Deep Space Industries to fly probe to asteroid

The competition heats up: A private company, Deep Space Industries (DSI), has announced plans to send the first privately-built probe to an asteroid before the end of the decade.

Recently, Deep Space Industries and its partner, the government of Luxembourg, announced plans to build and fly Prospector-Xโ„ข, an experimental mission to low-Earth orbit that will test key technologies needed for low-cost exploration spacecraft. This precursor mission is scheduled to launch in 2017. Then, before the end of this decade, Prospector-1 will travel beyond Earthโ€™s orbit to begin the first space mining exploration mission.

Note that this funding is another example of the Luxembourg government’s effort to invest in commercial space, for profit.

If all goes as planned, the rest of this decade should be very exciting. We will have a private mission to the Moon, a private mission to an asteroid, and a private mission to Mars. All will cost pennies compared to what the government spends. All will be built and launched quickly, compared to how long the government takes. And all will be for profit, which is certainly not what the government is interested in.

1 comment

A report from Smallsat 2016

The competition heats up: Doug Messier has posted a nice summary of the most important presentations so far at Smallsat 2016 in Utah.

These are the rockets designed to launch cubesats or smaller. It appears that at least two companies, Firefly and Vector Space Systems, are getting close to their first flights. Both already have customers. The progress of a third company, Virgin Galactic, sounds as good, but they have talked big too many times in the past to trust them at this point. In fact, regardless of what any of these companies say, it will be actual flights that puts them on the map.

What is interesting is the number of these companies. There are a lot of them, which suggests strongly that some are going to succeed.

0 comments

Cruz visits NASA

In taking his family on a tour of the Johnson Space Center, Senator Ted Cruz (R-Texas) also met with some local industry businessmen where he expressed support for NASA as well as a desire to get ISS extended to 2028.

Cruz did not take questions from the media, though they were present during the meeting with businessmen. In reviewing the local press reports of that meeting (of which the above link is the most detailed), it appears that Cruz was mostly there to firm up his local constituent support by mouthing vague but strong support for NASA. It also appears that he as yet does not have a clear understanding of NASA’s full circumstances, or if he does he is leaning down the pork road to gain votes.

When my policy paper appears I intend to make sure his office gets it. By his actions after that we shall then see how sincere Ted Cruz really is about fiscal responsibility and private enterprise.

0 comments

Three stops on Iceland’s golden circle

An evening pause: From the youtube webpage: “The three main stops on the Golden Circle route in Iceland: 1. The magnificent Gullfoss waterfall; 2. Haukadalur geothermal area (widely known as Geysir) – famous for its geysers and termal pools (Strokkur being the most active); 3. Thingvellir National Park, where the Icelandic Parliament was established in 930, and where the continental drift between Europe and North America can be easily noticed.”

The music is “The Most Beautiful Things” by Michael Murphy.

Hat tip Danae, who added “Just chillin’ with sights for a hot summer day.”

1 comment

Moon Express gets FAA approval for Moon landing

The competition heats up: Moon Express, one of the leading private competitors in the Google Lunar X-Prize, has gotten FAA approval for its planned 2017 Moon landing.

It is looking like 2017-2018 will be very exciting years for private space. We will not only see the first launches of privately-built manned spacecraft, we will see the first privately-built and -funded missions to both the Moon and Mars.

8 comments

Vector completes suborbital test launch, signs contract

The competition heats up: The smallsat rocket company Vector Space Systems successfully completed its first suborbital test launch on July 30 as part of the signing of a new contract for 21 launches.

This company is moving quickly. In April they obtained financing, In July they revealed their launch schedule, with the first launch set for 2018. Mere weeks later, they complete their first test flight and announce a major launch contract.

0 comments

Design problems for Starliner

In the heat of competition: Boeing is working to correct two serious design problems that cropped up during the construction of its Starliner manned capsule.

First the thing was weighing too much:

One issue involved the mass of the crew capsule, which outgrew the lift capability of the United Launch Alliance Atlas 5 rocket selected to put it into orbit. The CST-100 Starliner will ride an Atlas 5 rocket with two solid rocket boosters and a dual-engine Centaur upper stage, and although Boeing and ULA engineers considered adding a third strap-on motor to compensate for the capsuleโ€™s extra weight, managers now have the spacecraft back under its mass allowance, Ferguson said.

Second, the capsule has a shape problem:

Ferguson said Boeing has a model of the Atlas 5 rocket and CST-100 Starliner in a wind tunnel to verify a change to capsuleโ€™s outer shape devised to overcome higher-than-expected aerodynamic launch loads discovered in testing. โ€œThey had one issue, a non-linear aerodynamic loads issue, where they were getting some high acoustic loads right behind the spacecraft,โ€ said Phil McAlister, head of NASAโ€™s commercial spaceflight development office in Washington.

Something here is rotten. It seems to me that Boeing shouldn’t be having these very basic problems right off the bat. In the past, under the older cost-plus contracts NASA used to routinely hand out, these kinds of problems would simply have meant that Boeing would have gotten more money from NASA, This time, however the contract is fixed-price. If Boeing has problems or delays, the company will have to bear the cost, not NASA. I suspect these problems might have occurred because of some cultural laziness at Boeing. Their management is used to not having to eat the cost of these kinds of mistakes. Now, they will. I expect the culture to therefore begin changing.

5 comments
1 663 664 665 666 667 898