An update on the Falcon 9 engine problems.

An update on the Falcon 9 engine problems.

Based on SpaceX’s press release, the rocket functioned as designed to overcome the engine failure. Nonetheless, it behooves them to find out why that engine shut down prematurely.

More worrisome for the company is the failure the Falcon 9 rocket to place in its proper orbit a secondary payload, an Orbcomm communications satellite. The satellite ended up in too low an orbit, probably because of the engine failure during launch. Orbcomm has a contract with SpaceX to launch a whole series of these satellites. This failure now, right at the get-go, won’t do them much good in terms of public relations.

8 comments

One engine of the Falcon 9 failed during launch.

Confirmed: One engine of the Falcon 9 exploded during launch.

Video at the link. The other 8 engines picked up the slack — as designed — and got Dragon into orbit.

This spectacular engine failure will of course have to be reviewed. However, if I were a commercial satellite company looking for a rocket to get my satellites into orbit, this failure would be recommendation, not a deterrent. The Falcon 9 demonstrated that even if one engine fails (and this one did by blowing up!), the rocket can survive the failure and make it to orbit. If that isn’t clear proof that this is a well designed and well built rocket, nothing is.

6 comments

In order to get a seat on a Soyuz capsule Sarah Brightman outbid NASA, bumping its astronaut out and thus forcing the U.S. agency to finally agree to a year long mission.

Irony of ironies: In order to buy her seat on a Soyuz capsule Sarah Brightman outbid NASA, bumping its astronaut out.

This was a win-win for the Russians. They get paid more by Brightman than by NASA (over $51 million), and they finally get that year long mission they’ve been campaigning for for years. Because Brightman has taken one of NASA’s seats, the U.S. agency was forced to agree to the extended mission in order to maintain a presence on the station throughout that time period. Otherwise, their astronaut would come home and be replaced by Brightman, but for only ten days.

1 comment

The rollout to the launchpad of the first stage of Orbital Sciences’ Antares rocket has been delayed until Saturday.

The competition heats up: The rollout to the launchpad of the first stage of Orbital Sciences’ Antares rocket has been delayed until Saturday.

The rollout had been scheduled for today, but had to be scrubbed due to a battery problem in the transporter for moving the rocket. Once on the pad, they will then spend the next 4 to 6 weeks preparing for a hold down firing test. And if that test goes well, they will follow it up with the first launch of Antares before the end of the year.

2 comments

The head of Russia’s space agency said today that they need to reorganize their industry in order to compete.

Isn’t competition wonderful? The head of Russia’s space agency said today that they need to reorganize their industry in order to compete.

Key quote: β€œUnless we act now – we will cease to be competitive,” he warned.

I wonder why? Could it be there is a company out there selling launch capability at half the cost?

0 comments
1 619 620 621 622 623 676