SpaceX successfully test fired today an upgraded engine to be used in the Dragon capsule in case of a launch abort.
SpaceX successfully test fired today an upgraded engine to be used in the Dragon capsule in case of a launch abort.
SpaceX successfully test fired today an upgraded engine to be used in the Dragon capsule in case of a launch abort.
Bill Harward has some details on the cause of the Dragon/Falcon 9 launch delay.
Essentially, nothing seems critical. They found a few minor issues that they felt needed more testing, and are simply making sure these issues are resolved before launch. All in all I find this report very encouraging. Stay tuned.
The Dragon/Falcon 9 test flight is now set for no earlier than late March.
SpaceX has delayed its February 7 launch of Dragon to ISS.
What competition brings: SpaceX outlines its new design goals for Falcon 9 and its Merlin rocket engine.
[U]pcoming upgrades to the engine (Merlin 1D) will provide a vast improvement in performance, reliability and manufacturability β all of which could provide a timely boost to aiding the potential for success for the fully reusable Falcon 9.
Increased reliability: Simplified design by eliminating components and sub-assemblies. Increased fatigue life. Increased chamber and nozzle thermal margins,β noted SpaceX in listing the improvements in work.
Improved Performance: Thrust increased from 95,000 lbf (sea level) to 140,000 lbf (sea level). Added throttle capability for range from 70-100 percent. Currently, it is necessary to shut off two engines during ascent. The Merlin 1D will make it possible to throttle all engines. Structure was removed from the engine to make it lighter.
Improved Manufacturability: Simplified design to use lower cost manufacturing techniques. Reduced touch labor and parts count. Increased in-house production at SpaceX.
That’s just the engine. Most of the article however talks about the company’s effort to make as much of Falcon 9 reusable as possible. Hat tip to Clark Lindsey.
On Thursday, December 15, 2011, NASA management announced what seemed at first glance to be a very boring managerial decision. Future contracts with any aerospace company to launch astronauts to and from the International Space Station (ISS) will follow the same contractual arrangements used by NASA and SpaceX and Orbital Sciences for supplying cargo to the space station.
As boring that sounds, this is probably the most important decision NASA managers have made since the 1960s. Not only will this contractual approach lower the cost and accelerate the speed of developing a new generation of manned spaceships, it will transfer control of space exploration from NASA — an overweight and bloated government agency — to the free and competitive open market.
To me, however, the decision illustrates a number of unexpected consequences, none of which have been noted by anyone in the discussions that followed NASA’s announcement back in mid-December.
» Read more
Superstars of space: Rutan, Allen, Musk, and Griffin have teamed up to develop an air-launch rocket system to fire hardware and humans into orbit.
Their concept calls for Rutan, a noted aircraft designer, to create a carrier jet with a 385-foot wingspan and six engines to ferry a liquid-fueled, 120-foot-long rocket built by SpaceX and outfitted with five main engines to altitude where the winged booster will be released for launch into orbit.
NASA has announced a February 7 launch date for SpaceX’s next test flight of Falcon 9 and Dragon to ISS.
They also have approved allowing Dragon to do a test berth with ISS on this flight, assuming the first test approach goes well.
The next test flight of Falcon 9/Dragon has slipped again.
This article notes how an ISS status report that had indicated approval for a merger of the next two Falcon 9 test flights was premature.
From Clark Lindsey: An ISS status report has confirmed that NASA has combined the next two Dragon test flights into one mission.
More commercial space news; SpaceX is expanding its Florida operations in anticipation of a increased launch rate of Falcon 9 and Dragon capsules in the coming years.
The case against SpaceX. From one of the company’s biggest supporters.
Trent Waddington raises many good points, all of which must be considered to have a clear, educated sense of where the future stands for American manned spaceflight. Two quotes:
The goal of SpaceX is human spaceflight, and the greatest repository of knowledge about human spaceflight is NASA. As such, it would appear obvious that getting NASA to help you to fly humans safely is a good idea. The way to do that is with Space Act Agreements. This is what SpaceX did under the COTS program, and later under the CCDev program.. and they got paid for the privilege. As a result, the Dragon spacecraft will soon be fully qualified as safe for human habitation on orbit as it will be berthed to the ISS and have astronauts inside it.
The problem is that NASA is a precocious customer. They know what they want, they think they know even better than you do how to make it, and they feel no guilt about changing their mind halfway through the project. As such, Space Act Agreements just totally grind NASA’s gears. They don’t have enough control. [emphasis in original]
NASA money is like heroin.. once they start taking it, most people find it very hard to stop. There’s a dependence that has grown between NASA and SpaceX, and although it is obviously a love-hate relationship, it’s going to be very hard for SpaceX to let go.. but, inevitably, they must. The current needs of NASA are very different to the long term goals of SpaceX.
And this:
Fundamentally, SpaceX has a shoddy business case which is best described as a house of cards.. that they’re still trying to play poker with.. and there’s dogs at the table, and they’re smoking cigars! Yeah, metaphor.
Read the whole thing. It’s quite good.