Obama makes another empty space commitment

In an op-ed today, President Barack Obama made another one of those Presidential Kennedy-like space commitments, this time proposing that the U.S. send humans to Mars.

We have set a clear goal vital to the next chapter of America’s story in space: sending humans to Mars by the 2030s and returning them safely to Earth, with the ultimate ambition to one day remain there for an extended time. Getting to Mars will require continued cooperation between government and private innovators, and we’re already well on our way. Within the next two years, private companies will for the first time send astronauts to the International Space Station.

Obama in his op-ed spends a lot of time claiming credit for the recent resurgence in the American space industry. Though his administration does deserve some of the credit, in that they continued and expanded the commercial space initiative first started in the Bush administration, the bulk of the credit here really must be given to the private companies that did the actual work. SpaceX and Orbital ATK took enormous financial risks to make their rockets and capsules fly. They made it happen, proving at last to a generation that had lost faith in private enterprise and freedom that relying on private enterprise and freedom really is the best way to do things.

Meanwhile, I would not take Obama’s proposal very seriously. We will have a new president in just a matter of a few months, and that president will make his or her own decisions. Moreover, it really won’t matter that much what that next president proposes anyway. The real story will be with private individuals and private companies, forging their own dreams as they search for ways to get into space in a profitable manner.

5 comments

Suspicious climate data manipulation at NASA

The uncertainty of modern climate science isn’t merely because of the overall complexity of the data and the climate. Though there are numerous factors that contribute to the long term fluctuations of the climate that we do not yet completely understand or can quantify with any precision (the sun, dust, soot, volcanoes, carbon dioxide increase, to name just a few), there is a more tragic uncertainty that global warming scientists at NASA and NOAA have added to the mix, one that is entirely unjustified and harmful to the field of science and the questions that it is trying to answer.

In the case of this post, that tragic uncertainty has to do with sea level rise and the “adjustments,” without explanation, that NASA is making to its sea level data. Below is a graph taken from the link, showing the changes that have been made to published data from 1982 in order to eliminate a long period of almost no sea level rise from the mid 1950s through 1980.
» Read more

28 comments

New NASA authorization bill introduced in Senate

A new NASA authorization bill was introduced in the Senate on September 15, calling for NASA to rethink its asteroid redirect mission as well as begin the process of shifting the operation of ISS from government to private enterprise.

Among [the bill’s policy provisions] is language regarding ARM, a mission that involves sending a robotic spacecraft to retrieve a boulder from a near Earth asteroid and place it in lunar orbit to be visited by astronauts. “It is the sense of Congress that the technological and scientific goals of the Asteroid Robotic Redirect Mission may not be commensurate with the cost,” the bill states, referring to the robotic portion of ARM. Alternative missions, it says, “may provide a more cost effective and scientifically beneficial means to demonstrate the technologies needed for a human mission to Mars.” The bill directs NASA to evaluate alternative mission concepts to compare their scientific, technical and commercial benefits, as well as their costs, with ARM. That study would be due to Congress 180 days after the bill’s enactment.

The bill also addresses planning for the eventual end of the ISS in the 2020s, stating that there is a need for an “orderly transition” from the current NASA-led management of the station to “a regime where NASA is one of many customers of a low Earth orbit commercial human space flight enterprise.” That provision would require NASA to assess its needs for continued research in low Earth orbit after the ISS is retired, the existing and projected commercial capabilities to meet those needs, and steps NASA can take to stimulate both the supply of commercial facilities and demand for their use. The bill also calls on NASA to study an extension of the ISS “through at least 2028” to identify the technical issues, scientific benefits, and costs of such an extension.

The authorization also endorses SLS and Orion, which isn’t surprising considering that most of the Senators proposing this authorization come from states with big contracts for that boondoggle.

In recent years authorization bills have not meant that much. While they express the desires of some members of Congress, which does influence policy, their specifics are usually ignored in subsequent years. Nonetheless, the new focus here on private space suggests that the advantages of competition and private enterprise is finally beginning to leak into the tiny little brains of our elected officials. That they are still pushing SLS and Orion, however, shows that the leak is still tiny, and somewhat limited.

Give it time, however. Give it time. When private companies have begun regular launches of their big rockets, well before SLS completes its first manned flight, these legislators should finally realize what most people already know, that SLS and Orion is a complete waste of money.

0 comments

Charles Bolden poo-poos private space

In remarks at a conference yesterday NASA administrator Charles Bolden expressed his distrust and lack of confidence in the ability of private companies to build large heavy lift rockets.

“If you talk about launch vehicles, we believe our responsibility to the nation is to take care of things that normal people cannot do, or don’t want to do, like large launch vehicles,” Bolden said. “I’m not a big fan of commercial investment in large launch vehicles just yet.”

…Despite the demonstrable efforts by both SpaceX and Blue Origin, Bolden nonetheless said that “normal people” cannot, or do not want to, develop large launch vehicles. What the administrator appears to be asserting here is that NASA is more special, or better, than those in the private sector when it comes to building rockets.

The article at the link notes the strangeness of Bolden’s remarks, especially since NASA itself has failed, despite repeated efforts, to build its own new rocket since the 1970s. The author also notes the high cost of SLS, though the numbers he cites — $13 billion to develop and build SLS — is actually about half the real cost, which will be about $25 billion to build two SLS rockets.

Bolden here illustrates the old way of doing things. He will be gone soon, however, and a new way will replace him, private, competitive, innovative, and fast moving, everything that NASA has not been in the past four decades.

12 comments

Orion faces more budget and schedule delays

A new inspector general report of NASA’s Orion has found that the program still faces significant budget and technical problems in meeting the planned August 2021 launch date for its first manned mission.

The report makes it clear that this launch will almost certainly be delayed until 2023, meaning that from the date President George Bush proposed Orion in 2004, it will have taken NASA a full two decades to launch the first manned Orion capsule.

Let me repeat that: Two decades to build and launch a single manned mission. Does anyone see something wrong here?

As for what will happen after that first flight, the report itself [pdf] makes it pretty clear that not much is likely. From page 11:

For Orion missions after 2023, NASA has adopted an incremental development approach. According to the Program Plan, the approach is cost-driven and will provide a core vehicle the Agency can upgrade to provide additional capabilities for missions beyond cis-lunar space. Each incremental upgrade will build on flight experience to ensure the vehicle’s design is based on viable technology and capabilities. Consistent with this incremental approach, NASA has not committed to specific missions after 2023 and therefore has not developed detailed plans, requirements, or costs for such missions. According to NASA officials, the Agency will instead focus on building capabilities through defined roadmaps that identify technology development paths and capability requirements for deep space exploration missions. Officials explained the Agency will fund basic research, pursue development of the technologies that appear most viable, and build capabilities based on available funding. Missions will be selected based on the progress and maturity of the developed technology.

A translation of this gobbly-gook into plain English can be summed up as follows: Congress has given us no money for future missions, so we can’t plan anything.

Considering the cost and the ungodly amount of time it took NASA to get to this one flight, and considering how badly this record compares with the numerous flights that private commercial space will achieve prior to this single flight, don’t expect Congress to fork up more money after 2023. SLS and Orion are going to die. Unfortunately, their slow death will have cost the American taxpayer billions of wasted dollars that NASA could have been better spent on other things.

3 comments

Want to buy a used NASA robot? You can!

Link here. The robot was developed in the 1960s to test spacesuits, though because it leaked oil it was never used.

In fact, this particular 1960s NASA project appears to be a perfect example of “engineers gone wild!” The website explains that the robot was an attempt to replace human test volunteers.

Unfortunately, pressure suits aren’t like coveralls. They’re complex pieces of engineering. A human can provide qualitative information about how (un)comfortable a suit is, but cannot gauge the forces involved with the precision and accuracy that an an engineer needs. In addition, testing pressure suits with volunteers can be grueling, unpleasant and even painful.

In the end, however, the robot didn’t work and the testing was done by humans, probably for a lot less than the $175,000 they spent (in 1960s dollars) to build two of these robots. One however is now being auctioned off, and could serve wonderfully as a great piece of interesting artwork in someone’s home.

0 comments

Budget constraints and technical challenges delay commercial crew

A NASA inspector general report released today cites both budget constraints imposed by Congress as well as technical challenges that will delay the first commercial manned mission to ISS until 2018.

When the commercial crew program began, NASA hoped to have routine flights by 2015, but that slipped in large part due to congressional underfunding in the early years. OIG noted today that its 2013 report found that adequate funding was the major challenge for the program. Congress has warmed up to the program, however, and now is approving the full President’s request so funding is not the issue it once was. Technical challenges now are the major hurdle according to today’s report.

The companies’ systems must be certified by NASA before beginning routine flights to ISS. Boeing anticipates receiving certification in January 2018 with its first certified flight in spring 2018, and SpaceX is working toward late 2017 for its first certified mission, the OIG report says. But it is skeptical: “Notwithstanding the contractors’ optimism, based on the information we gathered during our audit, we believe it unlikely that either Boeing or SpaceX will achieve certified, crewed flight to the ISS until late 2018.”

The report has been written prior to yesterday’s Falcon 9 launchpad failure, which will certainly impact the schedule negatively.

Essentially, the report claims that the program was delayed initially by about two to three years because of the refusal of Congress to fund it fully. The delays to come will be instead because of the technical challenges. While I tend to agree with this assessment, I also note that government reports like this are often designed to generate more funds for the agencies involved, not find a better way to do things. If we are not diligent and hard-nosed about how we fund this program I worry that with time commercial crew will become corrupted by the government’s sloppy and inefficient way of doing things, and become as bloated as Orion and SLS. This is one of the reasons I never complained when Congress short funded the program previously, as it forced the companies involved to keep their costs down.

0 comments

A visit to OSIRIS-Rex clean room

NASA recently gave a press tour of the clean room where the asteroid probe OSIRIS-Rex is being prepped for its September 8 launch, and one reporter from that tour wrote a very nice description of what it was like.

After such a tour, most reporters write up stories that describe the spaceship, its mission, and its status. This reporter however did something better. He wrote up what it’s like to enter a clean room for a mission only weeks from launch.

Our belongings have been lined up in a row alongside us. And then the dog arrives.

It’s a beautiful specimen of a german shepherd, long and enthusiastic, being led by a sturdy military-type with a buzzcut wearing what looks like mercenary gear. The dog is led down the row of belongings once. Then twice. Then he and his owner head back to their truck and drive off. We have passed. We are free to go into the blessed blast of cool air on the bus that’s been idling alongside us for what seems like hours, but has really only been about 15 minutes.

And that’s only the start. Read it all. Quite fascinating.

2 comments

Contact re-established with dead solar satellite

Good news! After almost two years since contact was lost, NASA has re-established communications with Stereo-B, one of two solar research satellites designed to study the hemisphere of the Sun that does not face the Earth.

NASA re-established contact with a wayward sun-watching science satellite Sunday nearly two years after the spacecraft suddenly dropped off line during a test, the agency said in a statement Monday. NASA’s Deep Space Network, or DSN, “established a lock on the STEREO-B (spacecraft’s) downlink carrier at 6:27 p.m. EDT,” NASA said in a statement. “The downlink signal was monitored by the Mission Operations team over several hours to characterize the attitude of the spacecraft and then transmitter high voltage was powered down to save battery power. “The STEREO Missions Operations team plans further recovery processes to assess observatory health, re-establish attitude control and evaluate all subsystems and instruments.”

This is a big deal. Not only is it a testament to the spacecraft’s good design, it demonstrates the skill of the engineers at NASA who have regained contact.

1 comment

Costs rise on Obama’s asteroid mission

The year delay in Obama’s as yet unfunded unmanned asteroid mission, a preliminary to a proposed manned asteroid mission, has caused its budget to grow from $1.25 billion to $1.4 billion.

More significantly,

NASA’s cost estimate for [the unmanned] ARRM excludes launch and operations. In a March 2016 report, the Government Accountability Office (GAO) review of NASA’s major programs showed a cost of $1.72 billion. Gates explained that the $1.72 billion includes the launch vehicle cost, set at approximately $500 million as a placeholder since NASA has not determined which of three launch vehicles will be used (Delta IV Heavy, Falcon Heavy, or the Space Launch System).

…The next administration will have to decide if the costs are worth the benefits. Although NASA has decided they are, the House Appropriations Committee disagrees. It denied funding for the program in its report on the FY2017 Commerce-Justice-Science (CJS) appropriations bill, which funds NASA. The bill has not passed the House yet, however, and there is no similar language in the Senate version, so NASA is not currently prohibited from spending money on the project.

So far, NASA has been funding this Obama project by stealing money from other projects in NASA, since Congress has consistently refused to appropriate extra money for it. This approach has worked up until now, as they are only funding initial design work. Where they think they will get the money for a full mission however remains a complete mystery to me.

0 comments

The status of SLS for its first launch in 2018

Link here. The article gives an excellent and detailed overview of where construction of SLS presently sits, what the problems are that still remain, and what they have done to overcome them.

What struck me most however in reading the article was how long it takes them to do anything. For example, it appears they will assemble the rocket in the spring of 2018 for a December launch. In fact, the description of this assembly in this article partly explains to me why SLS will have the ungodly slow launch rate of at best once every two years.

In addition, the article describes how NASA has handled a number of engineering issues that have come up, and for each the approach seems to me to be more complicated than necessary. However, I am not an engineer and have never been part of this kind of work. Maybe everyone does it this way.

12 comments

Aerojet Rocketdyne gets NASA contract for cubesat engine

The competition heats up: Aerojet Rocketdyne has signed a contract with NASA to develop a small thruster engine for use on cubesats.

The MPS-130 green propulsion system will allow CubeSats and SmallSats to increase their capabilities, such as extending mission life, increasing architecture resiliency, maneuvering to higher and lower orbits, and performing complex proximity operations and formation flying. The use of additive manufacturing also reduces the number of parts and amount of time required to fabricate and assemble the modular propulsion system, lowering the cost of small satellites for private and public operators. Under the contract, Aerojet Rocketdyne will deliver a fully-integrated MPS-130 green modular propulsion system for flight demonstration, as well as conduct development and validation testing.

The press release does not say how much money NASA is providing. Regardless, this is a great opportunity for Aerojet Rocketdyne, because the smallsat industry is I think about to take off, and at the moment these tiny satellites lack any useful technology for maneuvering. Up until now they were mostly designed as temporary short term satellites built mostly to teach students. Soon, however, there will be a lot of privately-built commercial smallsats launched, designed to make money. Being able to sell their builders a thruster that could prolong their life and make them more capable will give Aerojet Rocketdyne a product that will certainly sell like hotcakes.

1 comment

Cruz visits NASA

In taking his family on a tour of the Johnson Space Center, Senator Ted Cruz (R-Texas) also met with some local industry businessmen where he expressed support for NASA as well as a desire to get ISS extended to 2028.

Cruz did not take questions from the media, though they were present during the meeting with businessmen. In reviewing the local press reports of that meeting (of which the above link is the most detailed), it appears that Cruz was mostly there to firm up his local constituent support by mouthing vague but strong support for NASA. It also appears that he as yet does not have a clear understanding of NASA’s full circumstances, or if he does he is leaning down the pork road to gain votes.

When my policy paper appears I intend to make sure his office gets it. By his actions after that we shall then see how sincere Ted Cruz really is about fiscal responsibility and private enterprise.

0 comments

NASA finalizes more cubesat deals for first SLS launch

Lockheed Martin and NASA have signed a deal to put a science cubesat on the first SLS rocket, planned for an unmanned launch of Orion in 2018.

The adapter ring that connects Orion to the rocket will include 13 bays for CubeSats, shoe-box sized payloads that until now haven’t been delivered in significant numbers into deep space. Each of those payload operators is working to finalize contracts with NASA for the ride into space, and on Monday, Lockheed Martin announced a few details of its 6U CubeSat, called SkyFire. Lockheed’s payload will capture high-quality images of the Moon. And in exchange for the ride into deep space, NASA will receive data from the mission.

“The CubeSat will look for specific lunar characteristics like solar illumination areas,” James Russell, Lockheed Martin SkyFire principal investigator, said in a news release. “We’ll be able to see new things with sensors that are less costly to make and send to space.”

This is without doubt a great opportunity for Lockheed Martin and others to test the use of a cubesat in interplanetary space. Whether it makes sense to use SLS to launch them is another matter entirely.

0 comments

NASA delays asteroid redirect mission one year

NASA has decided to delay by one year the planned launch dates for both its unmanned and manned missions to an asteroid.

And why might you ask?

Mr. Gerstenmaier further stated that “We had trouble getting the funding together for this thing. So this slip of the one year that you see wasn’t caused by technical. It was really caused by budget availability. We just didn’t have the budget available to go do this.”

Also, the article notes that the launch rocket for the unmanned mission, now set for 2021, will be one of three possible rockets.

No elaboration was given as to what those “three rockets” are, though SLS, one of SpaceX’s Falcon family of rockets, and Atlas V are understood to be the prime contenders at this time.

The unmanned mission might happen (though I wouldn’t bet on it). As for the manned mission, there is a reason NASA has had trouble getting funding. SLS/Orion cost too much. Congress simply doesn’t want to spend that much for the actual missions. They will dole out a lot of cash for development (and the pork that goes with it), but even they can’t afford the gigantic budgets NASA needs to actually fly real missions.

3 comments

Sierra Nevada preps for Dream Chaser glide tests

The competition heats up: In preparing its Dream Chaser engineering test vehicle for glide tests in California this fall, Sierra Nevada unveiled it to the press yesterday.

This is essentially the test vehicle’s first public viewing since its one glide test, when the front landing gear did not deploy correctly and the vehicle was damaged during landing. Since the landing gears were not the gears being developed for the flight craft, and since the glide test itself went well, both the company and NASA considered that glide test to be a success.

It has now been refurbished for new tests in conjunction with the company’s contract to use Dream Chaser as a cargo ship for NASA.

0 comments
1 71 72 73 74 75 116