Sierra Nevada introduces its cargo version of Dream Chaser

The competition heats up: Sierra Nevada has unveiled a revised cargo version of Dream Chaser, competing for NASA next round of freighter contracts to ISS.

They have made a number of changes, but the most significant is the new folding wings, allowing the spacecraft to fit inside the fairings of most rocket systems. This also eliminates one of the concerns I have read about the previous design on whether its wings could have withstood exposure to the maximum atmospheric stresses experienced during launch.

Lockheed Martin enters the competition to supply cargo for ISS

The competition heats up: Lockheed Martin has joined Sierra Nevada, Orbital ATK, Boeing, and SpaceX in bidding for NASA’s next contract to ferry cargo to ISS.

Lockheed’s proposal is different in that it proposes a two spacecraft operation. The cargo would be hauled up in a very simple storage bin, where a long-term orbital tug would grab it and take it to ISS. The idea is that they would only have to build and launch the complicated thrusters, robot arms, computers, and avionics of their cargo freighter once, thereby saving money.

Two companies will be chosen. Since the first competition back in the mid-2000s, when NASA picked SpaceX and Kistler for the first cargo round, the quality of the bids has improved remarkably. Back then, NASA had to choose from a bunch of new companies, none of which had ever done this before. The big companies (Boeing, Lockheed Martin) then poo-pooed the competition, saying that it couldn’t be done as cheap as the new companies claimed. After Kistler went under and was replaced by Orbital, they and SpaceX proved the big companies were wrong.

Now the competition includes all the big players, except that those big players are no longer offering expensive systems but cut-rate efficient designs that are as cost effective as SpaceX and Orbital’s first designs.

Magnetic field science satellites launched

An Atlas 5 rocket successfully launched four NASA research satellites Thursday night designed to study the behavior of the Earth and Sun’s magnetic fields at high resolution.

The quartet of observatories is being placed into an oblong orbit stretching tens of thousands of miles into the magnetosphere — nearly halfway to the moon at one point. They will fly in pyramid formation, between 6 miles and 250 miles apart, to provide 3-D views of magnetic reconnection on the smallest of scales.

Magnetic reconnection is what happens when magnetic fields like those around Earth and the sun come together, break apart, then come together again, releasing vast energy. This repeated process drives the aurora, as well as solar storms that can disrupt communications and power on Earth. Data from this two-year mission should help scientists better understand so-called space weather.

NASA schedules commercial manned demo missions to ISS

The competition heats up: NASA has now added to its ISS schedule the planned launch dates for the first demo missions of SpaceX’s and Boeing’s privately built manned capsules.

For Boeing, its CST-100 will first launch on an uncrewed test flight to the Station via the “Boe-OFT” mission in Apr, 2017 – on a 30 days mission, ending with a parachute assisted return. Should all go to place, the second mission will involve a crew – yet to be selected – on a mission designated “Boe-CFT”, launching in July, 2017, on a 14 day mission to the ISS.

The [planning] dates show SpaceX to be the most advanced in the Commercial Crew path, with their projected test flight dates currently set to win the honor of being the first Commercial Crew vehicle to arrive at the orbital outpost. That first Dragon 2 mission, designated “SpX-DM1″, has a December, 2016 launch date, ahead of a 30 day mission – most of which will be docked to the ISS – ending with a parachute assisted landing in the Pacific ocean. This would be followed by “SpX-DM2″, a crewed flight, launching in April of 2017, on a 14 day mission. This would mark the first time astronauts have launched from American soil on a US built spacecraft since Atlantis’ STS-135 mission in 2011.

American manned space exploration should begin to get very exciting in the next two years, with multiple companies now capable of putting humans in space.

Second spacewalk in ISS reconfiguration completed

On Wednesday astronauts successfully completed the second spacewalk in NASA’s long term reconfiguration of ISS to accomodate two privately-built commercial manned spacecraft.

The reconfiguration will continue on Sunday with the third EVA for this crew.

The spacewalk had one minor issue that could be a cause for concern for future American spacewalks: The suit of one of the astronauts had a small water leak within it. While this problem was minor and not a threat to the astronaut, it is reminiscent of the more serious spacesuit leak that occurred in 2013 that almost drowned an Italian astronaut. Finding the cause of that leak took almost a year to track down, and though solved even now raises concerns. To have another water leak inside a suit, even a minor one, suggests that the design of the American suit has a design flaw that they are having difficulty correcting.

Russians confirm plan to leave ISS in 2024

The competition heats up: Russian space managers have confirmed that they have endorsed a plan to leave ISS in 2024, when they will assemble their own space station using new modules as well as a significant number of the modules attached to ISS.

On February 24, 2015, the Scientific and Technical Council, NTS, at Roskosmos, the main planning body at the agency led by a newly appointed chairman and the former head of the agency Yuri Koptev, formally endorsed the Russian participation in the ISS program until 2024. It would be followed by the separation of Russia’s newest modules from the ISS to form the new national space station. As previously reported on this site, the initial configuration of the station would include the Multi-purpose Module, MLM, the Node Module, UM, and the Science and Power Module, NEM. Notably, the original Russian ISS component — the Zvezda Service Module, SM — was not included in the plan, thus ensuring that its propulsion capabilities would be available for deorbiting of the outpost at the end of its operational life.

Whether ISS will be functional with just the Russian Zvezda module is not clear. NASA engineers now have about a decade to figure this out and to fix it.

In general the break up of the partnership running ISS will be good for space exploration. The competition between nations will spur development and innovation. It will also free each nation from the shackles of the partnership. The Russians in particular have wanted to utilize ISS for more daring and longer expeditions to research interplanetary travel, and were stymied by NASA’s bureaucracy. Once they start doing this sort of thing on their own station NASA will feel obliged to follow.

Obviously, competition between nations carries risk. As long as there is some agreed to framework for claiming territory on other planets (something that the U.N. treaty does not allow), the nations will be able to compete peacefully. Without that framework, however, will leave room for disagreement and conflict.

It is thus essential that the space-faring nations sit down and work out this framework, and do it as soon as possible before each nation has vested interests in space that are already in conflict with each other. Above all, this new framework has got to abandon the U.N. space treaty with its rules that forbid the claiming and controlling of territory by nations in space. Those rules were never realistic, and literally guarantee that nations will eventually end up at war with each other as they fight to determine who owns what in space.

NASA safety panel questions safety of SLS

NASA’s safety panel has issued a report questioning the safety of the early launches of the Space Launch System (SLS), partly due to the very low launch rate and the lack of any planned unmanned test flights for the rocket’s upper stage engine.

“The ASAP and the Agency remain concerned about risks introduced in the currently scheduled frequency of SLS/Orion launches, ” according to ASAP’s 2014 Annual Report. “The plan indicates a launch about every 2 to 4 years. This would challenge ground crew competency. The skills, procedures, and knowledge of conducting the launch, mission, and recovery are perish-able. The ASAP believes that an extended interval requires the relearning of many lessons and skills, in contrast to Apollo and Shuttle, which had a relatively steady cadence.”

No space project can accomplish anything with launch rate this slow. Not only does this increase the risk that inexperience will cause errors, the long time gaps make it difficult for the project to get anything done.

And then there is NASA’s idea that it can put humans on this rocket without any previous launch testing of the rocket’s upper stage or the capsule’s life support systems. Why should NASA’s rocket get a pass on this kind of testing when the agency is demanding that the private companies do it?

The rockets of the world

Link here.

Inspired by a book and poster from 1995, titled “Rockets of the World,” graphic artist Tyler Skrabek has provided a new and updated “clean” look for his latest work. “The ‘Rockets of the World’ poster emulates a 1960 style of drawing,” he said, “employing a consistent pallet across all rockets allowing for a distraction-free look at the size and power of the world’s greatest machines.”

A link to the poster itself can be found here. It is fascinating to compare rockets that no longer exist with those flying today.

The Obama administration’s 2016 NASA budget proposal

Eric Berger takes a look at the key budget items in today’s proposed budget. More details here.

As has happened in the last few years, Obama has tried to boost commercial space at the expense of SLS/Orion, one of the few positions of the Obama administration to which I heartily agree. Unfortunately, I expect Congress to also do as it has also done in the last few years, boost SLS/Orion at the expense of commercial space.

As I’ve noted before, I don’t mind that Congress trims commercial space, as giving them too much government money will make them lazy and prone to waste. What I do mind is all the money Congress spends on SLS/Orion, which is a complete waste and could be cut entirely and help reduce our debt.

SpaceX moving forward on manned flight

At a briefing today SpaceX outlined its plans for testing its manned Dragon capsule as well as the rough schedule for the two launch abort tests it must first fly before putting humans on Dragon.

The first test, a launchpad abort test, is expected to take place in about a month. The second, an abort test from an in-flight Falcon 9, is also expected to occur this year.

If all goes well, NASA hopes to have both SpaceX and Boeing flying American astronauts to ISS by 2017.

NASA explains why it picked Boeing over Sierra Nevada

In a report released by NASA late last week, the agency outlined the reasons it picked Boeing’s CST-100 manned capsule over Sierra Nevada’s Dream Chaser mini-shuttle for the second contract to provide manned ferry capabilities to ISS.

Sierra Nevada’s Dream Chaser spacecraft, which would take off on top of a United Launch Alliance Atlas 5 rocket and land on a runway like the space shuttle, is not as far along in development as the competing CST-100 and Crew Dragon capsules proposed by Boeing and SpaceX, according to a source selection statement signed by Bill Gerstenmaier, head of NASA’s human exploration and operations directorate. “A winged spacecraft is a more complex design and thus entails more developmental and certification challenges, and therefore may have more technical and schedule risk than expected,” Gerstenmaier wrote in the selection statement.

NASA wants to have the commercial crew capsules operational by the end of 2017 to end U.S. purchases of astronaut seats on Russia’s Soyuz ferry craft. Before NASA permits its astronauts to fly on the CST-100 and Crew Dragon, each spaceship will go through ground testing and complete unpiloted and crewed test flights.

The reasoning seems quite reasonable. It also suggests that Sierra Nevada might have a better shot at winning a contract during the next round for cargo, as scheduling will not be as critical since NASA has other alternatives to get cargo to ISS.

Cruz and Rubio to chair important space and science subcommittees

We are about to find out how conservative and pro-private enterprise senators Ted Cruz (R-Texas) and Marco Rubio (R-Florida) really are. Both have been assigned as chairmen of important subcommittees managing NASA and NOAA.

Cruz will chair the subcommittee on Space, Science, and Competitiveness, which handles NASA, while Rubio will chair the subcommittee that handles NOAA.

For Cruz especially this position will challenge him to prove his tea party credentials. If he is in favor of private space as much as he claims, we will see him work to trim SLS, a pork project with no hope of achieving anything in space, and favor the commercial space effort, even though SLS brings much more pork into his state.

Travel posters for alien worlds

NASA has produced retro-style travel posters for three alien exoplanets which you can download and print.

The posters are quite cool, which is not surprising, considering that, in the past four decades, the best interplanetary travel that NASA has been able to achieve has been its graphic power-point and pr images. Unfortunately, for NASA actually going there has not been so easy.

CO2 satellite overcomes design flaw

Despite a decade of development, including the production of two satellites, the Orbiting Carbon Observatory-2 was launched in July with a basic design flaw that was never spotted.

Scientists and engineers on the project have ridden an emotional roller coaster. In 2009, a rocket failure doomed the Orbiting Carbon Observatory, their first attempt at a carbon-mapping probe. Its replacement, OCO-2, launched successfully. But after the JPL turned on the main instrument — a trio of spectrometers that measure sunlight light reflecting off Earth’s surface — the team discovered a problem in OCO-2’s data. They eventually determined that it was caused by a design flaw that reduced the amount of light entering the instrument during one mode of operation. The problem dated to 2004 and had never been caught in testing, says JPL’s David Crisp, the science team leader of the OCO-2 mission. “It was a stupid mistake. Embarrassing to the instrument designer and to me,” he says.

This flaw was apparently in both OCO satellites and was never noticed.

Fortunately, they have improvised a work-around that is allowing the spacecraft to get its data, which interestingly shows the highest concentrations of CO2 are coming not from the U.S. and the First World but from poorer parts of Africa and South America (caused by “burning savannas and forests,” not SUVs) and from China.

Friday’s Falcon 9 launch delayed

Because of a scrubbed static fire test on Tuesday, it is now likely that Friday’s Falcon 9/Dragon launch will be delayed until January.

Attempts during the four hour test window on Tuesday did not result in a successfully conducted Static Fire. Several requests for further information, sent to SpaceX during and after the test window, resulted in the company saying they had no information to provide. SpaceX normally provide confirmation after a successful conclusion to the test.

Source information noted at least one full countdown towards the firing was attempted, which was classed as aborted at the very end of the count. At least one NASA-based outlet claimed the Static Fire had taken place, potentially pointing to ignition of the Merlin 1D engines, before an abort – due to an issue – was likely called. No confirmed information on the issue has been forthcoming from SpaceX. However, the company has promised to provide more information to this site when “they have something to share.”

It was, however, understood that the next Static Fire attempt is likely to take place no sooner than Thursday. That too appears to have been cancelled following review.

If tomorrow’s static fire test has been canceled then Friday’s launch will definitely be canceled as well. None of this has been confirmed yet, however, so it is possible that all is well and the launch will go forward as planned.

Update: The launch delay has now been confirmed. A new launch has not yet been announced however.

NASA builds a $349 million test stand it knows it will never need

SLS marches on! Though Obama cancelled the Constellation rocket program in 2010, NASA continued to build a $349 million engine test stand for that rocket, finishing the tower in June 2014.

The test stand was also significantly over budget. It now sits useless, since the SLS rocket will use a different untested engine in its upper stage during its first manned flight.

It is every important to underline the chronology here. The rocket was cancelled in 2010. Construction on the test stand continued however for four more years, partly because of decisions by NASA management and partly because of mandates forced on them by Congress.

Stories like this illustrate why I think the political clout of SLS is weak. The program is too expensive, is riddled with waste, and it can’t accomplish anything anyway, making it a perfect target for both muckraking journalists and elected officials who want to make a name for themselves saving the taxpayer’s money. And both have a perfect inexpensive and successful alternative to turn to: private space.

1 45 46 47 48 49 71