Fourth Google Lunar X-Prize team gets launch deal

The competition heats up: TeamIndus, based in India, has signed a contract with ISRO to launch its Google Lunar X-Prize rover as a secondary payload on a Indian PSLV rocket.

This is the fourth X-Prize team to announce a launch contract. According to the rules, the teams have until the end of the year to obtain a contract or else they are out of the competition. We should therefore expect more of these announcements in the coming weeks.

0 comments

Russia Progress freighter lost during launch

Due to what appears to be the failure of the third stage of its Soyuz rocket, a Russian Progress freighter bringing supplies to ISS was lost.

The Russian space agency — Roscosmos — confirmed the demise of the Progress MS-04 cargo craft in a statement, saying the automated spaceship was lost as it flew nearly 120 miles (190 kilometers) over the Tuva Republic in Southern Russia. Engineers lost telemetry during the Soyuz rocket’s third stage engine burn, and most of the vehicle’s fragments burned up in the atmosphere, Roscosmos said.

The consequences of this failure are numerous:

  • The cargo failures to ISS have been a continuing problem. Despite significant redundancy, every single cargo freighter has had failures or delays in the past two years.
  • The failure of the Soyuz rocket is a major concern, since this is the rocket that we depend on to bring humans to ISS. Nor is this the first time this year that the third stage had issues. In May the third stage cut off prematurely.
  • This failure, combined with the other quality control problems Russia has experienced in the past few years with the Soyuz capsule and the Proton rocket, adds to the concerns.

It now becomes even more imperative for the U.S. to get its own manned spacecraft capability back.

25 comments

Russia sets budget for Vostochny through 2019

The Russian government has now allocated a new budget for the next phase of construction at its new spaceport at Vostochny.

“The money has been allocated and specified by Prime Minister Dmitry Medvedev for 2017-2019 within the limits of about 25-30 billion rubles annually, i.e. these funds are not as large as it seemed to us earlier,” the vice-premier said. “These funds have been set aside on the basis of the so-called ‘optimal scenario’ proposed by [State Space Agency] Roscosmos,” Rogozin said.

Essentially, they have lowered the budget and pushed back some of the more costly construction at Vostochny until after 2019. Even with these trims, they also note that the budget will still depend on how the Russian economy does in the coming years.

0 comments

Airbus to slash more than a 1,000 jobs to cut costs

The competition heats up: In a continuing re-organization to cut costs, Airbus yesterday announced plans to slash 1,164 jobs.

The initiative is part of [Airbus Chief Executive Tom] Enders’s four-year campaign to reshape the business in the wake of the failed attempt in 2012 to merge with BAE Systems PLC, Europe’s largest arms maker. After the deal with BAE faltered on German government opposition, he won shareholder backing for a new structure that reduced French, German and Spanish government involvement in company decision-making. The old structure was a legacy of the founding of the company in 2000 through the combination of European aerospace and defense assets.

Airbus in 2013 moved to merge its defense and space assets and shed some operations not central to its aerospace business.

This approach matches very well with the company’s joint partnership with Safran and their hard-nosed insistence that they own and control Ariane 6. They are pushing to get the government bureaucracy out of their business so that they can work more efficiently and make more money.

1 comment

New ULA website allows customers to configure their launch

The competition heats up: ULA today announced the creation of a new website, dubbed Rocketbuilder, where customers and the public and configure their own launch rocket.

ULA noted that the tool also provides insight into reliability, schedule assurance and performance, allowing users to make a true value comparison. “The value of a launch is a lot more than its price tag,” said Tory Bruno, ULA president and chief executive officer. “Through our RocketBuilder website, customers are now empowered with pricing information that can be used to make decisions during their spacecraft development process, potentially helping customers keep program costs down. In addition, customers are able to build a rocket based on the needs they input, their spacecraft specifications and mission requirements.”

Users have the flexibility to select a launch date, the satellite’s orbit, rocket configuration and the customized service level needed for the mission. Finally, the site will capture savings in extra revenue or mission life, provide the true total cost of the specific mission requirements, and allow users to begin the contracting process.

This is great news, as it shows that Bruno and ULA are very serious about competing aggressively with SpaceX. For example, Bruno notes that the price of the cheapest Atlas 5 configuration has dropped from $191 million to $109 million in the last few years. And while this price remains significantly more expensive than SpaceX’s $62 million, this new tool should help to drive the costs down more. When ULA learns which configurations sell best, it will then be able to make those configurations cheaper.

The site is also cool. I tried it, and found that it strongly resembles the experience of buying an airplane ticket at sites like Travelocity. You pick various options (payload weight, payload size, orbit, etc) and the site automatically adjusts the rocket’s configuration and the price.

1 comment

U.S. and China top Russia for most launches in 2016

The competition heats up: In 2016 it appears that the United States will complete the most rocket launches, at 20, followed by China with 19 and Russia with 18.

For the past two decades Russia has generally been the yearly leader in launches, but recent competition from the U.S. private sector and China’s surging government program, combined with lagging quality control problems and budget shortages in Russia, has had their launch rate decline to third. I also fully expect the U.S. lead to grow in the coming years as a range of low cost new companies come on line.

4 comments

New Chinese launch company gets its first customer

The competition heats up: A new Chinese launch company aimed at putting smallsats in orbit for a low price has signed its first customer.

In a statement published by China Daily, Zhang Di, vice president of the China Aerospace Science and Industry Corp. (CASIC) Fourth Academy, said Expace Technology Co. would charge around $10,000 per kilogram of satellite payload, which he said was less than half the prevailing commercial price. Zhang is also chairman of Expace.

CASIC created Expace in early 2016 as China’s second commercial-launch provider after China Great Wall Industry Corp. of Beijing, which has long been China’s showcase export vehicle for launches and commercial satellite contracts. China Great Wall is part of the China Aerospace Science and Technology Corp. (CAST). Zhang said Expace has already signed its first commercial contract, valued at 100 million Chinese yuan, or around $14.5 million, to place three Earth observation satellites into low Earth orbit aboard a Kuaizhou 1 rocket for the government-owned Changguang Satellite Technology Co.

This same company has more than 10 other satellites slated for future launches on Kuaizhou rockets.

The situation here is interesting. This small company is essentially competing against China’s big space company that builds that country’s Long March rockets. It is also aiming to capture some of the market share of the new smallsat industry, specifically targeting international satellite companies that are becoming less and less dependent on the U.S. rocket components that would forbid their use on a Chinese rocket.

1 comment

Another Google Lunar X-Prize team secures launch contract

Part Time Scientists, one of the teams competing for the Google Lunar X-Prize, has secured a launch contract through launch rideshare broker Spaceflight Inc.

Their rover will launch as a secondary payload. It is the broker’s job to secure that slot.

PTScientists plans to land its rovers in the moon’s Taurus-Littrow valley, the last place humans set foot on the lunar surface in December 1972, in the hopes of getting a closer look at how the Apollo moon buggy has survived over the past four and a half decades in the extreme temperatures and inhospitable conditions on the moon. “There is a reason we have chosen the Apollo 17 landing site,” said Karsten Becker, PTScientists electronics head, said in a call with reporters on Tuesday. “That is because the Taurus-Littrow valley is geographically very interesting — that is why it was chosen for Apollo 17 — but it is also a very-well documented site. There are many pictures where you can see that it is very flat, and that there are not that many stones laying around.”

The landing site has been chosen to be within reach of the Apollo 17 site, but not so close that it could risk damage to the NASA preservation heritage area. “We want to land 3 to 5 kilometers [2 to 4 miles] away from the [Apollo 17] landing site,” said Becker.

This team is now the fourth X-Prize team to secure a launch contract. All are hoping to launch within the next two years.

2 comments

Drilling for the oldest ice

Using new drill technology scientists are now searching for the best place in Antarctica to obtain the oldest ice core ever drilled.

More than a decade ago, the European Project for Ice Coring in Antarctica (EPICA) drilled the oldest existing core, which contains 800,000-year-old ice, from an ice dome in East Antarctica known as Dome C. The core reaches only as far back as the latter part of the Pleistocene epoch, when Earth began cycling between warm and cold periods every 100,000 years. Before 1 million years ago, the cycle occurred every 40,000 years (L. E. Lisiecki and M. E. Raymo Paleoceanography 20, PA1003; 2005), so scientists want an ice core that is twice as old as EPICA to better understand this transition.

Digging such a core would cost about US$50 million and take several years, so researchers want to be sure that the location is optimal — with ice that is sufficiently deep but not melted at the bottom by geothermal activity. “It’s absolutely crucial to thoroughly investigate all options,” says Eisen. Enter a new breed of drill, designed to do fast, cheap reconnaissance instead of extracting a single, intact ice core, as previous deep drills have done.

One promising location, ‘little Dome C’, lies just 40 kilometres away from the EPICA site — and is where the £500,000 (US$620,000) Rapid Access Isotope Drill (RAID) will start boring this month, led by climate scientist Robert Mulvaney of the British Antarctic Survey in Cambridge, UK. A narrow drill, RAID will excavate to 600 metres in about 7 days — compared with 5 years for a 3.4-kilometre core such as EPICA’s. And rather than extract a core, RAID will measure the ice’s temperature and collect chips of ice. Scientists will then comb these for clues from isotopes as to the age and temperature of the ice at the bottom of the sheet.

There is competition here as well. Another more conventional drill operation, run by Chinese scientists, has already been drilling for several years and might actually obtain a core sample 1.5 million years old first.

2 comments

Rocket Lab delays first rocket test flights

Rocket Lab has revealed that it will not conduct its first test flight of its new Electron rocket before the end of the year.

Rocket Lab originally scheduled road closures for test launches between November 17 and December 24. The company is now planning to conduct the first test flight early next year. Rocket Lab media spokeswoman Catherine Moreau-Hammond said the team had worked tirelessly this year, and with the holidays fast approaching they felt it best to allow everyone a decent break. Ms Moreau-Hammond said this would also alleviate some pressure on Mahia, which experiences a considerable population spike through the Christmas holidays.

This is a new company, a new rocket, a new launchpad, in a new country inexperienced in rocket launches. It is therefore not surprising that things have been delayed.

1 comment
1 582 583 584 585 586 785