SpaceX vs Arianespace, according to the TV industry

The heat of competition: A television industry trade journal looks at Arianespace’s future plans and finds them wanting, when compared to SpaceX.

Compare that [SpaceX’s] success with the money that’s been poured into Arianespace, and the lack of progress (perhaps wholly understandable when being managed by a Euro-committee!). Ariane’s mid-way ME version (for Midlife Extension) has been on the drawing board since 1995. And at a considerable investment, and for an initial scheduled flight of only 2017-2018.

The Ariane-62/64 concept calls for as much of the “ME” design to be incorporated into the 62/64 versions. But the planned launch of the first A-62 is not for some time; some observers suggest at best 2021-22. That’s more than 20 years of planning, development and immense costs.

Read the whole thing. It illustrates the almost impossible challenge faced by Arianespace — a company designed by a committee of nations and run to distribute funding as widely as possible to those nations. For that company to successfully reshape its approach quickly so that it can successfully compete with SpaceX seems quite unlikely, and will likely result in Arianespace evolving into Europe’s government launch service, with the commercial market shifting back to the U.S.

0 comments

Falcon Heavy launchpad work begun

The competition heats up: SpaceX has begun the construction work necessary to convert the launchpad it will use at the Kennedy Space Center for its first test flight of the Falcon Heavy rocket, now scheduled for summer 2015.

Most of the current work appears to be taking place on the perimeter area of the pad, with the construction of a hanger building – known as the Horizontal Integration Facility (HIF) – that will house the Falcon Heavy rocket and associated hardware and payloads during processing. During rollout, the Falcon Heavy will be transported atop the Transporter Erector (TE), which will ride on rails, up the famous 39A ramp that once saw Space Shuttle and Apollo stacks arrive via the Crawler Transporters.

The July launch date is considered preliminary and a target date only and is of course subject to change.

0 comments

Former SpaceX employee arrested

A former SpaceX employee has been arrested for operating one of the largest drug marketplaces on the dark part of the web.

It appears he must have spent a lot of his time at SpaceX designing and operating a dark web website where people could go to buy illegal drugs. It also appears that this might have contributed to SpaceX’s decision to fire him during SpaceX’s most recent employee purges.

I must say that I find this story very sad. The guy gets a job at one of the premier cutting edge companies in the world where he can help that company build rockets that will take humans to the stars, and what does he do with his time? He creates a webpage to sell illegal drugs.

4 comments

NASA treats Congress like a doormat, again

Stupid: More than a month after publicly awarding commercial crew contracts to SpaceX and Boeing, NASA has yet to brief Congress on the reasons for its decision.

“To date, the Committee has not been briefed on the source selection, nor has it received the source selection statement, despite the fact that the offerors have been briefed, details were released to the press, the [Government Accountability Office] is now involved; and NASA has decided to proceed with the contracts,” Reps. Lamar Smith (R-Texas) and Steven Palazzo (R-Miss.) wrote in a letter to NASA Administrator Charles Bolden dated Oct. 21. Smith and Palazzo chair the House Science Committee and House Science space subcommittee, respectively.

“We hope that NASA will not expect taxpayers to blindly fund billion-dollar programs absent any information related to the procurement or contract,” wrote Smith and Palazzo, who are ardent supporters of the Space Launch System, major contractual details of which were only finalized this year and have not yet been made public.

These elected officials are not NASA’s allies when it comes to commercial space, so giving them too much information is probably dangerous. At the same time, the choice of Boeing was certainly done to ease their concerns, and keeping them out of the loop is only going to turn them against the commercial space contracts. It serves no purpose. NASA should instead be trying to show them why picking SpaceX and Boeing made sense, and how these two multi-billion dollar contracts will bring many jobs to their districts.

If NASA doesn’t do this basic political massaging, these guys are simply going to try to cut commercial space out when it comes time to negotiate the budget, as they have already tried to do several times in the past.

But then, when it comes to politics this behavior by the Obama administration is par for the course. They might have the right idea, farming out space exploration to the private sector, but their political implementation has often left much to be desired.

0 comments

Falcon 9 first stage to land on floating platform

The competition heats up: During an event at MIT on Friday Elon Musk revealed that SpaceX will to try to land first stage of the next Falcon 9 launch on a floating platform.

“We actually have a huge platform that’s being constructed in a shipyard in Louisiana right now,” Musk said in the interview, which was webcast live. He described the platform as about 90 meters long by 50 meters wide. “We’re going to try and land on that on the next flight.”

If the stage successfully lands on the platform, Musk said, it could potentially fly again. He put the odds of success at no greater than 50 percent for this particular attempt, but was more optimistic about the company’s chances of landing on the platform on a future mission. “There’s at least a dozen launches that will occur over the next 12 months,” Musk said. “I think it’s quite likely — probably 80 to 90 percent likely — that one of those flights will be able to land and refly.”

Based on everything this company has promised and later actually delivered, I would be willing to bet that they will do exactly as Musk says, and that sometime in the next year they will successfully recover the first stage of their rocket, an achievement that will shake the entire launch industry to its foundations.

5 comments

Sierra Nevada fights back

The company that wants to build Dream Chaser has filed a lawsuit to prevent NASA from proceeding with its contracts with Boeing and SpaceX.

When Sierra Nevada had first protested the contract awards, NASA had first suspended work, then decided to allow work to go forward. This lawsuit is to prevent that from happening until after Sierra Nevada’s protest is resolved.

Here’s what I think is happening: Sierra Nevada has said it is going to submit a bid to NASA for the agency’s second round of cargo flights to ISS, proposing Dream Chaser as one of those unmanned freighters. By playing hard ball now with the manned contact awards, the company is creating leverage with NASA. Though no one can say this publicly, I am sure they are making it clear privately that if they get picked for the cargo contract, they will drop both their lawsuit and protest.

0 comments

Why NASA picked Boeing over Sierra Nevada

A NASA internal document obtained by Aviation Week outlines the agency’s reasons for rejecting Sierra Nevada and its Dream Chaser spacecraft in its commercial manned space program.

Although the document praises Sierra’s “strong management approach to ensure the technical work and schedule are accomplished,” it cautions that the company’s Dream Chaser had “the longest schedule for completing certification.” The letter also states that “it also has the most work to accomplish which is likely to further extend its schedule beyond 2017, and is most likely to reach certification and begin service missions later than the other ‘Offerors’.”

Discussing costs, Gerstenmaier says that “although SNC’s [Sierra Nevada] price is lower than Boeing’s price, its technical and management approaches and its past performance are not as high and I see considerably more schedule risk with its proposal. Both SNC and SpaceX had high past performance, and very good technical and management approaches, but SNC’s price is significantly higher than SpaceX’s price.”

The document essentially was written, and probably leaked to the press now, to justify the political decision to give the contracts to Boeing and SpaceX. Thus, it waxes very enthusiastic about Boeing, since giving Boeing the contract, with the highest price and the least metal cut, needs some justification.

2 comments
1 201 202 203 204 205 234