Russia has announced that they will resume Proton rocket launches in September.

Russia has announced that they will resume Proton rocket launches in September.

Though they have pinpointed the specific cause of the most recent launch failure, they have not yet announced any remedial actions. Note also the expected number of launches for the rest of the year, 4 to 5, is down from earlier expectations.

Meanwhile, in Kazakhstan, an official in that country’s space program has been arrested for taking bribes.

0 comments

My rant Thursday against politicians on the John Batchelor Show

On my Thursday appearance last week on the John Batchelor Show John and I devoted the entire segment to talking about the sad state of NASA and how the partisan bickering in Congress is not only failing to deal with those problems, that bickering is intentionally disinterested in actually fixing them. As I say,

What both those parties in Congress and in the administration are really doing is faking a goal for the purpose of justifying pork to their districts, because none of the proposals they’re making — both the asteroids or the moon — are going to happen.

I intend to elaborate in writing on this subject in the next day or so. In the meantime, here is the audio of that appearance [mp3] for you all to download and enjoy.

Note that I specifically talked about the following stories during this appearance:

4 comments

SpaceX has confirmed that it plans to begin vertical take-off and landing tests of a full scale Falcon 9 first stage.

The competition heats up: SpaceX has confirmed that it plans to begin vertical take-off and landing tests of a full scale Falcon 9 first stage.

The tests would be in New Mexico’s spaceport, and are essentially a scaled up version of the Grasshopper tests the company has been doing in Texas. It appears they are going to do these ground-up tests in conjunction with attempts on each future Falcon 9 launch to land the first stage.

1 comment

The state of SLS construction.

The state of SLS construction.

The article is mostly focused on the engineering challenges of building a new rocket out of old pieces of the space shuttle. Kind of reminds me of Frankenstein. Nonetheless, I do get the impression for the first time that this heavy lift rocket will be built, and will fly at least once.

After that, however, I expect it to die from lack of funds. In fact, its history will probably parallel that of the Soviet Union’s Energia rocket, which flew twice, once to launch their shuttle copycat Buran and once to lift a failed payload whose purpose has never been clearly revealed. Soon thereafter came bankruptcy and the end of the Soviet Union, which couldn’t afford such a monstrosity. SLS will likely see a similar fate.

5 comments

SpaceX has signed a contract with MDA to launch all three of Canada’s next generation Radarsat satellites.

The competition heats up: SpaceX has signed a contract with MDA to launch all three of Canada’s next generation Radarsat satellites.

MDA’s willingness to go with SpaceX prior to the September 5 launch of its Cassiope satellite on the Falcon 9 illustrates again the confidence they have in SpaceX. At the same time, this contract is for launches expected to occur around 2018, which is a long way away. Much can happen till then, including the possibility that SpaceX will go bust.

In other words, right now it is the successful launch of Falcon 9 that is of significance, not these new contracts. Only if those launches succeed will these contracts then become really significant.

0 comments

Aerospace defense contractors Boeing, Lockheed Martin, Northrop Grumman, and Raytheon all show better than expected profits despite sequestration.

Chicken Little report: Aerospace defense contractors Boeing, Lockheed Martin, Northrop Grumman, and Raytheon all show better than expected profits despite sequestration.

It seems that each of these companies, finding their profits from defense pork to be relatively flat or dropping slightly, worked harder to sell their other products to other customers, and were generally successful. What a concept!

2 comments

The developmental engineering successes of the new commercially-built private spaceships, Dragon, CST-100, and Dream Chaser, appears to be winning over Congress.

The developmental engineering successes of the new commercially-built private spaceships, Dragon, CST-100, and Dream Chaser, appears to be winning over Congress.

The article linked above is mostly about Boeing’s effort with its CST-100 spaceship, but within it was this significant paragraph:

Last week, the House Appropriations committees approved $500 million and Senate appropriators $775 million for commercial crew development as part of NASAโ€™s 2014 budget. The first figure is well below the Obama administrationโ€™s $821 million request, a figure NASA Administrator Charles Bolden has characterized as essential to meet the 2017 objective. Nonetheless, agency and company managers believe legislators are losing their skepticism over a program that has so far committed $1.4 billion to competing vehicle designs from SpaceX, Sierra Nevada, Boeing and others. [emphasis mine]

Congress is still insisting that NASA spend far more for the Space Launch System (SLS), but they do appear to be increasingly less interested in cutting the new commercial crew program. Eventually, a light will go off in their dim brains and they will realize how much more cost effective this program is compared to SLS. I expect this to happen sometime in the next three years, It is then that SLS will die.

Note that I don’t have any problems at all with the above cuts to the commercial program. It is far better to keep these private efforts on a short leash, thereby forcing the companies to stay lean and mean, than to give them a blank check (as has been done in the past and with SLS) and thus allow them to become fat and lazy.

1 comment

India has set August 19 as the launch date for its home-built Geosycnchronous Satellite Launch Vehicle (GSLV).

The competition heats up: India has set August 19 as the launch date for its home-built Geosycnchronous Satellite Launch Vehicle (GSLV).

Their last attempt to launch this rocket three years ago ended in spectacular failure. A success here would allow India to become a serious player in the launch market, thereby increasing the competition and thus helping to lower prices and encourage innovation.

0 comments

SpaceX has begun assembly of the upgraded Falcon 9 rocket that will launch its first commercial payload in early September.

The competition heats up: SpaceX has begun assembly of the upgraded Falcon 9 rocket that will launch its first commercial payload in early September.

This launch has been significantly delayed because the company was testing the actual engines to be used in the rocket, and had a series of engine aborts during testing (as outlined in the article above). Once the engines completed a full duration burn last week, however, the way was cleared for launch.

The article is very detailed, and also outlines the other new features of the upgraded Falcon 9 rocket to be flown for the first time in September. I must admit that this list makes me nervous. A lot rides on the success of this launch, both for SpaceX and for the entire new commercial space industry.

2 comments
1 822 823 824 825 826 896