Possible ebola exposure at CDC

Government marches on! As many as a dozen scientists might have been mistakenly exposed to ebola at an Atlanta CDC lab.

The potential exposure took place Monday when scientists conducting research on the virus at a high-security lab mistakenly put a sample containing the potentially infectious virus in a place where it was transferred for processing to another CDC lab, also in Atlanta on the CDC campus.

The CDC statement is remarkably uninformative. From what little they say, it appears as if the sample was left out uncovered in the lab as people came in and out. It also suggests that this unsecured sample was also transferred improperly to another lab.

No need to worry however. Just like its previous investigation of errors in the handling of anthrax, CDC officials are on the case, doing investigations and writing press releases, just so us ordinary citizens won’t get worried and cut their funds.

0 comments

NASA builds a $349 million test stand it knows it will never need

SLS marches on! Though Obama cancelled the Constellation rocket program in 2010, NASA continued to build a $349 million engine test stand for that rocket, finishing the tower in June 2014.

The test stand was also significantly over budget. It now sits useless, since the SLS rocket will use a different untested engine in its upper stage during its first manned flight.

It is every important to underline the chronology here. The rocket was cancelled in 2010. Construction on the test stand continued however for four more years, partly because of decisions by NASA management and partly because of mandates forced on them by Congress.

Stories like this illustrate why I think the political clout of SLS is weak. The program is too expensive, is riddled with waste, and it can’t accomplish anything anyway, making it a perfect target for both muckraking journalists and elected officials who want to make a name for themselves saving the taxpayer’s money. And both have a perfect inexpensive and successful alternative to turn to: private space.

2 comments

A new Russian heavy lift rocket amid Russian budget woes

The competition heats up: Even as Russia today successfully placed a commercial satellite in orbit on the 400th successful Proton rocket launch, Russian sources indicate that — despite budget woes fueled by the drop in oil prices — Russia is moving ahead with the design and construction of a heavy-lift rocket capable of competing with NASA’s Space Launch System (SLS).

From the last link above:

By 2013, Roskosmos drafted a very preliminary roadmap toward the development of heavy and super-heavy launch vehicles. Not surprisingly, it matched closely the strategy that NASA had followed since 2011 within the Space Launch System, SLS, project.

…As the American SLS project, Russian super-heavy launcher plans envisioned building a rocket with a payload of 80-85 tons in the first phase of the program. A pair of such rockets would be enough to mount a lunar expedition. In the second phase of development, the rocket would be upgraded to carry unprecedented 130-180 tons of payload in order to support, permanent lunar bases, missions to asteroids and expeditions to Mars.

As much as I remain a skeptic of SLS, it has apparently struck so much competitive fear in the Russian leadership that they are now willing to try to copy it. Much like the 1980s, when the Soviet rulers bankrupted their nation trying to duplicate American projects like the Strategic Defense Initiative and the Space Shuttle, Putin is now repeating that error all over again. His country has experienced almost a quarter-century of strong economic growth since the fall of communism because, during that time, they focused on capitalism, private enterprise, freedom, and a bottom-up economic structure. Now, they are beginning to abandon that approach and return to the top-down, centralized system of government planning.

As it did in previous century, it will bankrupt them again in this century. Though the Russian government is denying the reports that they are going to trim their space budget, their government’s budget is going to suffer from the drop in the price of oil. Something will have to give.

Update: This review of a book about modern Russia is definitely pertinent: The Land of Magical Thinking: Inside Putin’s Russia

2 comments

Another reasonable look at this week’s Congressional budget deal.

Link here.

Mitchell correctly notes that this deal occurred because of the reality of divided government. While Republican leaders have often acted like weak-kneed wimps, there still remains a limit on how much they can get, not controlling two-thirds of the government. As I noted earlier in discussing the science budget, the federal budget is no longer growing uncontrollably, evidence that the voters’ wishes from 2010 and 2014 are beginning to be heeded.

Only when we have elected more conservatives will it then start to shrink.

1 comment

A more positive conservative take on the budget deal

Link here. I think Lambo nails it. The deal might not be ideal, but it is only the beginning, and was written when Republicans only control one house of Congress, and still pushes back at many Democratic-passed initiatives.

Next year that changes. If we do not see significant cuts in the budget from Republicans when they control both houses of Congress I will then join the many conservatives who justly distrust the Republican leadership and want their heads.

4 comments

NIH panel recommends cancelling multi-billion dollar study

An government advisory panel has recommended the NIH cancel a controversial nationwide study to track the health of 100,000 children.

The study has already cost one billion, has had two scientists resign because they didn’t like how the study was being run, and has as yet only enrolled 4,000 children.

Update: The NIH officially cancelled the study later the same day the panel’s report was released.

0 comments

Science spending steady in proposed Congressional budget

The proposed budget deal announced by Congress yesterday essentially leaves level the overall spending on science.

I have a spreadsheet where I track the budgets of the various science agencies in the federal government, and from this I can say that since the Republicans took control of the House in 2010 the funding has remained very steady. Despite the partisan screams from the left that Republicans are destroying science, all these science agencies have pretty much gotten stable funding in the past four years.

Nonetheless, much of this funding could be trimmed significantly, as there is enormous featherbedding and pork among these science agencies. That won’t have a chance of happening until next year, when the Republicans control both houses of Congress. Even then, Obama and much of the Republican leadership will oppose significant cuts, Obama because he wants to see increases and the Republican leadership because they wish to maintain the status quo.

The unending growth in these budgets, routine from the 1970s through the 2000s, has definitely ceased. I also expect the political pressure to cut these budgets to grow with time. The newer Republican members of Congress tend to be much more radical than their leadership, and are much more willing to slash budgets radically.

0 comments

NSF accused of misuse of funds in giant ecological project

The National Science Foundation (NSF) and a contractor have been accused by both an audit and by Congress of a significant misuse of funds in a major ecological monitoring project costing almost a half a billion dollars.

With a construction budget of $433.7 million, NEON is planned to consist of 106 sites across the United States. Arrays of sensors at each site will monitor climate change and human impacts for 30 years, building an unprecedented continental-scale data set. Although some initially doubted its merits, the allure of big-data ecology eventually won over most scientists.

But a 2011 audit of the project’s proposed construction budget stalled three times when, according to the independent Defense Contract Audit Agency (DCAA), NEON’s accounting proved so poor that the review could not be completed. Eventually, DCAA issued an adverse ruling, concluding that nearly 36% of NEON’s budget proposal was questionable or undocumented.

When the NSF green-lit the project, the agency’s inspector-general ordered the audit released on 24 November, which found unallowable expenses including a $25,000 winter holiday party, $11,000 to provide coffee for employees, $3,000 for board-of-directors dinners that included alcohol, $3,000 for t-shirts and other clothes, $83,000 for “business development” and $112,000 for lobbying.

Republican members of Congress have since been attacking NSF for this lax management. And though the amount of funds apparently misused does not seem very large compared to the size of the entire contract, I am willing to bet that this audit only uncovered a tiny portion of the misuse. Based on the recent behavior of federal agencies, I would expect this to only be an indicator of much worst abuse that is still buried behind stone-walling.

A side note: Remember how only a few weeks ago the NSF head was claiming that a shortage of funds was the reason they were unable to cure ebola. What really happened was that they were too busy spending money having parties to do their job.

3 comments

Launch abort system installed on Orion for December test flight

Engineers have installed a test version of the launch abort system (LAS) for the first test flight of the Orion capsule in December.

The LAS will not be active during the uncrewed EFT-1 mission, but during future missions it will be equipped to act within milliseconds to pull the spacecraft and its crew away from its rocket so that Orion could parachute safely back to Earth.  While the abort motors  are inert and not filled with solid fuel, the LAS will have an active jettison motor so that it can pull itself and the nose fairing away from the spacecraft shortly before Orion goes into orbit. The flight test will provide data on the abort system’s performance during Orion’s trip to space.

Based on what I know of the Orion/SLS launch schedule, I don’t think NASA ever intends to test it during a full launch of the SLS rocket. For one thing, the rocket is too expensive and NASA can’t afford to waste a launch just to test this one component. For another, the rocket’s development is too slow as it is, with the first launch not scheduled until 2018 and the first manned flight not until 2021, at the earliest. If they add a launch test of the abort system, NASA might not fly an SLS manned mission until late in the 2020s.

Meanwhile, NASA is sure insisting that SpaceX do such tests. And they will, since their capsule and rocket is affordable and quick to launch. What does that tell us about the two systems? Which would you buy if you were the paying customer?

Oh wait, you are the paying customer! Too bad you your managers in Congress don’t seem interested in managing your money very wisely.

3 comments
1 211 212 213 214 215 239