SpaceX launch today

SpaceX is scheduled to resume launches at Kennedy, after a month of range upgrades by the Air Force. You can watch it live here, or here.

Launch is presently scheduled for 12:31 Eastern time to send a Dragon capsule to ISS. At the moment all looks good for an on-time launch.

The launch was a complete success, including a picture-perfect first stage landing at Kennedy.

6 comments

SpaceX completes static fire for next launch, advances its Falcon Heavy prep

Capitalism in space: SpaceX today successfully completed its routine dress rehearsal static fire in preparation for a Monday launch of a Dragon cargo capsule to ISS.

Two items of note regarding this launch. First, it will be the last cargo capsule launched by SpaceX that has not been used before. From now on they plan on recycling all cargo ships, and have actually shut down the production line building new cargo capsules. Instead, they want to focus on building new upgraded manned Dragon capsules.

Second, even as this launch goes forward, with the first stage expected to land at Kennedy on their landing pad there, they are building the second landing pad at this same site to accommodate the planned November first launch of Falcon Heavy. For that launch, the two side mounted first stages will return to Kennedy, while the core stage will land on a barge in the ocean.

2 comments

SES agrees to a second Falcon 9 launch with used first stage

Capitalism in space: SES has agreed to launch a second commercial satellite using a previously flown Falcon 9 first stage.

The launch of the SES 11 spacecraft, also named EchoStar 105, will be the third time SpaceX has sent a customer’s satellite into orbit with the help of a reused rocket stage. Industry officials said SES, EchoStar and SpaceX agreed in recent weeks to shift the satellite from an all-new rocket to one with a previously-flown first stage. The SES 11/EchoStar 105 satellite will likely ride a Falcon 9 first stage that first flew Feb. 19 with a Dragon supply ship heading for the International Space Station, one source said, but a firm assignment has not been confirmed. That vehicle returned to a vertical touchdown at Landing Zone 1 at Cape Canaveral Air Force Station.

Liftoff from a Florida launch pad is scheduled no sooner than around Sept. 27, a couple of days after a United Launch Alliance Atlas 5 rocket is set to haul a classified payload into orbit for the National Reconnaissance Office, the U.S. government’s spy satellite agency.

The most wonderful aspect of this is how routine it is steadily becoming.

0 comments

SpaceX now one of the world’s most valuable companies

Data from a new round of investment capital fundraising says that SpaceX is now valued at $21 billion, placing it among the only six venture-backed companies worth more than $20 billion.

The article also notes that this new valuation is up from the $12 billion listed only two years ago.

Update: As noted by my readers, I have revised the post to note that this story refers not to all companies but to those that obtained their financing privately.

8 comments

The damage and repair of TDRS-M creates complicated scheduling problems

Because of the launch delay caused by the accident that damaged the antenna of NASA’s TDRS-M communication satellite, requiring its replacement, the agency is now faced with a cascading series of scheduling problems.

They are now aiming for an August 10 launch of TDRS-M on a ULA Atlas 5. This will then force a delay in the August 12 launch of a Dragon capsule to ISS to August 14, which can’t be delayed past August 16 because of a scheduled Russian spacewalk on ISS that must happen on August 17 because it involves the release of two satellites. Making things even more complicated is Dragon’s cargo, which includes mice for a rodent experiment. If it doesn’t occur before August 16, the mice will then have to be replaced with fresh mice, causing further delays.

There is then even the chance that these scheduling problems might impact SpaceX’s scheduled August 28’s launch of the X-37B, as well as ULA’s scheduled August 31 launch of surveillance satellite.

One additional tidbit: This Dragon will be the last unused cargo capsule. All future SpaceX cargo missions will use previously flown capsules.

I should add that these scheduling issues illustrate starkly the growing need for more launch sites. There is money to be made here, fulfilling this need.

4 comments

Schedule for commercial manned flights solidifies

Capitlism in space: It appears that the schedule for the first unmanned and manned test flights of the commercial capsules being built by SpaceX and Boeing is getting more certain.

The latest SpaceX schedule calls for an uncrewed test flight in February 2018, followed by a crewed test flight in June 2018. Boeing’s schedule anticipates an uncrewed test flight in June 2018 and a crewed test flight in August 2018.

While this sounds encouraging, the story contradicts a Boeing report last week that suggested their first manned flight would be delayed into the fourth quarter of 2018. Both stories however pin the first unmanned demo flight for June 2018, which now seems to be a firm date.

13 comments

News from SpaceX

Capitalism in space: At the annual convention of the National Space Society, Elon Musk revealed some significant new details about his company’s future engineering and launch plans.

The first two stories are related, as it had been powered landings that SpaceX hoped to use for its Red Dragon Mars landings. Dropping powered landings, at this time, means that the first Dragon mission to Mars will likely not happen in 2020. While Musk outlined a number of good engineering reasons for this decision, to me this quote from the first article was significant:

SpaceX planned to transition from splashdowns, which is how the current cargo version of the Dragon returns to Earth, to “propulsive” landings at a pad at some point after the vehicle’s introduction. Certification issues, he said, for propulsive landings led him to cancel those plans. “It would have taken a tremendous amount of effort to qualify that for safety, particularly for crew transport,” he said.

In other words, NASA was balking at this innovation, and was putting up so many obstacles that it just wasn’t worth the company’s effort at this time. NASA is their main customer for manned launches, and NASA doesn’t like daring or creativity or innovation. The powered version of Dragon will probably have to wait for other private customers looking for a way to get into space.

The third story outlines the engineering challenges that SpaceX has been dealing with in its effort to build the Falcon Heavy, and includes this tidbit from Musk:

With all of these elements in consideration, Mr. Musk is urging caution regarding public expectation for Falcon Heavy’s first flight, saying that there is a “real good chance that the first vehicle [won’t] make it to orbit. So I want to make sure to set expectations accordingly.”

Even more telling was how Musk continued on this point, stating that he hoped Falcon Heavy makes it far enough away from LC-39A before failing so the pad will escape significant damage. “I hope it makes it far enough away from the pad that it’s not going to cause damage. I would consider that a win, honestly,” said Mr. Musk.

Thank God NASA is not involved in the development of the Falcon Heavy. SpaceX would have probably had to abandon this as well.

Meanwhile, this detailed article by Eric Berger gives us Elon Musk’s position on NASA’s contracting system. Not surprisingly, much of what Musk says mirrors what I wrote in Capitalism in Space:

During his remarks Saturday, Musk said NASA could avoid unnecessary delays and costs by transitioning to a system of competitive awards for fixed-price contracts, in which companies are only paid when they meet “milestones” such as completing a flight test or satisfying NASA about the safety performance of a vehicle. Additionally, he said, at least two entities should compete during the development process.

There’s a lot more there, and it is worth a full reading.

5 comments

SpaceX competitors team up to try to block its satellite constellation

SpaceX’s main competitors in creating a satellite broadband industry have all filed objections with the FCC to the company’s planned 4,425 satellite constellation that is aimed at providing worldwide internet access.

SpaceX’s plan to provide global broadband internet access using thousands of satellites in low-earth orbit has come under fire from competitors, including Boeing and OneWeb, according to Space Intel Report. The argument is playing out in a series of filings with the Federal Communications Commission, focusing on SpaceX’s request for a temporary waiver from the FCC’s time limits for putting the satellite system into full operation.

The FCC would typically require the system to provide full coverage of U.S. territory within six years of a license being issued, but SpaceX says that’s not enough time to deploy the full 4,425-satellite constellation. Instead, the company proposes launching the first 1,600 satellites in six years, which would leave the northernmost part of Alaska without coverage when the deadline hits. Full U.S. coverage would be provided after the six-year deadline, SpaceX says.

In their own filings, competitors including OneWeb, SES/O3b and Intelsat are urging the FCC not to waive the six-year requirement, Space Intel Report said.

This is garbage, and demonstrates again why it is dangerous to give government too much power. Rather than compete by launching their own satellite constellations first, these companies want the FCC to put its finger on the scale to favor them and stop SpaceX. And I bet the decision will be made based not on what is right but on who gave the most campaign contributions to the right political party.

6 comments
1 171 172 173 174 175 234