Antares launch set for no earlier than August 22
Orbital ATK has scheduled the first Antares launch since its failure in October 2014 for no earlier than August 22.
Orbital ATK has scheduled the first Antares launch since its failure in October 2014 for no earlier than August 22.
Weather for the next Falcon 9 launch, which will lift a Dragon capsule to ISS at 12:44 AM (eastern) Monday morning, looks excellent.
According to this report, the American-built toilet on the U.S. part of ISS has broken down.
The story has few details, and is based on anonymous sources. Nonetheless, I suspect it is true, as the American toilet has had problems in the past, was originally designed for easy transport up and down from ISS on the space shuttle, and is thus difficult to repair in space.
The competition heats up: Orbital ATK today successfully test fired the solid rocket booster it is building for NASA’s SLS rocket.
This was the booster’s second static fire test, and according to Orbital ATK, now qualifies it for use in the first flight of SLS in 2018.
The competition heats up: NASA has approved plans to launch Restore-L, a robot mission in 2020 to refuel a satellite.
In May, NASA officially moved forward with plans to execute the ambitious, technology-rich Restore-L mission, an endeavor to launch a robotic spacecraft in 2020 to refuel a live satellite. The mission โ the first of its kind in low-Earth orbit – will demonstrate that a carefully curated suite of satellite-servicing technologies are fully operational. The current candidate client for this venture is Landsat 7, a government-owned satellite in low-Earth orbit.
This mission is being spear-headed by the division at the Goddard Space Flight Center that ran the repair missions to the Hubble Space Telescope, as well as the recent robotic refueling demonstrations on ISS. With the success of those demonstrations, NASA has obviously decided to move forward with an actual flight.
NASA scientists have released videos of the fire experiment they ran on Orbital ATK’s Cygnus freighter last week after it was unberthed from ISS.
The videos are at the link. They are not as exciting or as interesting as I think everyone imagined. However, they do confirm that the sample burned for 8 minutes.
Be still my heart: Delivery of the service module for NASA’s Orion capsule, being built by the European Space Agency, will be three months late due to engineering modifications.
Nico Dettman, head of ESAโs space transportation department, said the delay is partly a result of the fact that several components could not yet be assessed in the full critical design review and need more time to be integrated into the design. Dettman said another issue forcing the delay resulted from a reassessment by NASA of the stresses the service module needs to be capable of handling in orbit. These โin-orbit loadโ specifications have recently been tightened. But any design modifications will not affect the service moduleโs core structure, he said. โIf it has an impact, it will be limited to the solar array wings, not the structure โ nothing where flight hardware has been manufactured that we will have to touch,โ Dettman said. โItโs a late modification, but not too late.โ
Note that George Bush proposed Orion in January 2004. The first full up test flight, unmanned, is now scheduled for 2018. Thus, they only had 14 years to build this single capsule and service module.
It took NASA less than five years to build the first Apollo capsule and service module, and less than 8 years to fly seven to the Moon. Damn, it took the Allies less than four years to defeat Germany and Japan in World War II. Yet somehow the big government space programs of NASA and ESA can’t build a single manned capsule in less than 14 years.
Doesn’t anyone but me see something wrong with this picture?
For the past two months I have been very focused on writing what I hope will be a somewhat influential space policy paper for the Center for New American Security, comparing the different approaches the federal government has taken in the past fifteen years toward encouraging a robust launch industry in the United States. Essentially the policy paper, Exploring Space in the 21st Century: How the American space effort since 2000, both private and public, is changing the global aerospace industry, compares the big government rocket launch programs like Orion/SLS and the Air Force’s EELV/ULA with the commercial rocket launch contracts that NASA has signed with companies like SpaceX, Orbital ATK, Boeing, and Sierra Nevada to get cargo and crews up and down from ISS.
The comparison is profound, and is devastating to the supporters of big government programs. Commercial space has literally accomplished ten times more in a third the time for a tenth the cost.
That bears repeating: Commercial space ($4 billion) cost one tenth that of Orion/SLS ($43 billion), took one third the time to go from concept to launch (5 years versus 15 years), and accomplished ten times more (22 rockets/capsules versus 2.5 rockets/capsules). In analyzing these numbers, I also took a close look at why the differences are so profound. Surprisingly, the high cost of Orion/SLS has little to do with its engineering challenges, nor is it caused by any significant overcharges by the contractors. The problem is more fundamental.
The paper also reviews the effect the competition introduced by SpaceX has had on the entire launch industry. Launch costs are dropping and innovation is increasing. This, combined with the lessons learned by NASA in commercial space, suggests that the future of getting into space looks quite bright indeed.
This policy paper should be ready for publication sometime in the next two months. On Monday, however, I will be part of a space policy panel at the Center for New American Security’s annual conference in Washington, DC., where I will give a short overview of my findings to a lot of major players in the upper echelons of the Washington elite community. Their response should be quite interesting.
Thus, I will be traveling to DC this weekend, and am not sure if I will be able to post much on Monday, since I very much wish to attend the entire day’s conference and listen to the other speakers, including Vice President Joe Biden. It is my plan to write about what I see once I get back.
The NASA fire experiment on Cygnus was successfully ignited on Tuesday.
No video or pictures yet, as far as I can tell. All they say so far is that “Saffire-I has been ignited inside the Orbital ATK Cygnus cargo spacecraft and telemetry indicates a burn of the cotton-fiberglass material blend.”
The competition heats up (but not in the way you think): NASA and the United Arab Emirates (UAE) space agency have signed an agreement to cooperate in space research and technology development.
The agreement covers cooperation and collaboration in space science, operational Earth observation and Earth science, aeronautics, space operations and exploration, education, technology, safety and mission assurance, and other areas with potential benefits to all nations.
The two countries will continue to identify additional areas of mutual interest for possible future cooperative programs or joint activities on Earth, in airspace, or in outer space. These activities may include the joint use of aircraft, scientific instruments aboard spacecraft, ground-based research facilities, spacecraft and space research platforms, as well as ground-based antennas for tracking, telemetry, and data acquisition. Additionally, the two countries will aim to collaborate on the creation and implementation of education and public outreach programs and joint workshops, with the goal of facilitating the exchange of scientific data, scientists, engineers, and views and experiences on relevant regulatory frameworks and standards.
The competition here is not between these big space government programs, who are increasingly teaming up, but between the big space government programs and the profitable and uncontrolled private sector. I fully expect there to be more calls for government supervision and licensing of private space, just to control it better. And what better way to leverage that control but to link every big space program in the world together, so that there are no independent efforts?
The competition heats up: NASA has contracted with Blue Origin to use its New Shepard suborbital spacecraft for suborbital research missions.
The company hasn’t actually won any contracts, but is now certified to bid on any of NASA’s suborbital research work, as are Masten Space Systems, Near Space Corporation, UP Aerospace, Virgin Galactic, and World View Enterprise. The difference is that of all these companies, only Blue Origin has a ship built and already flying.
The 30-second static fire engine test of the Antares first stage and new Russian engine has now been scheduled for May 31.
The window for the engine test, or hot fire, is 5 p.m. to 8:15 p.m. EDT. Backup test dates run through June 5. Completion of the test will be noted on the Wallopsโ Facebook and Twitter sites. During the test, the upgraded Antares dual RD-181 rocket engines will fire for 30 seconds at maximum 100% power (thrust) while the first stage of the test rocket will be held down on the pad. The hot fire will demonstrate the readiness of the rocket’s first stage and the launch pad fueling systems to support upcoming flights.
If all goes well, they hope to launch Antares with a Cygnus capsule in early July.
The House appropriations committee has outlined its recommendations for NASA’s 2017 budget.
Like the Senate the House is pushing more money for SLS and is demanding NASA use it to fly two missions to Europa in the early 2020s (likely delaying SLS’s first manned mission), In addition, the House wants NASA to abandon any plans for an asteroid mission and instead go back to the Moon. They also pumped up the planetary program, and express reservations about the manned commercial program.
Finally, in a wonderful example of congressional micro-managing, the committee ordered NASA to begin work on flying an interstellar mission to Alpha Centauri by the 100th anniversary of Apollo 11.
While some of the changes the committee is recommending (increasing planetary research funding for example) make sense, the overall priorities of Congress continue to appear to me to be misplaced. Their continuing emphasis on SLS while questioning commercial space illustrates their focus on pork rather than actual accomplishments. And their continuing effort to micromanage many NASA missions does not bode well for the success of those missions.
There is one takeaway from this House budget recommendation that most news sources are missing: The first manned flight of Orion is almost certainly not flying in 2021. I have seen numerous indicators in the past four months suggesting that NASA is going to delay it, and this budget recommendation’s insistence that NASA use SLS to fly Europa missions in 2022 and 2024 almost guarantees that delay.
My heart be still! Airbus has announced that it is beginning assembly of the first Orion capsule service module.
Considering the cost to build about three Orion flight capsules, about $25 billion, one would think that would be enough to also build the capsule’s service module, especially since this is not cutting edge technology, having already been done with Apollo.
Not however when you are dealing with pork-laden government operations, where the customer, the taxpayer, is a good mark that you can suck for as much money as possible without any bad consequences. Make it sound cool and they will buy it, hook, line, and sinker!
My heart be still! NASA managers are considering moving up the first test flight of SLS two months, from November 2018 to September 2018.
Garbage in, garbage out: Using statistical computer modeling only, NASA today announced that they are certain that almost a third of Kepler’s candidate exoplanets are really exoplanets.
Analysis was performed on the Kepler space telescopeโs July 2015 planet candidate catalog, which identified 4,302 potential planets. For 1,284 of the candidates, the probability of being a planet is greater than 99 percent โ the minimum required to earn the status of โplanet.โ An additional 1,327 candidates are more likely than not to be actual planets, but they do not meet the 99 percent threshold and will require additional study. The remaining 707 are more likely to be some other astrophysical phenomena. This analysis also validated 984 candidates previously verified by other techniques.
This is actually a stupid announcement. They haven’t learned a damn thing from this statistical analysis, but are merely saying that because Kepler found a lot of candidates, a lot of those candidates must be real planets. Worse, NASA is also implying here that confirming some of these candidate exoplanets by hard observations is now really unnecessary, since they can do it statistically.
This smacks of the corruption that has ruined much of climate research, allowing a computer model to replace actual observations. Big mistake. But I also suspect this announcement occurred for the same reasons: NASA wishes to justify its work and its funding, and thus decided to make a big deal about this very minor statistical analysis in order to puff up the discoveries of Kepler, even though there is no reason to do so.
I expect a lot of mainstream news organizations to write big puff pieces extolling this announcement in the coming days, which will once again prove that almost no one in journalism today has the slightest ability to apply their own independent analysis to the press releases they receive.
Doug Messier has posted a detailed analysis of Congressman Jim Bridenstineโs (R-Oklahoma) proposed American Space Renaissance Act (ASRA) that is definitely worth reading.
Most of the changes appear aimed at organizing the regulation process of commercial space more completely under FAA control, rather than the hodge-podge of agencies that presently have responsibility. The bill also encourages NOAA and NASA to increase their use of commercial data for weather and Earth remote sensing.
At first glance, the bill looks good, but it also is not likely to be passed as written. Moreover, not surprisingly it calls for a hefty increase in funding for the FAA agencies being given more responsibilities, but I wonder if Congress will comparably reduce the funding of those agencies it takes responsibility from. My instinct tells me no, which means of course that the government and bureaucracy grows again.
The competition heats up: NASA has signed an agreement to provide testing facilities to Generation Orbit so it can do test flights of its air-launched rocket.
Generation Orbit Launch Services, Inc. (GO) is pleased to announce the signing of a Space Act Agreement with NASA Armstrong Flight Research Center (AFRC) to collaboratively pursue the flight test and envelope clearance for the GOLauncher 1 air launched rocket vehicle. Utilizing AFRCโs experience and capabilities in flight test engineering for air launch rocket systems, the two year program will demonstrate integration of the GOLauncher 1 Inert Test Article (GO1-ITA) with NASAโs Gulfstream III research aircraft, captive carry flight testing, and release testing. Further, NASA AFRC will continue the development of its store separation analysis capability, eventually validating the toolset through release flight testing of the GO1-ITA.
Like many similar past SAA agreements, NASA will provide no money, but will make its facilities available for testing at no charge. For a new company like this, this availability will help them enormously, and is more in line with what NASA was originally designed to do.
The Senate appropriations subcommittee has announced its proposed 2017 budget for NASA, including significant budget increases for SLS and Orion.
SLS is the big winner in the bill, according to a summary of its contents provided by the committee. The heavy-lift launch vehicle would get $2.15 billion, $150 million more than it received in 2016 and $840 million above the administrationโs request. The SLS funding includes $300 million directed for work on the Exploration Upper Stage with the goal of having it ready as soon as 2021, the earliest planned date for the first crewed SLS/Orion mission.
The bill also provides $1.3 billion for Orion, $30 million above 2016 and $180 million above the administrationโs request. It also directs Orion to be ready for its first crewed mission in 2021.
The bill provides $5.4 billion for science programs overall, $200 million below the request. The summary does not break out spending among the various science mission directorates. Commercial crew would get $1.18 billion, the amount requested by NASA, and space technology would get $687 million, the same as 2016 but $140 million less than requested.
Meanwhile, in order to keep NASA’s overall budget about the same as last year the subcommittee, led by porkmeister Richard Shelby (R-Alabama), apparently trimmed the agency’s science budget.
The full plan will be revealed tomorrow. Moreover, the House still has to make its budget proposal, and then the House and Senate have to agree. Regardless, this Senate budget proposal is more indication that this Republican Congress is going to throw endless gobs of money at SLS and Orion, so the boondoggle can fly once, maybe twice, and then get mothballed. What a waste.
It also tells us how insincere many Republican elected officials are when they claim they are for fiscal responsibility.
There is a commercial space conference going on in Colorado this week, which explains the plethora of breaking stories from the new commercial space companies both yesterday and today.
Two stories today from Aviation Week, however, are more about the old big space industry and the old way of doing things, and both reveal the hollow nature of that entire effort.
Both stories are about work Lockheed Martin is doing in connection with its Orion capsule, and both try to convince us that this capsule is going to be the central vehicle for the first missions to Mars.
Function starts in the bones of the spacecraft,โ [Mike Hawes, Lockheed Martin vice president and Orion program manager,] said in an April 12 interview at the 32nd annual Space Symposium here. โTo be a deep space spacecraft, you have to build differently than you would if your requirements were to stay in low Earth orbit and be quiescent at the International Space Station for a few months. Thatโs driven Orion from the beginning. Any architecture you look at needs a crew capability, a long-term design requirement. So, you can debate a lot of different missions, but you need that fundamental capacity we have invested in Orion.โ
I say balderdash. Orion is an over-priced and over-engineered ascent/descent capsule for getting humans in and out of Earth orbit. Spending billions so it can also go to Mars makes no sense, because its heat shield and other capsule technologies for getting through the Earth’s atmosphere are completely useless in interplanetary travel. Moreover, such a small capsule is completely insufficient for a long Mars mission, even if you test it for a “1,000 day” missions, as Hawes also says in the first article. To send a crew to Mars, you need a big vessel, similar to Skylab, Mir, ISS, or Bigelow’s B330 modules. A mere capsule like Orion just can’t do it.
Eventually, it is my hope that Congress will recognize this reality, and stop funding big space projects like SLS and Orion, and instead put its money behind the competitive private efforts to make money in space. Rather than trying to build its own capsules, space stations, rockets, and interplanetary vessels (something that NASA has repeatedly tried to do without any success), NASA should merely be a customer, buying the capsules, space stations, and interplanetary vessels that private companies have built, on their own, to make money, on their own.
Consider for example Bigelow’s B330. Each module is about as big as Skylab or Mir, and costs mere pennies to build and launch, compared to those government-designed stations. Moreover, Bigelow can build it fast, and repeatedly. Similarly, Orion has cost billions (about $16 billion when it makes its first manned mission in 2021 at the earliest) and will have taken 15 years to build. SpaceX built Dragon in seven years, Orbital ATK built Cygnus in five years, and Boeing is going to build Starliner in about four years, all for about $10 billion, total.
The contrast is striking, and though ordinary people with the ability to add 2 plus 2 can see it, it takes Congressman a little longer (as they need to use their fingers to count). Sooner or later they will get it, and Orion and SLS will disappear. Bet on it.