Iridium announces its own alternative to GPS

The competition heats up: Iridium has announced the availability of its own location technology comparable to GPS and using the company’s constellation of satellites.

Iridium Communications Inc. has introduced its Satellite Time and Location (STL) service, an alternative or complement to traditional indoor and outdoor location-based technologies, and declared it ready for use. STL’s position, navigation and timing (PNT) technology is deployed through Iridium’s 66 cross-linked, low-earth orbit satellite constellation. Through Iridium satellites and in GNSS receivers, STL technology can work to verify GPS, GLONASS, Galileo and other navigation services, and also can serve as an alternative for those services when GPS signals are degraded or unavailable. STL also can provide an alternative source of time when testing GPS signals.

Essentially, for practically nothing, using satellites and technology already in orbit, they have created their own system that can both compete and complement the expensive government-built GPS systems.

2 comments

United Kingdom cancels spaceport competition

The competition heats up: The United Kingdom has cancelled its spaceport competition to chose one spaceport and instead has announced it will allow any one of the competing locations to operate if they can want and can meet some licensing requirements.

In other words, instead of the government dictating one location as the nation’s spaceport, it will allow different locations to compete for the space launch business.

The link has few details, though a closer look at subject of the British space effort can be found here.

1 comment

SpaceX, Lockheed Martin, and Mars

Two stories this week illustrate the difference between lobbying the government to get anything accomplished, and doing it yourself with the goal of making money from it from private customers.

In the first case SpaceX is planning to fly a Dragon capsule to Mars, using its Falcon Heavy rocket, and do it by 2018. It would not be manned, but would do the initial engineering testing for later manned missions, using larger interplanetary spacecraft. SpaceX is not asking the government to help pay for it. They are only making sure they have dotted all the legal “I”s required. The goal is to build spacecraft that can take anyone to Mars who is willing to pay for the flight.

In the second case Lockheed Martin is proposing a big government program to put six astronauts in orbit around Mars, in 2028. They haven’t really built anything yet to do this, they merely are lobbying the federal government to pay for it.

Which do you think is more likely to happen? Anyone who reads Behind the Black knows that I choose SpaceX. For 40 years I have seen many different variations of Lockheed Martin’s proposal, all of which came to nothing. They are powerpoint proposals, not real engineering, designed to wow Congress and NASA and get funding for the company. Nothing will ever be built, since the actual construction is so far into the future and so untested that it is impossible to predict what will really happen.

SpaceX however is planning a real mission, which is being designed to lay the groundwork for later more complex attempts. Rather than propose something big for far in the future, they are building something reasonable and doable now. Moreover, they aren’t lobbying the government, they are advertising their skills to the entire world, with the goal of convincing everyone to buy their very real product.

UPDATE: I should add a link here to Orbital ATK’s proposal in Congressional hearings on Monday to use their Cygnus capsule to build a cislunar space station by 2020. Like Lockheed Martin, they are lobbying Congress to build a mostly powerpoint concept. Why don’t they instead make an investment of their own money, like SpaceX, to send some Cygnus capsules to lunar space and demonstrate the concept, while also learning what needs to be done? I would have greater faith in the reality of their concept if they did that.

5 comments

Status of the third recovered Falcon 9 first stage

The recovered first stage from SpaceX’s last Falcon 9 launch experienced significant wear and tear during its high speed descent and landing.

They do not think they will be able to use the stage again, but will instead test it to determine the engineering tolerances that need to be met to make recovery and reuse in these situations more likely. The data will also help them increae the likelihood of reusability on launches that are less stressful.

Posted from Belize.

23 comments

Congress demands Air Force spend less and more at the same time

A House budget report has cut the Air Force launch budget while simultaneously requiring the Air Force to favor more expensive launch companies.

In addition to cutting the funding available for new launch contracts, House appropriators also want the Air Force to consider “the best value to the government” in evaluating bids.

ULA has been pushing for the best-value approach since it sat out last fall’s GPS-3 launch competition saying it couldn’t win a price shootout against SpaceX, which will launch the satellite which was awarded an $82.7 million contract last month for a May 2018 launch of a GPS-3 satellite. That contract was awarded as part of a best value source selection. “We do not yet feel we are in a position to win price-only competitions with our competitor,” Tory Bruno, ULA president and chief executive, said in a March interview with SpaceNews. “We believe we have better performance, reliability and schedule certainty.” Those traits would carry greater weight in a best-value competition.

Only our precious Congress. On one hand they cut the budget for launches because they think the Air Force is wasting money On the other they demand that the Air Force spend extra millions on launch contracts so that the company they favor, ULA, gets the work. One would almost think they do not have the nation’s interests in mind..

0 comments

Airbus initiates smallsat launcher project

The competition heats up: Airbus has begun a project to develop a smallsat commercial launch rocket, competitive with Rocket Lab’s Electron and Virgin Galactic’s LaunchOne, aimed at the cubesat and nanosat satellite market.

The source for the story was unnamed, and also gave few details, so it is hard to know how real this is. What I gather however is that we might be seeing the beginnings of a long term split in the launch market, with one set of big rockets designed to launch human-related payloads, including humans, and a second set of small rockets focused on launching unmanned satellites.

13 comments

ULA’s CEO explains why they are retiring Delta

Tory Bruno, the CEO of ULA, explained in an op-ed today why his company is discontinuing its use of Boeing’s Delta family of rockets and focusing exclusively on Lockheed Martin’s Atlas 5 and its eventual replacement, the Vulcan Centaur.

Delta is an amazing rocket, but it’s costly to produce. Its burnt-orange foam insulation has to be applied by hand. Its production line is bigger and more complex than Atlas’s. And its components are pricier.

Bruno’s purpose with this op-ed is to convince Congress to leave his company alone while they develop the new Vulcan rocket. Congress keeps proposing outlawing use of the Atlas 5 with its Russian engines, and Bruno does not want that, at least not until the Vulcan is flying. He is also trying to reduce his costs by discontinuing Delta, which in turn would allow him to lower prices for his Atlas 5 and compete more effectively with SpaceX.

Though I understand Congress’s concerns, I do find it sad that in modern America a private businessman has to lobby Congress for the right to run his company as he sees fit.

7 comments

First manned Starliner flight delayed

Boeing has revealed that the first manned flight of Starliner will be delayed until 2018.

This delay for Boeing is not really a surprise. Unlike SpaceX, the company had done very little actual development work on the capsule before winning its contract from NASA. They therefore have a lot more to do to become flight worthy. My one worry is their contract. If the contract is fixed price, as with the original cargo contracts awarded SpaceX and Orbital ATK, Boeing will have no incentive to delay, as they won’t be paid anything until they achieve specific milestones and will get no additional monies to cover the added costs of the delay. If the contract is cost-plus, however, NASA’s traditional contract system used for SLS, Orion, and almost every other boondoggle since the 1960s, then Boeing will be paid regardless of the delay, and NASA will also be on the hook for paying the additional delay costs, thus giving Boeing an incentive to slow walk the construction.

I think the contract was fixed-price, but am not sure. Anyone out there have an answer?

5 comments
1 489 490 491 492 493 677