Boeing forced to take another $250 million charge on Starliner

Because of the continuing problems getting its Starliner manned capsule operational, Boeing has now taken another $250 million charge on the project, raising the total spent of its own money to $1.85 billion.

The company’s original fixed-price contract with NASA to deliver the capsule was $4.2 billion. The bulk of that won’t be paid until Starliner begins flying astronauts commercially, and NASA has now delayed that until 2026 at the earliest. The company’s new CEO, Kelly Ortberg, has now made it clear that he is focused on imposing changes to fix the bankrupt engineering management culture that has caused it so many failures in so many of its recent projects, not just Starlner. In his remarks announcing the company’s third quarter results, he said this:

The trust in our company has eroded. We’re saddled with too much debt. We’ve had serious lapses in our performance across the company which have disappointed many of our customers.

In addressing these issues Ortberg listed a whole range of changes, many of which focused on getting managers more closely involved in design and construction, or as he said, management needs “to be on the factory floors, in the back shops and in our engineering labs.”

Whether he will succeed is unknown. Its factory workers today rejected a new contract offer, continuing their now six-week strike that has halted work on company’s airplane business. In addition, Boeing reported a loss of $6 billion in that third quarter report.

One thing Ortbeg did make clear this week however: Boeing is not walking away from its Starliner contract with NASA. At a minimum it will complete that initial fixed price contract. Whether it will go on to fly more Starliner missions however Ortberg left open. I suspect he remains in negotiation with NASA over this issue.

11 comments

Cyprus signs Artemis Accords

Cyprus today officially became the 46th nation to sign the Artemis Accords, its signing coming one day before the already announced planned signing by Chile tomorrow.

Adding both nations to the list, the American-led Artemis Accords alliance now includes the following 47 nations: Angola, Argentina, Armenia, Australia, Bahrain, Belgium, Brazil, Bulgaria, Canada, Chile, Colombia, Cyprus, Czech Republic, Dominican Republic, Ecuador, Estonia, France, Germany, Greece, Iceland, India, Israel, Italy, Japan, Lithuania, Luxembourg, Mexico, the Netherlands, New Zealand, Nigeria, Peru, Poland, Romania, Rwanda, Saudi Arabia, Singapore, Slovakia, Slovenia, South Korea, Spain, Sweden, Switzerland, the United Kingdom, the United Arab Emirates, the Ukraine, the United States and Uruguay.

Should Donald Trump return to the White House it will be very interesting to watch how this alliance evolves in the coming years. The original goal for the accords when started by the Trump administration was to build an alliance with enough clout to overcome the limitations on private property contained by the Outer Space Treaty. Though this alliance is surely now large enough to force those changes, that goal has been mostly pushed aside by the Biden administration. I suspect a new Trump administration will be able to bring it back to life, with added force due to this alliance’s size.

1 comment

Dragon Endeavour undocks from ISS to bring 4 astronauts home

After more than a month delay resulting first from the issues with Starliner and then by poor weather in the splashdown zones, SpaceX’s Endeavour capsule today finally undocked from ISS, with a planned splashdown on October 25, 2024 at approximately 3:29 am (Eastern) off the coast of Florida. I have embedded the live stream of that splashdown below.

The capsules brings home three Americans and one Russian after a seven-month-long mission.
» Read more

0 comments

Review of the four private space stations presently under construction

Link here. The review provides a nice summary of the status of all four stations, being built by Axiom, Vast, and consortiums led by Blue Origin (Orbital Reef) and Voyager Space (Starlab).

The article included one piece of new news, based on recent stories suggesting major financial issues at Axiom:

As a result of these issues, the Axiom Station is believed to have been downsized to two modules from the originally planned four. There will be a reduced research capability from this arrangement compared to what was expected. However, it remains to be seen if additional capability can be added after the station becomes operational.

The original plan had been to separate the station from ISS once all four modules were launched. Whether it will be able to do so, flying independent of ISS’s systems with only two modules is unclear.

3 comments

SpaceX launches 23 more Starlink satellites

SpaceX today successfully launched another 23 Starlink satellites, its Falcon 9 rocket lifting off from Cape Canaveral in Florida.

The first stage completed its 18th flight, landing on a drone ship in the Atlantic.

The leaders in the 2024 launch race:

103 SpaceX
48 China
11 Russia
11 Rocket Lab

American private enterprise now leads the rest of the world combined in successful launches 120 to 71, while SpaceX by itself now leads the entire world, including American companies, 103 to 88.

2 comments

October 23, 2024 Quick space links

Courtesy of BtB’s stringer Jay. This post is also an open thread. I welcome my readers to post any comments or additional links relating to any space issues, even if unrelated to the links below.

  • NASA negotiating with China about research access to Chang’e-5 lunar samples
    The law requires NASA to bring in the FBI in such negotiations to make sure the talks will not release American technology to the Chinese. According to NASA’s administrator Bill Nelson, NASA has not yet done this, but intends to before any samples are delivered to the U.S. In other words, he is violating not only the letter but the spirit of the law, designed to keep China away from American space assets.
5 comments

A pointy mesa once washed by theorized Martian ocean

A pointy mesa on Mars
Click for original image.

Today’s cool image returns to the same region yesterday’s cool image visited. The picture to the right, cropped, reduced, and sharpened to post here, was taken on July 21, 2024 by the high resolution camera on Mars Reconnaissance Orbiter (MRO). It was clearly taken to get a close look at this unusual pointy mesa.

MRO elevation data says this mesa is about 800 feet height. The color difference between the north and south flanks suggests the accumulated presence of dust on the north, suggesting the prevailing winds here come from the northeast and blow to the southwest. This conclusion is reinforced by the dark accumulated dust found in the southwest quadrants of all the crater floors in the full image. The wind blows this dust into the craters, where it gets trapped against the southwest crater wall.

Note the mesa’s wide base, with one crater partly eaten away on its eastern edge. The overall shape of this base suggests that it was carved by some flow coming from the southwest, as indicated by the arrow.
» Read more

0 comments

A slight bend in one boom delays NASA solar sail flight

Even though NASA’s solar sail test mission, dubbed the Advanced Composite Solar Sail System (ACSSS), successfully unfolded its giant sail in late August, engineers have not yet reactivated the sail’s attitude control system because they have detected a slight bend in one of the sail’s four booms.

While the solar sail has fully extended to its square shape roughly half the size of a tennis court, the mission team is assessing what appears to be a slight bend in one of the four booms. This likely occurred as the booms and sail were pulled taut to the spacecraft during deployment. Analysis indicates that the bend may have partially straightened over the weeks since boom deployment, while the spacecraft was slowly tumbling.

The attitude control system was turned off as planned during the deployment, allowing the sail to slowly tumble. It has been kept off longer than expected because the tumbling appears to be helping straighten the bend.

Once the control system is reactivated, the mission will then attempt to use the sail to change its orbit, to actually fly in space using sunlight like the wind.

0 comments

ULA begins stacking Vulcan for military launch, anticipating Pentagon approval

Though the Space Force is still reviewing the nozzle issue on the second flight of ULA’s Vulcan rocket and has not yet certified the rocket for military operational launches, ULA has begun stacking the next Vulcan for an anticipated military launch of a national security satellite.

On Monday [October 21], ULA shared photos of the 109.2-foot-long (33.3 m) booster being hoisted into the Vertical Integration Facility to begin the stacking process. In the days and possibly weeks to come, the 38.5-foot-long (11.7 m) Centaur 5 upper stage will be added along with four solid rocket boosters and the payload fairings.

It appears that the military has accepted Vulcan for this launch because — despite the nozzle falling off of
a strap-on side booster — the rocket was successful in placing its payload in its precise orbit. The Space Force is simply completing the paperwork required for certification.

No date however has been set, but the company hopes to complete two military Vulcan launches in 2024, so it won’t be that far in the future.

7 comments
1 33 34 35 36 37 191