventually able to allow the Air Force to get access to the buildings, if that makes sense.”

“And then the very last piece which was the NASA piece,” he continued. “Now of course NASA was shut down, that was the hardest thing to get exempted and I was working on that piece right when the government on that Friday night signed that continuing resolution, but I was confident I would get that piece going again had the shutdown continued.”

The contrast is most striking. It almost makes you think that NASA is purposely using any excuse to slow-walk SpaceX’s effort.

First SLS launch faces more delays

No surprise here: The scheduled June 2020 first unmanned launch of NASA’s Space System Launch (SLS), already delayed by three years, appears threatened by more delays.

[NASA needs to perform]a similar structural test of the liquid oxygen fuel tank before what is known as a “green run” test. For this exercise, NASA will assemble the two large tanks and then integrate them with the rocket’s four main RS-25 engines. Then, at a test stand in southern Mississippi, the rocket will fire its engines through a standard launch of the rocket.

NASA has yet to formally set a date for this “green run” test, but whenever it does occur will be a key indicator for when we will see the first actual launch of the SLS rocket. If the green run test is conducted late in 2019, there would still be a chance for a 2020 launch. However, the agency and its prime contractor for the core stage, Boeing, are on a tight timeline that has little margin for technical problems that might occur during the structural tests of the tank or the green run tests. Historically, during this integration and test process with other large rocket programs, major problems have often occurred.

It is not clear how deeply the shutdown affected the SLS timeline, even though core stage work did proceed. “The shutdown impacted at least day for day,” one source said of the schedule. “But I am sure it was more than that.”

NASA originally planned to launch the SLS rocket on its maiden flight in November 2017, so the rocket will now be at least three years later than originally anticipated. The program’s budget is more than $2 billion a year, so these delays have cost the agency considerably.

The article also outlines the problems NASA is having developing the rocket’s upper stage.

I predict that the June 2020 launch will slip, maybe as much as six months, into 2021. This means the first manned flight will also be delayed into 2024, at the earliest.

That means it will have taken NASA more than twenty years and more than $60 billion to build and fly a single manned mission. Moreover, the cost and difficulty of operating SLS will make it impossible to get the second manned flight off the ground any earlier than three to four years later, at the earliest.

There is no chance the U.S. will put new footprints on the Moon if it continues to rely on this boondoggle. Worse, a continued reliance on SLS will force the government, for political reasons, to use its power to squelch competing private efforts, something we are seeing with the endless delays NASA has imposed on the commercial crew program.

A look at SpaceX’s upcoming launch schedule

Link here. It appears that the launch dates for both Falcon Heavy launches depend entirely on when the first Falcon 9 manned Dragon test flight takes place.

With Demo-1 having priority, the final preparations for Arabsat [using Falcon Heavy] will not be able to begin until the Demo-1 launch has occurred as there is only so much space in the Pad 39A hangar. With that in mind, Arabsat 6A will likely occur in the second half of March at the earliest, as NASA announced on Wednesday that Demo-1 is now targeting no earlier than March 2nd, 2019.

While the March 2nd launch date for Demo-1 is still tentative, it is understood that the Space Station’s Visiting Vehicle Schedule does have availability for a launch on that date should the NASA and SpaceX teams be ready.

Once Demo-1 and Arabsat are out of the way, Pad 39A will not be done supporting high profile missions. SpaceX will work to quickly turnaround the first stage boosters from the Arabsat 6A flight in order to reuse them for the STP-2 mission – the second Falcon Heavy launch of the year. STP-2 is a mission for the U.S. Air Force which will feature several technology demonstration payloads. According to FCC filings, the launch is currently scheduled for no earlier than April 30th, 2019. However, since this mission requires boosters from the Arabsat 6A launch, SpaceX will require several weeks between the two flights to refurbish the cores.

Therefore, STP-2 is directly connected to the launch schedule for Arabsat 6A which is in turn connected to Demo-1’s schedule. Consequently, the odds of a slip with STP-2’s date are high, as two major dominos currently stand in front of it.

In addition, the date for SpaceX’s launch abort test of Dragon depends entirely on the completion of the Demo-1 flight, since they plan to use that same capsule in the abort test.

Though there are a handful of other launches described in the article through April, but much of SpaceX’s schedule for the spring depends entirely on whether NASA can get off its duff and allow the Dragon test mission to fly. If NASA continues to drag its feet, everything else will get delayed. It would seem that at some point SpaceX might even have the right to demand financial compensation from NASA for the loss of income NASA is causing it. They don’t get paid for any of these launches until they fly, and thus NASA is preventing them from earning money from other customers.

Sunspot update January 2019: The early solar minimum

As I have done every month since 2011, I am now posting NOAA’s the monthly update of the solar cycle, covering sunspot activity for January 2019. They posted this update on Monday, and I am posting it below, annotated to give it some context.

January 2019 sunspot activity

The graph above has been modified to show the predictions of the solar science community. The green curves show the community’s two original predictions from April 2007, with half the scientists predicting a very strong maximum and half predicting a weak one. The red curve is their revised May 2009 prediction.

January saw a slight uptick in sunspot activity, but the overall activity remains comparable to mid-2008, when the last prolonged solar minimum began. If you go to my October 2018 update, you can see the graph when it included data going back to 2000 and see the entire last minimum.

That last minimum started in the last half of 2007, and lasted until mid-2009, a full two years. If you look at the red line prediction of the solar science community, it appears that they are expecting this coming minimum to last far longer, almost forever. I expect this is not really true, but that they have simply not agreed on a prediction for the next cycle. Some in that solar science community have hypothesized that we are about to enter a grand minimum, with no sunspots for decades and thus no solar maximum. Others do not agree.

Since neither faction really understands the mechanism that causes these sunspot cycles, there is no way now to determine what will happen, until it does so. What we do know from climate data is that the Earth cools when the Sun is inactive. Why remains unclear, though there is at least one theory, with some evidence, that attempts to explain it.

And despite the untrustworthy claims of NOAA and NASA scientists that the last few years have been hot, experience on the ground disputes this. Their data has been adjusted (tampered if one wants to be more blunt) to make it fit their global warming theory. The raw unadjusted data suggests things have instead cooled, which better fits with the brutal winters Americans experienced for the past decade or so.

If the Sun does enter a grand minimum in the coming decades, I suspect it will become increasingly difficult for NOAA and NASA to continue their temperature adjustments and continue claiming things are getting warmer. At a minimum, we will learn something about the Sun and its behavior and its influence on the climate that we never knew before.

NASA confirms new Dragon launch date

Confirmed: NASA today announced a new launch date, March 2, for the first unmanned test flight of SpaceX’s manned Dragon capsule.

The agency now is targeting March 2 for launch of SpaceX’s Crew Dragon on its uncrewed Demo-1 test flight. Boeing’s uncrewed Orbital Flight Test is targeted for launch no earlier than April.

These adjustments allow for completion of necessary hardware testing, data verification, remaining NASA and provider reviews, as well as training of flight controllers and mission managers.

This is actually the first time that NASA itself has specified a launch date, which suggests to me that they finally have admitted that they cannot hold things up any longer. Based on this announcement and assuming the weather and everything else cooperates, the launch will likely happen then, which will also allow time for SpaceX to get the launchpad reconfigured for its Falcon Heavy launch a week later.

The announcement also listed the remaining test schedule for commercial crew, as it stands now:

  • SpaceX Demo-1 (uncrewed): March 2, 2019
  • Boeing Orbital Flight Test (uncrewed): NET April 2019
  • Boeing Pad Abort Test: NET May 2019
  • SpaceX In-Flight Abort Test: June 2019
  • SpaceX Demo-2 (crewed): July 2019
  • Boeing Crew Flight Test (crewed): NET August 2019

The manned flights have not been pushed back significantly from the dates that NASA announced in October, June for SpaceX and August for Boeing. I would expect that the delays now will force these dates to get delayed as well.

NASA delays unmanned test of manned Dragon again

While not yet confirmed, industry rumors for the past twenty-four hours are saying that NASA has once again forced a delay in the launch of SpaceX’s unmanned test of manned Dragon, pushing it back into March.

I have linked to one article, but I have been hearing these rumors from a number of sources.

This delay, if true, will cause SpaceX scheduling problems in numerous ways. First, it will conflict with the second Falcon Heavy launch, presently planned for March using the same launchpad. Second, it forces a pushback on the manned Dragon launch. Because SpaceX will use this capsule to fly its launch abort mission, it needs at least three months to prep this capsule for its reuse. Assuming that is a success, it will then need three more months to assess that launch abort flight and prepare for the manned flight. This means the manned flight cannot happen prior to October.

Why the delays? Nowhere in this article or in any of the rumors I have heard has any real reason been given. The article says the following, with the important words highlighted:

As of the first week of December 2018, SpaceX was reportedly planning towards a mid-January 2019 launch debut for Crew Dragon. By the end of December, DM-1 was no earlier than the end of January. By the end of January, DM-1 had slipped to from late-February to NET March 2019. Put in slightly different terms, SpaceX’s Crew Dragon launch debut has been more or less indefinitely postponed for the last two months, with planning dates being pushed back at roughly the same pace as the passage of time (i.e. a day’s delay every day).

Admittedly, DM’s apparently indefinite postponement may well be – and probably is – more of an artifact than a sign of any monolithic cause. While the US government’s longest-ever shutdown (35 days) undoubtedly delayed a major proportion of mission-critical work having to do with extensive NASA reviews of SpaceX and Crew Dragon’s launch readiness (known as Readiness Reviews), much of the 60+ day DM-1 delay can probably be attributed to the complexity of the tasks at hand. Being as it is the first time SpaceX has ever attempted a launch directly related to human spaceflight, as well as the first time NASA has been back at the helm (more or less) of US astronaut launch endeavors in more than 7.5 years, significant delays should come as no surprise regardless of how disappointing they may be. [emphasis mine]

The first paragraph above outlines the endless delays that appear to me to be entirely caused by NASA’s endless review process, much of it designed solely to delay things, for political reasons. SpaceX has clearly been ready to launch since December. Moreover, NASA is somewhat irrelevant to this launch, as it is run by a SpaceX launch team on a SpaceX-run launchpad. The delays are all paperwork related, imposed by NASA bureaucrats hostile to this commercial private spacecraft because it is showing the world NASA’s own inability to build its own manned rocket and spacecraft, SLS/Orion.

These NASA bureaucrats are clearly putting their own interests ahead of the interests of the nation. While they play petty political games with this launch, their delays risk putting us in the position next year of having no way to ferry our own astronauts to and from our own space station. The contract with Russia runs out this year, and Russia has said that it would be very difficult for them to quickly schedule more flights beyond that.

Meanwhile, what is Trump doing? Nothing. He is allowing this, even though he has the power to prevent it.

Unmanned test flight of manned Dragon delayed again?

SpaceX has applied for a new launch license from the FAA for its unmanned test flight of its manned Dragion capsule that sets the launch date as no earlier than March 2nd.

This does not necessarily mean the launch is delayed until then. As noted by commenter Kirk Hilliard here at Behind the Black, “their previous license was valid through 1 March, so they may just be covering their bases here while still planning on launching under the authority of their previous license.”

Regardless, I have seen nothing to change my opinion about the cause of these delays: the NASA bureaucracy. SpaceX has been ready to do this launch since December. It has already done two successful launch rehearsals, one in which they did a successful static fire test, as is standard for the company. Both illustrate their readiness. The launch would use their leased launchpad using their launch crew. There has been no indication of any technical reason for the delays, other than a demand that SpaceX complete paperwork for NASA and the government shutdown (which has not prevented other launches from government facilities).

ULA gets launch contract for Lucy asteroid mission

Capitalism in space: NASA has awarded ULA a $145 million contract to launch the Lucy asteroid mission on its Atlas 5 rocket.

The price is high for such a launch in today’s market, and is even higher than the cost of some recent military launches, which routinely tack on extra requirements that cause the price to rise. I wonder why. Is it because NASA doesn’t care how much it spends? Or is there a political component here, providing a contract to a company that is having trouble winning contracts in the private sector because their price is too high?

It could be that the mission requires things from the launch that add to the cost. The press release mentions that it “includes the launch service and other mission related costs” but does not specify what they are.

NASA pulls astronaut for medical reasons from Boeing manned flight

NASA has switched one member of the planned astronaut crew for the first manned Boeing Starliner mission presently scheduled in August because of medical reasons.

Eric Boe, one of three astronauts assigned to the first piloted test flight of a Boeing CST-100 Starliner commercial crew ship later this year has been removed from the mission due to unspecified medical issues, NASA announced Tuesday. He will be replaced by veteran astronaut Mike Fincke.

Boe will take over Fincke’s role as assistant to the chief for commercial crew operations in the astronaut office at the Johnson Space Center. In keeping with long-standing NASA policy regarding medical privacy, no details about the reason for Boe’s reassignment were provided.

The article notes that this is only the sixth time in the entire history of American manned space that such a switch was necessary. I hope Boe’s medical issue is not serious, and wish him well with the hope he will be flying on another Boeing or SpaceX flight quite soon.

Though not directly related to this story, to my mind the real question remains: Will NASA’s bureaucracy let this flight happen in 2019? I think it will have no choice, but it will be dragged kicking and screaming to the launchpad.

First unmanned test flight of manned Dragon now set for Feb 9

Capitalism in space: SpaceX’s first unmanned test launch of its manned Dragon capsule, delayed repeated in recent months, has now been scheduled for no early than Feb 9, with its dress rehearsal countdown static fire test set for January 23.

It appears that this scheduled date is more firm than the previous ones, as it was announced as part of the upcoming schedule of the Eastern Range’s planning schedule.

The article provides some interesting details about the effect (or non-effect) the government shutdown on this launch. Bottom line: It should not prevent it, in the slightest. It must be repeatedly noted that the launch will use a SpaceX launch team on a SpaceX run launchpad, and will only require NASA participation during docking procedures, procedures that require NASA employees who have been deemed essential and thus are working (even if unpaid at the moment).

Hubble’s main camera in safe mode

The coming dark age: The Wide Field Camera on the Hubble Space Telescope has experienced “an anomaly” that has forced its shut down.

The announcement is a mere one paragraph long, and provides no further information.

This camera was installed on the space telescope during the last shuttle mission in 2009. It is now almost a decade since that mission, which was expected to extend Hubble’s life for at least five years. It is therefore not surprising that things are beginning to fail. In October they had a serious gyroscope problem when a gyroscope failed and they had problems getting their last back-up gyroscope to work. They got it working, but this has left us with a telescope with no gyroscope backups. With the next failure they will have to shift to one gyroscope mode, meaning sharp images will no longer be possible. Now the main camera has shut down.

Unfortunately, it appears that we are reaching the end of Hubble’s life span. The sad thing is that this shouldn’t be necessary. It can be repaired, but this would require a robot mission, something that would have been very difficult a decade ago but is quite doable at a reasonable cost today. No such mission is being considered however.

Even worse, the bad planning that is routine for our modern intellectual class has left us with no replacement, for the foreseeable future. In the late 1990s the astronomy community chose this path, deciding to replace Hubble with an infrared space telescope, the James Webb Space Telescope. They and NASA also decided to push the limits of engineering with Webb, resulting in a project that is about a decade behind schedule with a budget that has ballooned from $1 billion to $9 billion. Meanwhile, there has been no money for any other major space telescopes. And the one the astronomy community proposed in 2011, WFIRST, is already over budget and behind schedule, in its design phase.

The astronomy community has also decided in the past two decades that it could replace Hubble with giant ground-based telescopes, a decision that has so far proven to be problematic. Though adaptive optics can eliminate some of the fuzziness caused by the atmosphere, it limits observations to very narrow fields of view, meaning it cannot obtain large mosaics of big objects, such as this Hubble release earlier this week of an image of the nearby Triangulum Galaxy. Moreover, almost all of the giant ground-based telescopes built so far have struggled with many engineering issues.

In terms of astronomy, we are thus about to go blind, returning to the days prior to the space age when our view of the heavens was fuzzy and out of focus.

Unmanned test flight of manned Dragon delayed again

Elon Musk has now confirmed that the first unmanned test flight of the manned Dragon capsule has been delayed, and is now scheduled for sometime next month.

SpaceX is about a month away from launching its first commercial crew mission, the company’s founder, Elon Musk, tweeted this weekend. This will be a demonstration flight, without humans on board.

Officially, NASA had been holding to a January 17 launch date, but that has become untenable due to ongoing work to resolve technical issues, two sources said, as well as the partial government shutdown. More than 90 percent of the space agency’s employees are presently furloughed during the shutdown, which is affecting the agency’s ability to make final approvals for the launch. Some key government officials are continuing to work on the program without pay.

As far as I can tell, the “technical issues” are bureaucratic maneuvers by NASA designed solely to delay the launch. The article makes a big deal about the risks of this first test flight, as if none of its systems have ever flown before. That is absurd, While Dragon has been significantly modified, this can hardly be called a first flight for this capsule or rocket.

I repeat: The launch will occur on a SpaceX launchpad, run entirely by SpaceX employees. The only time NASA employees need get involved is during the docking procedures, and right now those employees at mission control and on ISS have been deemed essential and are working. If Trump ordered it, this mission could fly, even during this partial government shutdown.

SpaceX rolls manned Dragon/Falcon 9 to launchpad

Capitalism in space: This week SpaceX rolled to the launchpad the stacked manned Dragon capsule and Falcon 9 rocket that will fly the first unmanned test flight no early than January 17, 2019.

it is understood that the rollout is a dry simulation and thus will not include any propellant. However, a static fire test including propellant load and a short burn of the first stage’s nine Merlin engines will occur at a later date.

While this week’s rollout and subsequent fit checks do not seem to have been impacted by the ongoing U.S. government shutdown, other aspects of the launch campaign will be delayed.

The launch is expected to slip past the latest official no-earlier than launch date of January 17th. Many aspects of the launch campaign require NASA oversight and thus cannot proceed without NASA’s approval. It is understood that each additional day of the government shutdown translates into about a one day delay with the launch.

The irony here is that there are really no NASA employees required for SpaceX to do the launch. It is occurring on their leased property using their equipment and their launch team. Only when the capsule arrives at ISS will NASA employees be required, and those slots have been deemed “essential” in this government shutdown and are still operating on ISS and at mission control in Houston.

If Trump ordered it, this flight could happen. SpaceX is clearly ready. It is only NASA and its bureaucracy that stands in the way.

Nancy Roman passes away at 93

R.I.P. Nancy Roman, NASA’s first chief astronomer, died on Christmas at the age of 93.

Her name is largely forgotten, but her support for building the Hubble Space Telescope in the 1960s and the 1970s was critical in getting it done. As important, her support for all in-space astronomy in these early years eventually made it possible. During her term NASA built and launched the first space telescopes. Some were duds. Some were incredible successes. Regardless, her leadership proved that astronomy in space made sense, leading to the achievements that have followed in the half century that has followed.

God speed, Nancy Roman.

NASA approves Dream Chaser design

Capitalism in space? Sierra Nevada has, after several years of work, obtained NASA’s approval of the design of its Dream Chaser mini-shuttle, and will now begin construction.

I put a question mark in the header above because I am no longer sure Sierra Nevada is building a privately designed and privately owned spacecraft for the launch market. It seems that they have been captured entirely by NASA, and will instead be building the spacecraft NASA wants, which might raise costs enough to make this vehicle unaffordable for other customers.

The situation is understandable. Sierra Nevada does not have the independent capital that gives SpaceX its independence. It needs NASA to get this ship built, and thus will do whatever NASA demands. I just worry that NASA, unconcerned about cost (as is every agency in the federal government today), will spoil Dream Chaser’s viability in the commercial market.

Rocket Lab completes its third successful launch in 2018

Capitalism in space: Rocket Lab today (Sunday) successfully launched thirteen cubesats using its Electron rocket.

With this third launch, Rocket Lab now has more launches than Northrop Grumman (formerly Orbital ATK), a launch operation that has been around since the 1980s.

The leaders in the 2018 launch race remain unchanged:

35 China
20 SpaceX
13 Russia
10 Europe (Arianespace)
8 ULA

China still leads the U.S. 35 to 33 in the national rankings.

NASA’s warped measure of safety

In posting an invitation to social media users to attend the launch of the first unmanned test flight of SpaceX’s man-rated Dragon capsule on January 17, 2019, NASA’s public relations department added the following warning:

NASA has a series of reviews before the uncrewed test flight, and the outcome of these reviews, including the Flight Readiness Review, will ultimately determine the Demo-1 launch date.

For months I have reported numerous examples of NASA’s safety panel acting to create fake problems that will force a delay in this launch. First it was the fueling method. Then it was the insulation on the helium tanks. Then there was the need for SpaceX to fill out all the paperwork. Now it is the parachute system and worries about the safety culture at SpaceX.

I might take these concerns seriously, except that NASA’s safety panel seems to be so sanguine about far more serious safety issues with NASA’s SLS rocket and Orion capsule. This double standard is starkly illustrated once again in this NASASpaceflight.com article about NASA’s plans for the very first manned Orion/SLS mission.

On that manned mission, NASA will fly a host of new equipment for the first time. For example, the capsule’s “Environmental Control and Life Support System (ECLSS), crew displays, and other crew systems will be making their debut in Orion.” Anything else that has flown previously will essentially have done so only once, during the first unmanned test flight of SLS/Orion.

It gets worse. While NASA has demanded SpaceX fly the final manned version of its Falcon 9 rocket seven times before it will allow its astronauts on board, the agency plans to launch humans on SLS on only its second launch. More astonishing, that second launch will include a mission taking those astronauts on a loop around the Moon.

During the Apollo missions in the 1960s, NASA had a policy that no mission would head to the Moon without carrying a lunar module (LM). The logic was that the LM would act as a lifeboat should something go wrong with the Apollo capsule, a logic that was actually proven during Apollo 13.

NASA did send Apollo 8 to the Moon without the LM, but it did so in the context of a Cold War space race and an end-of-the-decade commitment by an assassinated president. The agency then knew the risks were high, but it decided the situation justified those risks.

NASA is not faced with a Cold War space race today. Instead, it has a grossly over-budget and long delayed boondoggle called SLS/Orion, increasingly embarrassed by the quick and efficient achievements of private space companies. In a desperate effort to keep that boondoggle alive, the agency is apparently pushing it to fly it too soon and with inadequate development. In fact, it appears to me that the safety culture at NASA that caused both shuttle accidents (a desire to favor frequent launches while ignoring safety analysis) has returned at NASA, and it has done so with a vengeance.

Meanwhile, the contrast with how the agency’s safety panel treats SpaceX versus SLS/Orion demonstrates how corrupt and unreliable that safety panel has become. They no longer really work to reduce risk. Their goal appears to promote government-built rocket systems over those manufactured by the private sector.

Hat tip to Kirk Hilliard for pointing out the language in the NASA pr invite to the SpaceX launch.

NASA commits $2.6 billion for commercial lunar exploration

NASA today announced that it has committed $2.6 billion over the next ten years to buy delivery services to the Moon for its unmanned scientific missions, provided from nine different private companies.

The companies selected — Astrobotic Technology, Deep Space Systems, Draper, Firefly Aerospace, Intuitive Machines, Lockheed Martin Space, Masten Space Systems, Moon Express, Orbit Beyond — cover a range of companies from the well established to new companies not yet proven. This announcement essentially permits them all to bid on providing NASA delivery services to the moon for small unmanned probes. The press release states that:

These companies will be able to bid on delivering science and technology payloads for NASA, including payload integration and operations, launching from Earth and landing on the surface of the Moon. NASA expects to be one of many customers that will use these commercial landing services.

More information here. UPDATE: Doug Messier has published the press releases from most of the above companies, describing their individual projects, and I have added links to each.

The program appears modeled after NASA commercial cargo and crew programs, whereby the companies will own and control the orbiters, landers, and rovers they build, allowing them to market them to others for profit. It also appears designed to keep costs low, as did commercial cargo program. NASA is merely the customer.

This is good news. It suggests that the American space industry is continuing to transition away from big government programs, controlling everything, to a robust private industry that is in charge with the government merely one out of many customers.

Date set for first unmanned launch of manned Dragon

Capitalism in space: NASA announced today that SpaceX has set January 7, 2019 as the launch date for its first unmanned test flight of its manned Dragon capsule.

SpaceX is targeting Jan. 7 for launch of its first Crew Dragon commercial ferry ship on an unpiloted test flight to the International Space Station, NASA announced Wednesday, a major milestone in the agency’s drive to end its sole reliance on Russian Soyuz crew ships for carrying astronauts to orbit.

If the shakedown flight goes smoothly — and if a NASA safety probe unveiled Tuesday doesn’t turn up any show stoppers — SpaceX could be ready to launch the first piloted Crew Dragon atop a Falcon 9 rocket in the June timeframe, carrying veteran NASA astronauts Robert Behnken and Douglas Hurley to the space station. [emphasis mine]

As I said during a taping today for my appearance on WCCO radio tomorrow at 11:10 am (Central), the only thing standing in the way of SpaceX getting its manned capsule off the ground is NASA. June is a long time from now, and the agency, egged on by corrupt politicians, could easily find ways to delay that first manned launch in that time. Nor would I put it past the corrupt Washington in-crowd, led by Senator Richard Shelby (R- Alabama), having no interest in the national interest, to do what they can to sabotage that flight. What they care about is diverting tax dollars to either their own pockets or to the pockets of their allies (which also helps bring them pay-offs campaign contributions as well).

Still, it is encouraging that SpaceX is pushing forward, and that there appear to be strong elements in NASA supporting them. Keep your fingers crossed.

NASA opens safety review of Boeing and SpaceX

Turf war! Prompted by Elon Musk’s single hit of marijuana during a podcast interview, NASA has begun a detailed safety review of both SpaceX and Boeing.

[William Gerstenmaier, NASA’s associate administrator for human exploration,] said the review would focus not on the technical details of developing rockets and spacecraft but rather the companies’ safety culture — encompassing the number of hours employees work, drug policies, leadership and management styles, whether employees’ safety concerns are taken seriously, and more.

“Is the culture reflective of an environment that builds quality spacecraft,” Gerstenmaier said. The review would be led by NASA’s Office of Safety and Mission Assurance, which has conducted similar probes inside NASA. Gerstenmaier said the process would be “pretty invasive,” involving hundreds of interviews with employees at every level of the companies and at multiple work locations.

This is a power-play, pure and simple. NASA might claim it cares about safety, but its track record suggests instead that its real motive is to prove to SpaceX that it is in charge, not SpaceX. It rankles NASA’s bureaucracy that they cannot call the shots at SpaceX, and have found themselves embarrassed by its success, compared to the agency’s continuing failures with SLS. Moreover, considering the space shuttle’s unsafe history, NASA’s safety track record and the workplace culture that produced that history is nothing to brag about.

These “invasive” interviews are guaranteed to find workplace issues that NASA will then use as a hammer to take further control SpaceX’s operations, making it less innovative, more expensive, and more bureaucratic. And I see no one in the Trump administration, including Trump, very interested in reining NASA in on these matters.

NASA to hire private lunar probes for future missions

Capitalism in space: Rather than build its own future lunar landers and rovers, NASA is now planning to hire these services from private companies, with missions flying as soon as 2021.

Under a program called Commercial Lunar Payload Services (CLPS), NASA would buy space aboard a couple of launches a year, starting in 2021. The effort is similar to an agency program that paid private space companies such as Elon Musk’s SpaceX to deliver cargo to the International Space Station (ISS). “This a new way of doing business,” says Sarah Noble, a planetary scientist at NASA headquarters in Washington, D.C., who is leading the science side of NASA’s lunar plans.

Scientists are lining up for a ride. “It really feels like the future of lunar exploration,” says Erica Jawin, a planetary scientist at the Smithsonian Institution’s National Museum of Natural History in Washington, D.C. She and other attendees at the annual meeting of the Lunar Exploration Analysis Group in Columbia, Maryland, last week were eager to show NASA why their small experiments would be worthy hitchhikers on the landers.

Several companies, including Astrobotic, Moon Express, and iSpace, are vying to establish a commercial moon market. Buying rides to the moon from launch providers like Rocket Lab, each firm hopes to become the go-to carrier for other companies seeking to prospect the moon for rocket fuel ingredients, or to gather rocks to sell for study. But a contract with NASA is the real prize. Moon Express, for example, has designed the MX-1, a lander roughly the size and shape of Star Wars’s R2-D2. But, “We won’t pull the trigger until we know we have a CLPS award,” says Moon Express CEO Robert Richards in Cape Canaveral, Florida.

The companies selected for CLPS must deliver at least 10 kilograms of payload by the end of 2021, NASA says. It is scrambling to find instruments that are ready to fly. “What do you have sitting on shelf now that you can throw onto the mission immediately?” Noble says. “We’re looking for flight spares, engineering models, student-built projects. It’s a little bit of a weird call for us.” The agency is planning to pay up to $36 million to adapt eight to 12 existing scientific instruments to the initial small landers; by the middle of next decade it aims to build a pipeline of instruments for bigger landers that might also carry rovers.

These are going to small missions with limited lifespans and limited abilities. They will however be cheap, fast, and many. In the end I am certain NASA (and the taxpayer) will get far more bang for the buck.

1 33 34 35 36 37 71