Spanish company gets grant to develop smallsat rocket

The competition heats up: A Spanish company has gotten a $2.4 million grant from the European Commission to develop a smallsat rocket.

The EC Horizon 2020 funds bring the Elche, Spain-based startup to more than 9 million euro raised to build the Arion 1 sounding rocket and the Arion 2 orbital rocket. PLD Space co-founder and chief business officer Raúl Verdú said in a Jan. 10 statement that the company anticipates “the closing of an A2 investment round of 8 million Euro very soon.

PLD Space anticipates a first launch of Arion 1 in 2019, followed by the Arion 2 rocket in 2021. Both debut missions have slipped by one year from the company’s previous estimates. Around 70 percent of the technology needed for Arion 1 will overlap with Arion 2, according to PLD Space. The company hopes to make both rockets reusable using a mixture of parachutes and propulsive landing.

I haven’t done a detailed survey, but I think this brings the number of smallsat rockets under development right now to at least six: Rocket Lab, Japan’s SS-520, China’s Kaituozhe-2, Vector, Interorbital and PLD Space. Russia and India have also said they plan to develop a small rocket for this market, though no details yet exist.

I have been repeatedly told by other space experts that it makes no financial sense to launch smallsats on single small rockets. Yet, we now have numerous companies and investment dollars going to develop such rockets. I think that this only illustrates how little trust everyone should place in experts (even me!).

14 comments

Arianespace aims for 14 launches in 2018

The competition heats up: Arianespace officials told reporters today that it plans to complete 14 launches in 2018, which would be a record for the company.

For 2018, the company is targeting seven launches of the Ariane 5 model, four launches for the Soyuz model and three launches of the Vega satellite launcher.

Isn’t competition wonderful? SpaceX forces everyone to lower their launch prices, and instead of going out of business, which the old rocket companies were saying would happen for decades should they be forced to drop prices, everyone gets more customers, more business, and more profits. I am shocked, shocked!

Whether Arianespace can maintain this growth however is another story. As newer rocket companies, such as Blue Origin, come on line with even lower costs, I am not sure their more expensive rockets will survive.

1 comment

ArianeGroup to begin production of first Ariane 6 rocket

Capitalism in space: Having completed a new review of the design of its new Ariane 6 rocket, ArianeGroup and ESA have decided to begin production for a planned launch in 2020.

I continue to wonder how they expect this expendable rocket to compete for launch business with both SpaceX and Blue Origin flying reusables by 2020. At best, I see the member states of the European Space Agency saddled with the requirement to use this more expensive rocket, which will seriously handicap them in the competition to settle the solar system.

5 comments

Europe commits $107 million for new rocket and space plane

The European Space Agency (ESA) today allocated $107 million to develop both a new larger version of its Vega rocket as well as an orbital version of the spaceplane engineering test vehicle flown in 2015.

The Vega-E will be larger and will give them another rocket capable of competing for launch business, but the space plane project is more interesting.

ESA awarded 36.7 million split between Avio and Thales Alenia Space Italy for Space Rider, an unmanned spaceplane capable of lifting 800 kilograms to LEO for missions up to two months. A single Space Rider should be capable of six missions with refurbishing, according to Thales Alenia Space.

Space Rider leverages technology from ESA’s Intermediate Experimental Vehicle (IXV), which performed a suborbital mission in February 2015, landing in the Pacific Ocean. Unlike its predecessor, Space Rider is designed for ground landings. ESA tasked Thales Alenia Space with building Space Rider’s reentry module based on the IXV.

It seems Europe wants its own version of X-37B and Dream Chaser.

0 comments

Europe finally begins to realize that reusability cuts costs

Capitalism in space: Faced with stiff and increasing competition from SpaceX, European governments are finally beginning to realize that their decades of poo-pooing the concept of rocket reusability might have been a big mistake.

In what was likely an unexpected question during a Nov. 19 interview with Europe 1 radio, French Economy and Finance Minister Bruno Le Maire was asked if SpaceX meant the death of Ariane.

“Death? I’m not sure I’d say that. But I am certain of the threat,” Le Maire said. “I am worried.” Le Maire cited figures that are far from proven — including a possible 80% reduction in the already low SpaceX Falcon 9 launch price once the benefits of reusability are realized. “We need to relfect on a reusable launcher in Europe, and we need to invest massively in innovation,” Le Maire said.

Then there was a report out of Germany that has concluded that SpaceX commitment to reusability is about to pay off.

The article also cites those in Europe and with the U.S. company ULA that remain convinced that they can compete with expendable rockets. In reading their analysis, however, I was struck by how much it appeared they were putting their heads in the sand to avoid facing the realities, one of which has been the obvious fact that SpaceX has been competitively running rings around them all. This is a company that did not even exist a decade ago. This year it very well could launch more satellites than Europe and ULA combined.

8 comments

ESA to lead international effort to track falling Chinese space station

The European Space Agency has taken the lead position in an international effort to track China’s falling Tiangong-1 test space station module.

The goal of the effort is to improve the accuracy of predicting the fall of such objects. Tiangong-1, at 8.5 tons, is big enough for some pieces to survive re-entry and crash to the ground. Improving the predictions of where it will fall will reduce the chances of the debris causing harm.

I first read of this effort from this news story, which contained in its last sentence one piece of interesting news having nothing to do with Tiangong-1:

The next such launch [of a Chinese space station module] will be of the Tianhe core module around 2019 on a new Long March 5B rocket, the country’s largest and most powerful so far. [emphasis mine]

It appears China has quietly renamed its big Long March 5 rocket, adding a “B” to the name. This name change strongly indicates what I have suspected for months, that the July launch failure has required China to significantly redesign the rocket. Apparently, the poor performance of the rocket’s first stage engines was caused by fundamental design problems.

0 comments

Motor for ArianeGroup’s next generation rockets ready for testing

Capitalism in space: The first full scale solid rocket motor for ArianeGroup’s next generation rockets, the Ariane 6 and the Vega-C, is now ready for testing.

The P120C is the largest solid-propellant rocket motor ever built in one segment. Each P120C will hold over 140 tonnes of propellant in a carbon fibre casing almost 11.5 m long and about 3.4 m in diameter. It is derived from Vega’s current first stage motor, the P80, which holds 88 tonnes of propellant.

The design builds on existing expertise and lessons learned with Vega’s P80, and it increases Vega performance with Vega-C. Two or four P120Cs will be strapped onto Ariane 6 as boosters for liftoff.

The use of this solid rocket on both the upgraded Vega-C and the larger Ariane 6 illustrates how the privately controlled ArianeGroup is trying to reduce costs. In the past, Arianespace would have had different companies within the ESA build different solid rockets for Vega-C and Ariane 6 in order to distribute the work to different member countries, even though having two different development contracts would have increased costs.

1 comment

Canadian Inuit officials demand halt to rocket launch

The coming dark age: Canadian Inuit officials are demanding that the launch of a European atmospheric research satellite by a converted Russian ICBM be stopped out of fear of the pollution it might cause.

The position of the rocket company is based on calculated engineering:

In a statement to CBC News, the European Space Agency insisted the fuel won’t reach Earth’s surface. “Please remember that under standard pressure, hydrazine boils at 113.5 C,” the agency said. The stage containing the fuel will re-enter Earth’s atmosphere much hotter than that, it said. “The structural parts lose their integrity and by melting the destruction of the stage occurs. The agency said that six kilometres above the ground “the propellant components have completely burnt up.”

The position of the protesters is based on fear and lack of knowledge:

The concern for Inuit is the rocket’s second stage, which contains hydrazine-based fuel and is expected to splash down in the North Water Polynya. Though it’s outside of Canada and Denmark’s international waters, it’s home to a vast array of birds and marine mammals that Inuit rely on for food.

“It’s the birthing ground of all the animals that we eat, that people in the North depend upon,” said Eva Aariak, Canada’s commissioner on the Inuit Circumpolar Council and former Nunavut premier. “I know it’s being played down in terms of the kind of effect it would have, but nobody knows. This is the most concerning part is that nobody really knows. And before people know exactly what kind of effect it can have, we will keep fighting.” [emphasis mine]

The article also interviews a pro-Inuit scientist whose primary evidence apparently comes from a youtube video.

There is no doubt that hydrazine is very toxic, which is why it is generally not used as the launch fuel for rockets. However, these protests appear based on mindless fear, almost like the protesters were primitive tribesman afraid of thunder. Ah, but maybe that is exactly what they are!

13 comments

ArianeGroup struggles with the concept of reusability

Capitalism in space: ArianeGroup, the company building ESA’s next generation rocket Ariane 6, is debating when and if it should introduce reusability into its design.

[Patrick Bonguet, head of the Ariane 6 program,] said ArianeGroup is studying reusability with Prometheus “in order to be sure to take the right path at the right moment.” Those efforts are mostly to prevent Europe from being caught flat-footed in the wake of other reusable launch systems, namely from SpaceX and now also Blue Origin.

Reusability is far from a primary focus, however. “We still have not understood, would we save money by reusing? At least with our launch rate?” he asked. “We hope to launch 12 times a year. If we reuse 12 times, that means we only manufacture one time per year. It is difficult for us to have that.”

Bonguet said reusability would essentially erase the production efficiencies ArianeGroup is striving for, starving the Ariane 6 industrial base of the work upon which it relies. A smaller tip-toe into reusability could come through salvaging Ariane 6’s payload fairings. Swiss manufacturer Ruag Space is developing reusable fairings, which Bonguet said are of interest to ArianeGroup.

I guarantee that by the mid-2020s they will entirely be “caught flat-footed” if they have not begun by then the use of reusable rockets.

12 comments

ArianeGroup’s transition to Ariane 6 rocket

Link here. It appears that this transition not only includes replacing Ariane 5 with Ariane 6, but also the phase out of Russian Soyuz rockets by 2022. This loss of business is going to hurt Russia, as the government there desperately needs cash with the drop in oil prices.

The article also noted that ArianeGroup will charge two prices for Ariane 6, depending on configuration and payload, $85 million and $130 million per launch. These prices seem high, but because they likely cover the launch of two satellites, customers will be charged half these amounts, $40 million and $65 million, which is competitive in today’s market.

Will these prices be competitive in 2020s? I have my doubts. I estimate, based on news reports, that SpaceX is charging about $40 million today for a launch with a reused first stage, and $62 million for a launch with an entirely new rocket. Give them another five years of development and I expect those prices to drop significantly, especially as they shift to entirely reused first stages for almost every launch and begin to demonstrate a routine launch cadence of more than one launch per month.

This quote below explains how ArianeGroup really intends to stay alive in the launch market:

The price targets assume that European governments — the European Space Agency, the European Commission, Eumetsat and individual EU nations — agree to guarantee the equivalent of five Ariane 62 missions per year, plus at least two missions for the light-lift Vega rocket.

In other words, ArianeGroup really doesn’t wish to compete for business. It wants to use government coercion to force European space agencies and businesses to buy its product. They might get that, but the long term result will be a weak European presence in space, as everyone else finds cheaper and more efficient ways to do things.

5 comments
1 23 24 25 26 27 40