Vector Space Systems signs $60 million contract

The competition heats up: Vector Space Systems, which recently began work on a rocket factory in Tucson, today announced the signing of a new $60 million launch contract.

Vector Space Systems, a micro satellite space launch company comprised of new-space industry veterans from SpaceX, Virgin Galactic, McDonnell Douglas and Sea Launch, today finalized an agreement with York Space Systems, an aerospace company specializing in small and medium class spacecraft, to conduct six satellite launches from 2019 through 2022 with the option for 14 additional launches. The first launch through the agreement will also be the inaugural launch of the Vector-H vehicle, which is capable of launching 100 kg into orbit, and will provide an integrated spacecraft to customers through a standardized platform.

York Space Systems will use the launches with Vector Space Systems to place their standardized S-Class satellite platform into orbit for commercial and government customers. York Space Systems’ satellites will also employ the unique Electric Upper Stage which uses Vector Space Systems’ propriety electric propulsion technology as the final insertion stage of the Vector-H to place the satellites into orbital altitudes up to 1000 km with zero loss of launch throw mass capability.

It seems that there are now a lot of competing space races going on in the private aerospace industry. SpaceX and Boeing are racing to launch astronauts to ISS. SpaceX and Blue Origin are racing to reuse rockets. Blue Origin and Virgin Galactic are racing to launch the first suborbital tourists. A handful of private companies are racing to win the Google Lunar X-Prize. Arianespace, ULA, and Russia are racing with SpaceX for big payload launch contracts.

And a new group of small rocket companies are racing to capture a new burgeoning small satellite industry. Based on the most recent reports, it looks to me that Vector Space Systems and Rocket Lab are in the lead, though who will be first remains unclear. Hopefully, both will win by launching successfully and competing against each other.

1 comment

Antares successfully launches Cygnus

After two years of redesign, Orbital ATK’s Antares rocket tonight successfully put a Cygnus cargo capsule into orbit.

Considering that every single one of the vehicles that fly to ISS (Soyuz, Dragon/Falcon 9, Cygnus/Antares, HTV) has been experiencing some issue that has delayed each of their launches, this success tonight must be a relief to managers and engineers in both Russia and the U.S.

Next comes a manned Soyuz launch on Wednesday.

1 comment

Used Dragon to fly in 2017

The competition heats up: SpaceX has confirmed that they will reuse a Dragon capsule to bring cargo to ISS in the spring of 2017.

This plan had already been revealed earlier. The news here is simply that NASA and SpaceX have finalized the decision and picked the actual schedule cargo mission that will use a Dragon capsule. What is more significant is this:

SpaceX plans to reuse Dragon spacecraft through the remainder of its current CRS contract, which runs through SpX-20. [Benjamin Reed, SpaceX director of commercial crew mission management] did not discuss how many Dragon spacecraft are available to be reused, or how many times SpaceX believes a Dragon capsule can be flown.

If successful, Reed said it would allow SpaceX to end production of the cargo Dragon spacecraft. “We’ll be reflying Dragons going forward, and be able to close down the Dragon 1 line and move all the way into Dragon 2,” he said, referring to the next-generation version of the Dragon being developed for commercial crew missions.

In other words, their goal is to transition very quickly from disposable capsules to a fleet of capsules that they fly over and over again.

0 comments

No more manned Soyuz purchased by NASA after 2019

The competition heats up: Both Boeing and SpaceX better get their manned capsules working by 2019, because NASA at this point has no plans to buy more seats on Russian Soyuz capsules after the present contract runs out.

Even as the commercial crew schedules move later into 2018, NASA officials say they are not considering extending the contract with Roscosmos — the Russian space agency — for more launches in 2019. The last Soyuz launch seats reserved for U.S. astronauts are at the end of 2018.

It takes more than two years to procure components and assemble new Soyuz capsules, so Russia needed to receive new Soyuz orders from NASA by some time this fall to ensure the spacecraft would be ready for liftoff in early 2019.

The second paragraph above notes that even if NASA decided it needed more Soyuz launches, it is probably too late to buy them and have them available by 2019.

3 comments

Vector Space Systems to open Tucson facility

The competition heats up: Vector Space Systems has decided to build a rocket manufacturing facility in Tucson.

The Tucson-based company is expected to create 200 jobs locally within three years of beginning operations, at an average annual salary of $70,000. It could employ as many as 500 people within five years as production ramps up, said its co-founder and CEO, Jim Cantrell. Vector plans to invest roughly $19 million during the first three years, and possibly as much as $50 million over the next 15 years, according to Pima County officials. The total direct economic impact of the facility could be $290 million over five years, says an analysis by Phoenix-based Applied Economics completed for Sun Corridor Inc., the local economic-development agency. The company plans to build 36,000 square feet of office space and another 40,000 square feet for manufacturing south of Tucson International Airport.

The company already has several million in smallsat launch contracts, plus options for $160 million more once they begin producing rockets.

0 comments

The first nation in space?

A science research center has announced it is forming an independent nation in space which anyone can join.

If you are 18 or over and have an email address, you can apply to become a ‘citizen’ of Asgardia today. At the time of this writing, more than 4,900 people have signed up, including at least one Popular Science editor. “When the number of those applications goes above 100,000 we can officially apply to the UN for the status of state,” said Ashurbeyli, adding that Asgardians would not have to give up citizenship in their countries of origin.

The group hopes to launch its first satellite in 2017 or 2018. How it will avoid being under the jurisdiction of any other country remains to me a mystery.

Eventually, when there are thriving reasonably self-sufficient colonies in space, circumstances will demand that they declare their independence from what is becoming an increasingly oppressive Earth culture. Until then, declarations like Asgardia are nothing more than publicity stunts that are not going to go anywhere.

6 comments

TMT considers alternative sites to Hawaii

Faced with a continuing legal battle to build the Thirty Meter Telescope (TMT), the consortium running is now seriously considering alternative sites.

Potential Northern Hemisphere sites include San Pedro Mártir in Baja California in Mexico and Roque de los Muchachos on La Palma, a Spanish island off the Atlantic coast of Morocco. “Our friends in La Palma are pushing hard” to get the TMT, says Matt Mountain, president of the Association of Universities for Research in Astronomy in Washington, D.C. But neither alternative matches the seeing conditions on Mauna Kea, and they would bring extra cost and complication. The project has already ruled out sites in the Himalayas, put forward by India and China—both TMT partners along with the United States, Japan, and Canada—because they are too far from ports and have short construction seasons.

The TMT governors are expected to choose their top alternative site later this month. Regardless of what happens in Hawaii, the governors have vowed to start construction—on Mauna Kea or elsewhere—no later than April 2018.

It is clear that Mauna Kea in Hawaii is the best location. Unfortunately, they are faced with the reality that there might be years of delays before they ever get permission to build, if they get permission at all.

5 comments

Russia gets two contracts for Proton

The competition heats up: Russia has signed two new contracts using its newly announced Proton-Medium rocket configuration.

Both contracts are for the same launch. The primary payload will be a Intelsat communications satellite. The secondary payload will be Orbital ATK’s first Mission Extension Vehicle (MEV-1), which is actually more significant and somewhat ground-breaking.

The MEV-1 provides life-extending services by taking over the propulsion and attitude control functions. Satellites have an average of 15 years of life on orbit, before they need to be replaced. The vehicle itself has a 15-year design life with the ability to perform numerous dockings and undockings during its life span. “Rather than launching new satellites, operators can extend the life of healthy in-orbit satellites, providing enhanced flexibility through Orbital ATK’s scalable and cost-efficient capabilities,” noted Our simple approach minimizes risk, enhances mission assurance, and enables our customers to realize the maximum value of their in-orbit satellite assets.”

The launch of MEV-1 will involve in-orbit testing and a demonstration to be performed with an Intelsat satellite. MEV-1 will then relocate to the Intelsat satellite scheduled for the mission extension service, which is planned for a five-year period. Intelsat will also have the option to service multiple satellites using the same MEV.

If MEV-1 proves successful, Orbital ATK will have built, launched, and made money from the first robot repair satellite. While at first glance this success suggests that satellite companies will need to launch fewer satellites, thus reducing the market demand for rockets, what it will really do is make the orbiting satellite more useful and profitable, thus encouraging new players to enter the market. The demand for satellites will increase, thus increasing the demand for rockets.

Ain’t freedom and private enterprise grand?

5 comments

Boeing pushes back first Starliner flights

Boeing has delayed the first test flight of its Starliner manned capsule from the end of 2017 until June 2018.

Boeing says that production delays and problems with qualification tests are partly to blame for the timeline slip. The company also found a production flaw in September that forced them to get rid of a main element on one of their spacecrafts — a dome that made up the pressure shell of the crew module. All of these complications combined prompted Boeing to push back the development timeline of Starliner by about six months.

0 comments
1 587 588 589 590 591 785