Another law, another squelched dream

Surprise, surprise! Virgin Galactic space tourists could be grounded by federal regulations.

Virgin Galactic submitted an application to the FAA’s Office of Commercial Space Transportation in late August 2013, says Attenborough. The office, which goes by the acronym AST, has six months to review the application, meaning an approval may come as early as February. Industry experts, however, say that may be an overly optimistic projection. “An application will inevitably be approved, but it definitely remains uncertain exactly when it will happen,” says Dirk Gibson, an associate professor of communication at the University of New Mexico and author of multiple books on space tourism. “This is extremely dangerous and unchartered territory. It’s space travel. AST has to be very prudent,” he says. “They don’t want to endanger the space-farers or the public, and they can’t let the industry get started and then have a Titanic-like scenario that puts an end to it all in the eyes of the public.” [emphasis mine]

As I predicted ten years ago, the 2004 revision to the Commercial Space Act puts bureaucrats in charge of the exploration of space by private citizens, a fact that can have no good consequences.
» Read more

2 comments

The European Space Agency has now released its first cost estimates for upgrading and replacing its Ariane 5 rocket.

The European Space Agency has now released its first cost estimates for upgrading and replacing its Ariane 5 rocket.

Europe needs to find about 1 billion euros ($1.35 billion) to complete development of an upgrade to its current Ariane 5 heavy-lift rocket, which would fly in 2018 and be capable of lifting satellites weighing 11,000 kilograms into geostationary transfer orbit, European Space Agency Director General Jean-Jacques Dordain said Jan. 17. The Ariane 5 upgrade, called Ariane 5 ME, will be on the table for ESA governments to decide, alongside the new Ariane 6 rocket, at a meeting scheduled for December in Luxembourg.

In a press briefing in Paris, Dordain said it is too early to say how much Ariane 6 will cost to develop. Government and industry estimates have ranged between 3 billion and 4 billion euros, with an inaugural flight in 2021.

As Doug Messier notes in his worthwhile analysis of these numbers, “Europe is in deep trouble.” From a customer’s perspective, these new rockets won’t fly (pun intended). The cost is too high and the development time too long. By the time they get both Ariane 5 and Ariane 6 ready for launch they will be obsolete and overpriced, when compared to the rocket’s that will already be available from their competitors.

0 comments

Scaled Composites did an engine test today in Mojave of an alternative engine for SpaceShipTwo.

The competition heats up: Scaled Composites did an engine test today in Mojave of an alternative engine for SpaceShipTwo.

In this case, the company is even competing with itself, in that its first engine design is now in competition with another engine design. Considering the rumors about problems with that first design, I suspect the new design is probably winning.

0 comments

An outline of Dream Chaser’s test flight schedule for the next three years, leading to its first crewed flight in 2017.

An outline of Dream Chaser’s test flight schedule for the next three years, leading to its first crewed flight in 2017.

The article makes a big deal about Sierra Nevada’s completion of a NASA paperwork milestone, but to me the aggressive flight schedule is more interesting, including news that the engineering vehicle used in the test flight in October was not damaged in landing so badly it could no longer be used.

The Dream Chaser Engineering Test Article (ETA) has since arrived back in her home port in Colorado, following her eventful exploits in California. Despite a red-faced landing for the baby orbiter, she earned her wings during an automated free flight over the famous Edwards Air Force Base, a flight that was perfectly executed, per the objectives of the Commercial Crew check list. The vehicle will now enjoy a period of outfitting and upgrading, preparing her for one or two more flights – listed as ALT-1 and ALT-2 – beginning later this year. Both will once again be conducted at the Dryden Flight Research Center in California.

The ETA will never taste the coldness of space, with her role not unlike that of Shuttle Enterprise, a pathfinder vehicle used to safely refine the final part of the mission for the vehicles that will follow in her footsteps. The Dream Chaser that will launch into orbit will be called the Orbital Test Vehicle (OTV), which is currently undergoing construction at the Michoud Assembly Facility (MAF). Debuting atop of the United Launch Alliance (ULA) Atlas V, the OFT-1 (Orbital Test Flight -1) is scheduled to take place in late 2016. This flight will be automated, testing the entire Dream Chaser system, prior to the crewed OFT-2 mission in early 2017. [emphasis mine]

I think I will up my bet from yesterday. I am now willing to bet that all of the commercial crew spacecraft chosen by NASA to complete construction will fly their privately built manned spacecraft with crew before NASA flies its first unmanned test flight of Orion/SLS.

12 comments

A cheaper Japanese launch vehicle is scheduled to launch next month.

A cheaper Japanese launch vehicle is scheduled to launch next month.

The story is actually not very informative. What is interesting is the spin of the article: Japan’s rockets are getting cheaper! This suggests to me that the pressure brought to bear by SpaceX’s lower prices is being felt quite strongly.

We really don’t know if this Japanese rocket is cheaper to launch. What we do know is that, for the first time in decades, Japan feels compelled to use that sales pitch to sell its rockets. Isn’t competition great?

1 comment

NASA’s first test flight of both the Orion capsule and the heavy-lift SLS rocket in 2017 might be delayed because of design problems with the European-built service module.

I am shocked, shocked! NASA’s first test flight of both the Orion capsule and the heavy-lift SLS rocket in 2017 might be delayed because of design problems with the European-built service module.

Overweight and struggling with design delays, the European-built service module for the Orion crew exploration vehicle may not be ready for a much-anticipated test flight by the end of 2017. The preliminary design review for the Orion spacecraft’s critical engine and power element is now on track for May after a six-month delay to contend with weight issues, according to Thomas Reiter, director of the European Space Agency’s human spaceflight and operations programs.

I am willing to bet that SpaceX will put astronauts in space on Dragonrider before this unmanned SLS flight occurs.

9 comments

SpaceX has signed a contract with a Japanese commercial satellite company.

The competition heats up: SpaceX has signed a contract with a Japanese commercial satellite company.

The story was first reported on Friday, but I was busy this weekend and forgot to post it. Key quote:

The launch contract award for JCSAT 14, a communications satellite owned by Tokyo-based SKY Perfect JSAT Corp., adds another mission to SpaceX’s backlog, which stands at nearly 50 missions worth nearly $5 billion, according to a company press kit.

As SpaceX rolls these missions out and the money rolls in, it will insure the likelihood that they will build the Falcon Heavy as promised. And when they do, they will have created a heavy lift rocket and done it for pennies, compared to the costs spent on numerous government projects attempting to do the same.

3 comments
1 580 581 582 583 584 676