SpaceX to resume launches at second launchpad in December

Capitalism in space: SpaceX plans to resume launches in December at its second Kennedy launchpad that was damaged in the September 2016 explosion.

This means that after the mid-November launch of Northrop Grumman’s Zuma payload, they will begin the reconfiguration of that launchpad for Falcon Heavy. Initially the company had said it would take two months to complete that work, which would push the first Falcon Heavy launch into 2018. More recently they say they can get the work done in six weeks. Either way, this suggests that the first attempt to launch Falcon Heavy around the first of the year.

Posted on the road from Tucson to the Grand Canyon. This weekend I am running a new cave survey project there, and we are hiking down this afternoon, with the plan to hike out on Monday.]

5 comments

Boeing’s Starliner undergoing drop tests

Capitalism in space: Boeing’s Starliner manned capsule yesterday successfully completed the 11th of 14 drop tests in preparation for launch.

The article includes extensive comments by two NASA astronauts who are working with Boeing on these drop tests. I found this quote interesting:

[Sunita] Williams and [Eric] Boe said there are benefits and drawbacks to either type of landing, but they preferred land over water. Williams speaks from experience: She has already made a land landing aboard a Russian Soyuz capsule. “When you land on land, maybe it’s a little bit harder,” Williams said. “But when you’re coming down at high speed, the water’s hard, too.

“Landing on water, if somebody’s right there to rescue you and they know exactly where you’re coming down, that works. And we’ve shown that works with the Apollo program. But, landing on water — I’m a Navy guy, there’s a big ocean out there and it’s a little space capsule and there’s some definite risks to that, too.

“Landing on the Soyuz, you open the hatch, you smell the grass, you’re not in a huge rush to get out or stay in. You know you’re in a solid place and you know you can take your time getting out and the rescue forces will be there eventually, if they’re not there knocking on the door.”

The article also noted that Boeing plans to refurbish each capsule and reuse it up to ten times.

0 comments

Today in fascist academia

Time for another update on the growing movement on American campuses to squelch freedom of speech. The stories below highlight some of the more egregious examples since my last update.

Note also that I am making a point to identify the university in every headline I link to. If you have children who are about to pick a college, a quick search here at Behind the Black will tell you where a college stands on the first amendment and free speech.

No one should be surprised that three of these stories come out of California, which in recent years has become increasingly hostile to the concept of dissent.

All is not bad news, however. The Board of Regents that runs the University of Wisconsin two weeks ago approved a new policy that would suspend and expel students who disrupt speeches and presentations on campus.

This tidbit from the story reveals once again which political party today believes in free speech, and which political party does not.

The new Wisconsin policy mirrors Republican legislation the state Assembly passed in June, though the Senate has yet to act on the bill. Regents President John Robert Behling told the board before Friday’s vote that adopting the policy ahead of the legislation shows “a responsiveness to what’s going on in the Capitol, which helps build relationships.”

Republican Gov. Scott Walker appointed all but two of the board’s 18 members. State public schools Superintendent Tony Evers and Wisconsin Technical College System Board President Mark Tyler are automatically regents by virtue of their offices.

Evers, a Democrat running against Walker in next year’s gubernatorial election, cast the only dissenting vote. He accused the regents of sacrificing free speech to curry favor with Republican lawmakers.

1 comment

Lockheed Martin earnings down due to its commercial space divisions

Capitalism in space: Lockheed Martin’s third quarter earnings were down by one percent, partly due to reduced earnings in its commercial space divisions.

While other factors contributed to the drop in earnings, this quote highlights an important detail about the competition in the launch industry:

Reduced profits from Centennial-based rocketmaker United Launch Alliance caused some of LMSS’ decline, the company said. ULA is a joint venture of Lockheed Martin and Boeing Co. LMSS’ share of ULA’s launch-business profits dropped by $20 million to $45 million in the third quarter, the company said.

ULA’s profits dropped by one-third, which suggests that they are continuing to lose business to SpaceX because of its lower launch prices.

2 comments

Vector’s third suborbital test flight set for January 2018

Capitalism in space: The third suborbital test flight of Vector’s Vector-R rocket has been scheduled for January 2018 in Mohave.

Vector has, to date, performed two test flights of the Vector, both only to very low altitudes. The first took place in May in California’s Mojave Desert and the second in August at the future site of Spaceport Camden on Georgia’s Atlantic coast. A third test, [company head Jim] Cantrell said, is planned for January, back in the Mojave Desert.

He raised a note of caution about that test. “We have a high chance of planting that one in the desert, because it’s using thrust vector control. We’re taking the training wheels off,” he said.

The article is mostly about Vector’s deal to launch from Wallops Island, which I noted last week. Much of that however is public relations that is far from reality. The important thing now is for Vector to finish its test program and prove its rocket can reach orbit.

0 comments

SpaceX barge damaged from fire after 1st stage landing

The drone barge used by SpaceX to successfully land a 1st stage during its October 11 launch was subsequently damaged by a fire on board during the return to port.

The exact series of events is unclear, but it is understood the booster leaked some of its residue RP-1 fuel, which flowed along the deck of the ASDS and pooled near the containers at the aft of the drone ship.

The booster then continued post-landing operations, designed to safe the booster ahead of crews boarding the ship to complete the safing process ahead of the trip back to port. At some point shortly after landing there was an ignition of the pooled RP-1, likely via the purging of the Triethylaluminum-Triethylborane (TEA-TEB) that is used as the first stage ignitor. This has to be purged as part of the safing procedures for allowing crew near the rocket. Fire hoses – staged on the deck of the ship – quickly doused the fire. However, the garage containing the robot – nicknamed “Roomba” or “OctaGrabber” (among other names) – was caught in the fire and damaged.

This was confirmed by the lack of the robot in view under the rocket during the ASDS’ return to Port.

It appears they are repairing the damages and that future barge landings will not be affected.

0 comments

Could North Korea use its missiles to fill orbital space with debris?

Link here. While most of the discussion about the missile threat from North Korea has focused on the possibility of it detonating a nuclear bomb high enough to cause an electromagnetic pulse (EMP) that would disable most electronic equipment, this article notes that they could much more easily do almost as much harm by simply using their ballistic missiles to fill low-Earth-orbit (LEO) space with space junk, thus disabling much of the world’s military surveillance and reconnaissance satellites.

I am not sure how much of a threat this might be, but I find the article somewhat worrisome because it proposes something that seems quite reasonable and doable, with the technology that North Korea appears to have, right this minute.

12 comments

NASA still hasn’t established a baseline cost for SLS’s future missions

Despite being told to do so in an 2014 GAO report, NASA has still not developed a budget to determine what it would cost to use SLS for any future beyond-Earth-orbit missions.

Worse, NASA says it doesn’t have to do this.

The government report notes that it previously recommended to NASA and Congress that costs of the first (and subsequent) human missions be calculated and disclosed three years ago in 2014. Since then, the report says, a senior official at NASA’s Exploration Systems Development program, which manages the rocket and spacecraft programs, replied that NASA does not intend to establish a baseline cost for Exploration Mission 2 because it does not have to.

This response must have struck investigators with the General Accountability Office—Congress’ auditing service—as a bit in-your-face. Later in the report, the director of acquisition and sourcing management for the accountability office, Cristina Chaplain, notes that, “While later stages of the Mars mission are well in the future, getting to that point in time will require a funding commitment from the Congress and other stakeholders. Much of their willingness to make that commitment is likely to be based on the ability to assess the extent to which NASA has met prior goals within predicted cost and schedule targets.” [emphasis mine]

In other words, NASA expects Congress to give NASA and SLS a blank check, forever. Sadly, based on the behavior of Congress now and in the past two decades, NASA might very well have reasonable expectations here.

2 comments

Vector signs deal to launch from Wallops

Capitalism in space: Vector has signed an agreement with the Mid-Atlantic Regional Spaceport on Wallops Island, Virginia to do commercial launches of its smallsat rocket there.

Vector Space Systems officials and Virginia Secretary of Transportation Aubrey Layne announced during a demonstration of the Vector-R launch vehicle at Launch Pad 0-B on Wallops Island that Vector has contracted to conduct three commercial orbital missions in the next two years from the Wallops spaceport, with an option for five additional launches.

Vector still needs to complete its test program, as its Vector-R rocket has not yet reached orbit.

1 comment
1 452 453 454 455 456 684