Using the X-37B as a space ambulance?

Researchers have proposed using the Air Force’s X-37B as an ambulance in space.

Halberg said that an effective astronaut taxi should, among other things, be able to stay at the ISS for two years or more at a stretch; be capable of getting people back to Earth rapidly, within three hours or so; impose minimal G-loads on occupants; have the ability to land close to a hospital; and allow patients to lie in a supine position. These requirements all point to a space plane rather than a capsule, Halberg said โ€” meaning SpaceX’s Dragon capsule and Boeing’s CST-100 capsule, which are scheduled to start flying NASA astronauts to and from the ISS within the next year or two, wouldn’t make the grade as ambulances.

Another private crew-carrying vehicle that’s currently in development, Sierra Nevada Corp.’s Dream Chaser space plane, is an intriguing option that bears further investigation, Robinson and Halberg said. But their initial concept study focused on the robotic X-37B, chiefly because the 29-foot-long (8.8 meters) military space plane has already racked up millions of miles in orbit, while Dream Chaser has yet to launch.

Makes sense, though once Dream Chaser is flying it will have the potential to provide the same service with far greater capabilities.

5 comments

Musk predicts mid-December return to flight

In a cable news interview today, Elon Musk reiterated recent reports that SpaceX expects to resume launches by the middle of December.

That the head of Inmarsat, one of SpaceX’s satellite customers, has confirmed this plan and appears to have no problem with it, suggests to me that SpaceX is on solid ground and that they have pinpointed a solution to the launchpad explosion that will not require any major re-engineering.

17 comments

Vector teams up with private company for low-cost launch tracking capability

The competition heats up: The new smallsat rocket company Vector Space Systems has signed a deal with Atlas Space Operations, a private company focused on providing low-cost launch and satellite tracking capabilities.

As early as 2018, Vector Space Systems will be able to provide a space-to-ground communication network from the Galactic Sky division to its customers through ATLAS LINKSโ„ข โ€“ the world’s first mobile, rapidly deployable, and electronically steered array RF ground system that is revolutionizing the space industry. Designed for communications with both low-earth orbit and deep space missions, and capable of rapid deployment anywhere on the globe โ€“ ATLAS LINKSโ„ข arrays will enable Vector Space Systems to simultaneously track signals over multiple frequencies, effectively eliminating high civil engineering costs associated with the installation of other systems that require expensive antennae and pedestals. Satellite ground architecture and data services will support Vector Space Systems’ launch operations from the ground and in-orbit, transforming satellite telemetry tracking and command systems (TT&C) and ground operations for space startups.

In other words, Atlas is in direct competition with the antenna network of NASA’s Deep Space Network, and is designed to be cheaper and more flexible.

0 comments

Luxembourg invests $28 million into asteroid mining company

The competition heats up: In its continuing effort to make money from space, the government of Luxembourg has invested $28 million in the asteroid mining company Planetary Resources.

As part of the deal, Planetary Resources is establishing a European headquarters in Luxembourg that will conduct research and development activities. Georges Schmit, a member of the Space Resources advisory board to the Government of Luxembourg, wil join Planetaryโ€™s board. โ€œWe plan to launch the first commercial asteroid prospecting mission by 2020 and look forward to collaborating with our European partner in this pivotal new industry,โ€ said Chris Lewicki, Planetary Resources chief executive.

As with Luxembourg’s other deals, the investment has required the company to shift many of its operations from the U.S. to Luxembourg.

0 comments

Atlas 5 to launch Cygnus in March

NASA has ordered Orbital ATK to use ULA’s Atlas 5 rocket for its next Cygnus cargo run to ISS in order to maximize the cargo that the capsule can deliver.

A Cygnus reached the station last month with over 5,000 pounds of supplies after launching atop Orbital ATKโ€™s own Antares rocket. It was the first such flight for the booster in two years, a lull instigated by the 2014 explosion of an Antares and Orbital ATKโ€™s decision to replace the main engines with a different design. But the more-powerful Atlas 5 rocket can launch over 7,700 pounds of provisions inside a Cygnus, and the Wall Street Journal reported on Thursday night that NASA has pushed Orbital ATK to buy another Atlas 5 for its greater lift capacity and reliability record.

Sources told Spaceflight Now that the Atlas 5 would launch the OA-7 mission in March and that Orbital ATK was working with Kennedy Space Center to book facility time to process the Cygnus.
It was not immediately clear if NASA or Orbital ATK would pay for the extra costs associated with the Atlas 5 rocket.

This decision by NASA to favor Atlas 5 here over Antares illustrates some of the commercial weaknesses of Antares. Orbital ATK’s decision to launch the rocket from Wallops Island in Virginia had some political advantages, putting their launch facilities in the state and congressional district of legislators whose approval they were soliciting. The decision, however, limited the cargo capacity of the rocket because of the site’s higher latitude. This might also help explain why Orbital ATK has as yet failed to find any other customers for Antares, besides NASA.

I also wonder whether some political pressure from other legislators who favor ULA also helped influence this decision. The political game is brutal these days in Washington and almost nothing connected to the federal government is done anymore without some crony and corrupt political maneuvers in the background.

0 comments

SpaceX may lose a customer payload

Because of the launch delays at SpaceX, Inmarsat is considering finding another rocket company to launch its fourth Global Xpress satellite.

Inmarsat is worried that even after SpaceX resumes launches with the Falcon booster, it may not be able to make up lost time to assure its satellite is placed on orbit as scheduled. Alternatives the London-based company is considering include flying the spacecraft on the European Ariane 5 rocket, Lockheed Martin Corp.โ€™s Atlas V, or the Russian Proton booster. Mr. Pearce said Inmarsat could stick with SpaceX if it can get an earlier launch slot.

This is all part of the competitive game. Inmarsat needs to get its satellite in orbit in order to better compete in the communications market, and the delays at SpaceX because of the September 1 launchpad explosion are not helping. This announcement puts pressure on SpaceX to move them to the front of the line or else lose the launch. It also increases their chances of finding an alternative should SpaceX not be able to do that.

2 comments

Virgin Galactic releases Unity test flight program

In a change from the company’s past policy, which made many promises but never revealed their upcoming schedule in any detail, Virgin Galactic today released their planned test schedule for their new Unity spacecraft.

This test will be the first of a sequence of glide test flights. These flights will cumulatively allow us to test and prove the performance of the vehicle in a variety of conditions: both heavy (e.g. simulating the full weight of a load of fuel, oxidizer, and people) and light (with empty tanks) and in between, at a variety of flight path angles and airspeeds, and so forth. This testing of the โ€œcorners of the boxโ€ is designed to demonstrate how VSS Unity will perform as it returns from space, after the feather system is retracted and the vehicle becomes a glider and lands on the runway like an airplane. In addition, this phase of flight will also demonstrate and test our abort modes โ€“ which culminate in a safe glide back to the runway.

Our team of flight test experts has developed a set of requirements for each planned test flight as well as detailing exactly what we need to test in order to be ready to proceed to the next phase of rocket powered flights. We will fly as many flights as we need to in order to achieve all these objectives.

The schedule, quite properly, does not include any dates. In the past the company and Richard Branson, would make many grand promises about when their test program would be completed without providing any details of what they planned to do during that test program. This time, Branson is quiet, they have announced no schedule dates, but have provided good information about the test program itself. This is a very good change.

0 comments

Atlas 5 Vandenberg launch delayed again

The ULA Atlas 5 launch of a commercial satellite at Vandenberg that has been delayed repeatedly for numerous reasons, some (wildfires) completely unrelated to the rocket, has been delayed again for five days because of “booster issues”.

The news reports do not say what these issues are.

0 comments
1 648 649 650 651 652 898