The Dream Chaser test vehicle to fly again

The competition heats up: Sierra Nevada has announced that its Dream Chaser engineering test vehicle has been refurbished and will complete a number of manned and unmanned flight tests in the fall, with their schedule on track for a November 2016 orbital test flight.

“We will do between two and five additional flights. A couple will be crewed. As a result of the vehicle being upgraded, we will be flying our orbital flight software, which will give us about a yearโ€™s worth of advancement on the vehicle.” Flights are expected to last over a six- to nine-month period, he adds.

Sierra Nevada has also continued to expand its partnerships, both in the aerospace industry as well as with other countries. The first action is likely part of a lobbying effort to help convince NASA to choose it when it down selects its commercial manned program from three manned spacecraft to two later this year. The second action indicates that even if Sierra Nevada is not chosen by NASA, they plan to proceed to construction anyway to serve other customers.

52 comments

Orion first test flight scheduled

NASA has set December 4 for the first test flight of Orion.

In related news, the Navy has successfully completed a splashdown recovery test of Orion.

I haven’t labeled these stories “The competition heats up” because I have serous doubts Orion or SLS will survive the next Presidential election, even if this test flight on a Delta 4 Heavy rocket is a complete success. And if you want to know why, just read the first article above. It lists the long troubled ten-year long history of this capsule, with the following punchline describing the schedule for further launches with the actual SLS rocket:

While the first SLS/Orion mission, known as EM-1, is still officially manifested for December 15, 2017 โ€“ internally that date has all-but been ruled out. Internal schedules shows EM-1 launch date as September 30, 2018, followed by the Ascent Abort (AA-2) test โ€“ required for crew launches โ€“ on December 15, 2019, followed by EM-2 on December 31, 2020.

I find also find it interesting that in describing the many problems Orion has had in development, the article fails to mention the cracks that appeared in the capsule that required a major structural fix. Nor does the article mention the ungodly cost of this program, which easily exceeds $10 billion and is at least four times what NASA is spending for its entire program to get three different privately built spaceships built in the commercial program.

27 comments

Dragon launch abort tests scheduled

The competition heats up: SpaceX has scheduled its Dragon launch abort tests for November and January.

The Hawthorne, California-based company plans to conduct a pad abort test at Cape Canaveral Air Force Station, Florida, in November, followed by an in-flight abort test from Vandenberg Air Force Base in California in January, Garrett Reisman, SpaceX Dragon Rider program manager, said here Aug. 6 at the American Institute of Aeronautics and Astronautics Space 2014 conference.

In the pad-abort test, Dragon will be mounted to a mocked-up SpaceX Falcon 9 rocket and use its hydrazine-fueled SuperDraco thrusters to boost itself up and away from the pad, as it might need to do in the event of a major problem just before or during liftoff. The in-flight test will attempt to repeat the feat at altitude.

In related news, two former SpaceX employees who were terminated in July when the company laid off about 400 people in an annual restructuring of its workforce have sued the company for not giving them ample notice as required by California law.

The California law is pretty clear, which means these employees will likely win, which also sounds to me like a good reason to shift SpaceX’s entire operation to Texas and its new spaceport in Brownsville.

3 comments

Congress applies pressure to ULA and the Air Force

Two congressional committees are holding up approval of a budget revision for the Air Force’s launch program because of concerns about cost overruns and the program’s dependency on a Russian rocket engine.

Such requests must be approved by each of the four congressional defense committees, and so far, the EELV proposal has won the support of only two. The Senate Appropriations Defense subcommittee and the House Appropriations Defense subcommittee have green-lighted the plan, while the House and Senate Armed Services committees have deferred approval, according to budget documents dated July 25 and July 31, obtained by Defense News.

[The Senate Armed Services Committee] (SASC) asked the Air Force to draw up a plan, by Sept. 30, โ€œthat leads to the production of a liquid rocket engine by 2019,โ€ according to one of the documents, sent to Pentagon Comptroller Michael McCord by SASC Chairman Carl Levin, D-Mich.

Meanwhile, others legislators are questioning the program’s cost overruns. Though only hinted at in the article, this hold up is also related to SpaceX’s demand that the bidding for Air Force launches be opened up to competition.

0 comments

China to build a new canal in Central America

The competition heats up: With approval from Nicaragua, China has inched closer to beginning construction of a new canal that would connect the Pacific and Atlantic oceans.

A month ago, a Nicaraguan committee approved Chinese billionaire Wang Jing’s project to create The Nicaraguan Canal. With a planned capacity to accommodate ships with loaded displacement of 400,000 tons (notably bigger than The Panama Canal), the proposed 278-kilometer-long canal that will run across the Nicaragua isthmus would probably change the landscape of the world’s maritime trade.

“The project is the largest infrastructure project ever in the history of man in terms of engineering difficulty, investment scale, workload and its global impact,” Wang told reporters, adding that with regard the project’s financing, which is around $50 billion, Wang seems quite confident, “If you can deliver, you will find all the world’s money at your disposal.”

16 comments

Video of the Falcon 9 first stage doing a soft splashdown

Video taken from a chase plane during the July 14 Falcon 9 launch shows the first stage appearing from out of the low clouds, engines firing, vertical and ready for landing. The video, below the fold, also shows the stage slowing just before it hits the water, much like the test vehicles Grasshopper and Falcon 9R do.

Though SpaceX has already claimed their first stage had done this during the July 14 launch, this video proves it. All they need to do now to recover their first stage is to direct it to a land-based landing site.

Hat tip to Doug Messier and Parabolic Arc for this story.
» Read more

3 comments

U.S./Russian owned launch company ILS cuts workforce by 25%

The competition heats up: Business loses because of its recent Proton launch failures, combined with strong market competition from SpaceX, today forced International Launch Services (ILS) to cut its work force by 25%.

The company is anticipating a launch rate drop from an average of 7 to 8 missions a year down to 3 to 4. The article also noted one more additional detail that will affect the future market value of Proton:

So far in 2014, the commercial satellites ordered have been mainly at the lighter end of the market for geostationary-orbiting telecommunications spacecraft. This follows a couple of years in which heavier satellites dominated.

Commercial Proton rockets are typically used to launch heavier satellites one at a time. The marketโ€™s move to lighter spacecraft has benefited Space Exploration Technologies Corp. of Hawthorne, California, whose Falcon 9 rocket has accumulated commercial orders; and also benefited Arianespace, whose Ariane 5 heavy-lift vehicleโ€™s lower position is reserved for smaller satellites.

The weight of commercial satellites is almost certainly going to continue to drop in the coming years as technology improves and satellite companies work to reduce the cost to launch. In that climate, the Proton’s ability to put big commercial payloads into orbit will become a liability, not an asset. Ariane 5 has the same problem, in that it still needs a big payload for its upper position in order to make a launch cost effective.

Both Falcon 9, with its very low launch costs, and Russia’s new Angara rocket, with its modular design to handle all kinds of payload sizes, are better suited to this new competitive market.

1 comment

SpaceX’s next commercial launch set for tomorrow

The competition heats up: Just three weeks after its previous commercial launch SpaceX is scheduled to put AsiaSat 8 into orbit at 1:25 am tomorrow.

If Tuesday morning’s launch goes well, SpaceX will follow it with another commercial launch just three weeks later, also for Asiasat.

The article above notes how this will be the first launch for Asiasat from the U.S. in more than a decade. They had switched to Russian launchers because of cost and the difficulties of working under U.S. security requirements. The security problems still remain, but might be solved if SpaceX builds its own private spaceport.

William Wade, AsiaSat president and CEO, is excited for the upcoming launches, but confirmed the company’s experience here has not been as easy as at other launch sites. Access to Cape Canaveral Air Force Station for roughly 60 employees, shareholders and customers now in town โ€” most not U.S. citizens and many who are Chinese nationals โ€“ has been difficult. “That is proving to be somewhat cumbersome,” Wade said. “We have to go through all the security clearances, which is expected, but we are finding as a foreign company that it is a bit more difficult conducting our launches there.”

0 comments

Russia outlines its space exploration plans for the next two decades

At a science conference in Moscow on Saturday the director of Russia’s Space Research Institute described in detail the future exploration plans for the Russian space program.

According to the story, Russia plans to return to the Moon and Mars with unmanned probes. He also described how the first missions will be in partnership with Europe, followed by Russian missions designed to test and prove the technologies. If these flights go well, in 2024 Russia will consider trying again with a repeat of the Phobos-Grunt mission that failed in 2012

This last detail is a change from previous reports that said Russia would launch Phobos-Grunt 2 in 2018. It is also consistent with much of the Russian program for the last two decades (as well as most of NASA’s own ambitious manned exploration program), where the agency makes bold announcements of future plans but somehow with each new announcement the dates for the actual launch have always been pushed back. The actual flight never seems to happen.

0 comments

Don’t buy stock yet in that “impossible” space drive

The uncertainty of science and engineering: A physicist takes a close and skeptical look at the “impossible” space drive that NASA engineers discovered seemed to work. Key quote:

“All in all,” Lee concluded, “it will take a lot more information before we can judge whether the thrust is really a thrust or not.”

Read the whole article. They point out the areas of doubt and weakness, as well as the possibilities.

0 comments
1 691 692 693 694 695 784