Viewing options for first National Space Council meeting

Keith Cowing of NASAWatch has located details about the time and video viewing opportunities for Thursday’s first public meeting of the National Space Council.

The event will be streamed online on NASA TV and via Whiteouse.gov starting around 10:00 am. The event itself is only 2 to 2.5 hours long (not mentioned on the advisory).

…There is nothing online anywhere to suggest that the public can attend this event so it looks like it is going to be an expensive photo op with only a select few actually in attendance listening to pre-written statements being read before the cameras. The expense of taking over a large portion of a busy museum seems to be for the purpose of providing impressive backdrops for a meeting that is mostly show and little substance.

The advisory still provides no details about speakers.

4 comments

NASA to extend use of private module on ISS

Capitalism in space: NASA has decided to extend the life of Bigelow’s module BEAM on ISS beyond its original two year test.

NASA’s original contract with Bigelow was to keep BEAM on ISS for two years and then jettison it, but NASA has concluded that BEAM has value as a storage compartment and wants to keep it there. NASA said the new contract would overlap the originally contracted test period, for a minimum of three years, with two options to extend for one additional year. A decision on whether to jettison it at that point or continue using it will be made thereafter.

The agency said that not only would NASA use it for stowage, but Bigelow will be allowed to use it “as a test-bed for new technology demonstrations.”

Using it makes a lot more sense than jettisoning it (the typical government way). This will also allow them to study the longevity in space of an expandable module.

1 comment

Boeing delays first manned Starliner flight

Capitalism in space: It appears that Boeing has pushed back the first manned flight of its Starliner capsule from August 2018 to early 2019.

In an interview at the conference, Ferguson said that the company’s current schedule calls for a pad abort test at White Sands Missile Range in New Mexico in the second quarter of 2018. That would be followed by an uncrewed orbital test flight of the vehicle, launched on an Atlas V, in the third quarter of 2018. “If the results of that are very favorable,” he said of the uncrewed flight test, “our crewed flight test is fourth quarter — perhaps, depending on the outcome, maybe the first quarter of the following year.”

This schedule appears to be an overall three to five month delay in their program.

0 comments

Webb Space Telescope delayed again

NASA announced today that they are further delaying the launch of the James Webb Space Telescope from October 2018 to late spring 2019.

NASA’s James Webb Space Telescope now is planning to launch between March and June 2019 from French Guiana, following a schedule assessment of the remaining integration and test activities. Previously Webb was targeted to launch in October 2018. “The change in launch timing is not indicative of hardware or technical performance concerns,” said Thomas Zurbuchen, associate administrator for NASA’s Science Mission Directorate at Headquarters in Washington. “Rather, the integration of the various spacecraft elements is taking longer than expected.”

As part of an international agreement with the ESA (European Space Agency) to provide a desired launch window one year prior to launch, NASA recently performed a routine schedule assessment to ensure launch preparedness and determined a launch schedule change was necessary. The careful analysis took into account the remaining tasks that needed to be completed, the lessons learned from unique environmental testing of the telescope and science instruments at NASA’s Goddard Space Flight Center in Greenbelt, Maryland, and the current performance rates of integrating the spacecraft element.

Webb’s original launch date was supposed to be 2011, making its launch now verging on a decade late. The original budget for the telescope was supposed to be $1 billion. It is now expected to cost more than $9 billion. Like SLS/Orion, this project more resembles feather-bedding, providing NASA employees and the contractors involved a steady paycheck, regardless of whether they ever get anything done. In fact, both Webb and SLS/Orion seemed designed to encourage failure. The project never gets cancelled no matter what goes wrong. Instead, more money gets poured in.

12 comments

Lockheed Martin unveils concepts for Mars ship and lander

The boondoggle lobbying continues! Lockheed Martin today unveiled its concepts for a Mars interplanetary ship, built around its Orion capsule, as well as a fully reusable Mars lander.

The timing of this announcement fits perfectly with last week’s NASA announcement of its concepts for building a lunar space station, along with this week’s announcement to study doing it with the Russians. It also times perfectly with the announcement that the first public meeting of the National Space Council will take place on October 5. And tonight Elon Musk will give an update on his own proposals for getting to Mars.

All these public relations announcements suggest to me that the Trump administration is getting close to unveiling its own future space policy, and they all suggest that this policy will be to build a space station around the Moon. My guess is that Lockheed Martin and SpaceX are vying for a piece of that pie in their announcements today.

Let me also note that Lockheed Martin’s concept above illustrates nicely what a lie Orion is and has always been. They have been touting it for years as the vehicle that will get Americans to Mars, but now admit that it can only really be a small part of a much larger interplanetary ship, and will be there mostly to be the descent capsule when astronauts want to come home. They also admit in the video at the first link that their proposal for getting to Mars is only a concept. To build it would require many billions of dollars. I wonder will it cost as much as Orion and SLS ($43 billion plus) and take as long (18 years plus) to build? If so, it is a bad purchase. We can do this faster, and for less.

6 comments

NASA and Roscomos sign agreement to work together to build lunar orbiting station

Extending the pork: NASA and Roscosmos have signed an agreement agreeing to work together in the construction of what NASA calls a deep space gateway, a space station orbiting the Moon.

The goal here is to garner political support for getting funding to fly a third SLS/Orion mission, which would be its second manned flight. It is also to establish some long term justification for SLS/Orion, which presently has no mission and will disappear after its first manned test flight, presently scheduled for 2022. That single test flight will have taken 18 years and more than 40 billion dollars to build, an absurd timeframe and cost for a single mission that does not bode well for future SLS/Orion missions.

The Russian perspective can be found here. They claim that the station would be finished by 2024-2026, an absurd prediction based on the expected SLS launch rate of one launch every one to two years. For Russia, the hope is that they can use this project to get U.S. money, just like the big American space companies like Lockheed Martin (Orion) and Boeing (SLS).

10 comments

First meeting of National Space Council announced

A Potemkin Village: The White House has announced the date of the first public meeting of the National Space Council, set for October 5 at the Air & Space Museum.

Today, Vice President Mike Pence announced the first meeting of the National Space Council is scheduled for October 5, 2017 at the Steven F. Udvar-Hazy Center in Chantilly, Virginia. The meeting, titled “Leading the Next Frontier: An Event with the National Space Council,” will include testimonials from expert witnesses who represent the sectors of the space industry: Civil Space, Commercial Space, and National Security Space.

What this announcement tells me is that this council isn’t there to discuss and set space policy, but to sell that policy to the public. And right now, I am expecting that sales job will be trying to convince us that we must use SLS/Orion mission to build a new space station orbiting the Moon by 2023. They will use the council to pitch the idea, and then Trump will make the traditional Kennedy-like speech, with lots of astronauts standing behind him, committing this nation to putting a space station around the Moon by such-and-such a date. Whoopie!

Forgive me if I sound a bit cynical. I’ve seen this show many times before. For some reason, the opening act is great, but then it fades always away into nothingness before the second act begins.

4 comments

First manned SLS/Orion flight officially delayed to 2022

Government in action! The first manned flight of SLS/Orion has now been officially delayed one year until 2022, and that date remains questionable.

In addition, the first unmanned test flight of SLS/Orion has now also been delayed until December 2019, something that had been under consideration but is now official. Even with this delay, there are doubts whether that flight can take place then, which is why the 2022 launch of the first manned flight is questionable.

The article outlines in detail the Byzantine scheduling issues that NASA must fulfill to meet these launch dates, including a long timeline of deliveries that seems absurd when compared to how private companies operate.

Assuming that these new dates occur as announced (something I sincerely doubt), the first unmanned launch of SLS/Orion will occur almost 16 years after President Bush first proposed it, with the first manned flight occurring more than 18 years after his proposal. In that time NASA will have spent about $43 billion for this one manned mission. Let me repeat: $43 billion and almost two decades to fly one manned mission. Quite absurd.

The article also details NASA’s proposal for a third SLS/Orion mission, the second manned, to occur in 2023, which would begin assembly of a space station in lunar orbit. I suspect that this mission is going to be announced in what will be President Trump’s version of the typical Kennedy-like speech that Reagan, Bush 1, Clinton, Bush 2, and Obama have all given, announcing big plans in space by such-and-such deadline.

Whether Congress funds it remains to me an open question. Right now I would predict they would, since they love the pork that SLS/Orion provides. In two years, when Falcon Heavy has flown several times and is likely becoming operational, and New Glenn is getting close to its first test launch, I am not so sure. Both will be flying before SLS’s first flight and both will have been developed for a tenth the cost with equal if not greater capabilities. And both will be able to fly more frequently for practically nothing, when compared to SLS.

16 comments

NASA’s international outreach continues

Barack Obama’s demand that NASA focus on teaching international students, especially Muslims, on how to get into space is continuing in the Trump administration.

The list of countries participating, available here, is not confined only to Muslim countries, and seems reasonable: Australia, Brazil, Israel, Jordan, Lithuania, Mexico, Portugal, South Africa, South Korea, Sweden, Trinidad & Tobago, the United Arab Emirates (UAE). At the same time, it is a reasonable question whether this should really one of NASA’s focuses.

Note one interesting detail. The European Space Agency is listed as one of these nations, but its program is presently on hold for reasons that are not explained.

0 comments

The Worst Part of Losing Cassini Is That It Has No Replacement

Link here. This article is an honest review of the current lack of concrete plans by anyone to send a new probe to Saturn. While there are some tentative missions in the works, nothing is certain.

[I]f looking back on Cassini’s major discoveries at Saturn, Titan, and Enceladus have left you thirsty for more, we have some bad news: That thirst is going to go unquenched for a while. Talks of Uranus and Neptune missions are tentative at best. The best hope for Saturn now comes from NASA’s New Frontiers program, which looks for excellent medium-cost missions has spawned spacecraft including Jupiter’s Juno and Pluto’s New Horizons. This round of New Frontiers missions must launch by 2024, and there are two Enceladus proposals, a Titan proposal, and a Saturn atmospheric probe under consideration. We may hear word about those proposals by the end of the year “Hang tight, we’re going through the evaluations now and we’ll be announcing at the end of the year what some of the finalists will be,” Jim Green, NASA Planetary Science Director, said at the Cassini press conference Friday morning.

This list of possible Saturn missions sounds great, but they are all competing against each other and a number of other equally (and possibly more) interesting missions to other places. And with the federal budget out of control and mired in debt, there isn’t really a lot of money to go around.

13 comments

An oral history of the Cassini mission to Saturn

Link here. Those who have read my book on the building of the Hubble Space Telescope will recognize many of the same people and political maneuvers used to get the project off the ground and funded.

Note too that the idea of Cassini was first proposed in 1982, but it didn’t actually launch until 1997. Fifteen years. While today I think such a spacecraft could go from concept to launch much faster, this timeline gives us a guide on when the next Saturn orbiter might launch. At the earliest do not expect another mission to Saturn to launch before 2025.

2 comments

Trump nominates James Bridenstine as NASA administrator

As expected for months, Trump late yesterday nominated Congressman James Bridenstine (R-Oklahoma) as the new administrator of NASA.

He will still have to be confirmed by the Senate. Interestingly, both Florida senators, a Democrat and a Republican, have announced their opposition to the nomination.

Bridenstine is somewhat in favor of private space, but previous analysis of his past proposals by myself and others has not been encouraging. What he will do as head of NASA however remains unknown. Based on his past statements, I would be surprised if he cut back on either commercial space or SLS.

0 comments

SpaceX postpones Mars Dragon missions

Based on statements from one NASA official, it appears that SpaceX has put its plans to fly a Dragon capsule to Mars on “the back burner.”

Jim Green, head of NASA’s planetary science division, told Spaceflight Now in an interview that SpaceX has told the agency that it has “put Red Dragon back on the back burner.”

“We’re available to talk to Elon when he’s ready to talk to us … and we’re not pushing him in any way,” Green said. “It’s really up to him. Through the Space Act Agreement, we’d agreed to navigate to Mars, get him to the top of the atmosphere, and then it was up to him to land. That’s a pretty good deal, I think.”

It is my impression that, because NASA has forced SpaceX to give up on propulsive landing of its Dragon manned capsules, the company cannot afford to invest the time and money on it themselves, and thus do not have a method yet for landing a Dragon on Mars. Thus, they must postpone this program.

6 comments

ULA’s Atlas 5 successfully launches NASA communications satellite

Capitalism in space: ULA this morning successfully launched NASA TDRS-M communications satellite, following a several week delay caused by an accident during satellite preparation that forced the replacement of the satellite’s antenna.

This was ULA’s fifth launch for 2017, which is behind the once-a-month pace they have maintained for the previous five years.

0 comments

Republican Senate committee restores all cuts to NASA climate budget

Failure theater: The Senate Appropriations Committee today marked up NASA’s budget, restoring almost all of the proposed cuts, including cuts to the agency’s climate programs that both the Trump administration and the House had proposed.

The only program it appears the Senate cut was NASA’s planetary program, which they trimmed by almost 25%.

This only provides more evidence that the large number of the Republicans in the Senate are not really Republicans. They certainly aren’t conservative. And it sure appears that they aren’t very smart either, considering that NASA’s planetary program is one of its most successful endeavors.

We shall see how this budget shakes out in the coming months. Overall I am not hopeful. It appears to me that this Republican Congress wants to spend big bucks, and is hell bent on doing it.

3 comments

Cameras on next Kepler-like exoplanet space telescope out of focus

NASA has revealed that the cameras on the Transiting Exoplanet Survey Satellite (TESS) become slightly out of focus when they are cooled to -75 Celsius, the temperature they will experience in space.

NASA has also decided that the fuzziness is not enough to require a fix, and is proceeding with the mission as is, despite concerns expressed by scientists.

Alan Boss, an astronomer with the Carnegie Institution, brought up the issue in a summary of a meeting last week of the Astrophysics Advisory Committee, of which he is a member. “That could have some big effects on the photometry,” he said of the focus problem. “This is certainly a concern for the folks who know a lot about photometry.”

TESS will use those cameras to monitor the brightness of the nearest and brightest stars in the sky, an approach similar to that used by Kepler, a spacecraft developed originally to monitor one specific region of the sky. Both spacecraft are designed to look for minute, periodic dips in brightness of those stars as planets pass in front of, or transit, them. Chou said that since TESS is designed to conduct photometry, measuring the brightness of the stars in its field of view, “resolution is less important compared to imaging missions like Hubble.” However, astronomers are concerned that there will be some loss of sensitivity because light from the stars will be spread out onto a slightly larger area of the detector.

“The question is how much science degradation will there be in the results,” Boss said. “The TESS team thinks there will be a 10 percent cut in terms of the number of planets that they expect to be able to detect.”

It could be that NASA has decided that the cost and delay required to fix this is not worth that 10% loss of data.

0 comments

TDRS-M launch moved to August 20

NASA has decided to delay the launch of its TDRS-M satellite until August 20.

This simplifies their launch schedule, as it allows SpaceX to launch as planned on August 12 and thus not interfere with an August 17 Russian spacewalk that is releasing two satellites from ISS. It will also give them plenty of time to replace the antenna that was damaged during launch prep, in an incident which they still have not described in any detail.

0 comments

The damage and repair of TDRS-M creates complicated scheduling problems

Because of the launch delay caused by the accident that damaged the antenna of NASA’s TDRS-M communication satellite, requiring its replacement, the agency is now faced with a cascading series of scheduling problems.

They are now aiming for an August 10 launch of TDRS-M on a ULA Atlas 5. This will then force a delay in the August 12 launch of a Dragon capsule to ISS to August 14, which can’t be delayed past August 16 because of a scheduled Russian spacewalk on ISS that must happen on August 17 because it involves the release of two satellites. Making things even more complicated is Dragon’s cargo, which includes mice for a rodent experiment. If it doesn’t occur before August 16, the mice will then have to be replaced with fresh mice, causing further delays.

There is then even the chance that these scheduling problems might impact SpaceX’s scheduled August 28’s launch of the X-37B, as well as ULA’s scheduled August 31 launch of surveillance satellite.

One additional tidbit: This Dragon will be the last unused cargo capsule. All future SpaceX cargo missions will use previously flown capsules.

I should add that these scheduling issues illustrate starkly the growing need for more launch sites. There is money to be made here, fulfilling this need.

4 comments
1 67 68 69 70 71 117